Presentation is loading. Please wait.

Presentation is loading. Please wait.

AWAKE e-spectro update

Similar presentations


Presentation on theme: "AWAKE e-spectro update"— Presentation transcript:

1 AWAKE e-spectro update
3/8/2017

2 Calibration light mask

3 More on the calibration source
Calibration light ordered, should arrive end of August. Control electronics is also ordered (CERN Vmod VME card) V. Clerc is now working on blinders compatible with light source.

4 Orders & more Supports are now ordered and should arrive mid-September. Ground drilling will be performed in August (possibly with calibration light holder) Optical table (600x900 mm) should arrive mid August Dark room should be installed on week 37 (4-10 Sept) Access door (yellow fence) and wall on the side of fire door should be dismantled in September, the exact date depending on the supports installation. Fire door window: a frame needs to be produced. Details to be discussed with integration team (M. Arnaud)


Download ppt "AWAKE e-spectro update"

Similar presentations


Ads by Google