Update on Module Mounting on Staves and Stavelets 25/8/11 1.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Electrical Installation-Module 3
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
EClassroom Standards The University of West Florida.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Russ Rucinski, FNAL VLPC Cryocooler cryostat Status – June 7, 2006.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
Dedicated to freshness Smeva In Focus 1.changed clear dimensions of hinged and sliding doors; 2.changed reveal profile for hinged doors; 3.changed magnetic.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Start Counter Construction Update Eric Pooser 08/21/2014.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Update on new alignment kit update 20/3/ Complete table based on a standard table (2400 x 1200 x 150) and a half table (2400 x 600 x 150).
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
WP4 – Plans for next 6 months
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Endcap assembly update C Buttar, R French UK-V Cluster RAL 8 th Sept 2004.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
MM Status Mostly unchanged (Feb. 3 rd 2016). Parts Mildly modified bridges, allowing to actually move 130nm pickup tools along r*phi –Turned out to be.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
S A Griffiths CM42 June 2015 Electrical & Control.
Berkeley status Aug 10th, 2012.
Stator Plan & Schedule Chris Booth 2nd March 2009
Electric Wiring & Illumination
What is Stave Carrier Frame Required to Do?
TOTEM Electronics Status
Update on Module Mounting on Staves and Stavelets and a description of how the new system will work 11/7/11.
EHN1 Extension planning
Update on module mounting on staves and stavelets 15/3/11
Plan for the installation of the TAMU screen
AWAKE e-spectro update
Teleconference ACS – FREIA 17th October 2017
Services Layout – Update
Teleconference ACS – FREIA 31st October 2017
Far Detector Activities Late 2017 – Early 2018
Equipment for Assembly – UK Experiences
Extension SR1 WP3 Electrical installations
AIDA Asic Heatsinks Prototype received, and approved.
Tests of Endcap capillary & Heat exchangers at CERN
Presentation transcript:

Update on Module Mounting on Staves and Stavelets 25/8/11 1

2 Pipe clamps Stavelet clamps two flavours for US and UK stavelets lid All items electrically connected Stavelet test/shipping box. Two lengths, one for the stavelet with long pipes, 2 for standard length pipes Construction based around ‘ideal’ aluminium extrusion

Frame for light curtain support and overhead cable gantry 3 Overhead gantry is being constructed Awaiting material for frame. Expected WB 22/8/11 Simple bolt together system. Fits standard current table and granite up to 2.5m x 1.2m Prototype runners

4 Granite table (2.5m x 1.2m) Main access door

infrastructure 5 Work to reduce distance from stages Add rotating head for camera

Room Status New fire alarms installed. (but not yet in the electronic room) and not tested. Extra mains sockets installed. Lighting replaced. Awaiting replacement ceiling tiles. (done 23/8/11) Awaiting coupling for vacuum system and final connection into existing system. (done 23/8/11) Discussion about how to move the new granite into position has started with RAL heavy gang. Stages now on temporary table and being wired up. 6 Adhesive Se 4445 delivered 23/8/11 (but note DOM was June 2011) and it’s out of date in December Second batch ordered (with usual 8 /10 week delivery) as this is only made to order. On the question of Intertronics No manufactures value for the thermal conductivity.