EXPERIENCES OF THE MEKONG RIVER COMMISSION IN FLOOD MANAGEMENT AND MITIGATION IN THE LOWER MEKONG BASIN Petrina Rowcroft Development Economist Basin Development.

Slides:



Advertisements
Similar presentations
DROUGHT MONITORING CENTRE - NAIROBI WHAT COULD BE DONE ON DROUGHT WITHIN ISDR PLATFORM?
Advertisements

Thailand water management policy: Case of the Mekong River Basin
FLOODS AND DROUGHTS IN 2002 IN THE CAMBODIAN PARTS OF THE MEKONG BASIN — EXPOSURE, RESPONSE AND LESSON LEARNED — Prepared for THE SECOND ANNUAL FLOOD FORUM,
Flood Management in GBM Basin: A Mechanism for Natural Resource Management Between Co-riparians Priyanka Mallick JNU.
AIACC Regional Study AS07 Southeast Asia Regional Vulnerability to Changing Water Resources and Extreme Hydrological due to Climate Change.
PP 7.1 THE ROLE OF BASIN PLANNERS. The Roles of Basin planners Basin planners have three main roles:  Bringing together knowledge  Identifying stakeholders;
Health Aspect of Disaster Risk Assessment Dr AA Abubakar Department of Community Medicine Ahmadu Bello University Zaria Nigeria.
Integrated Flood Management : the way to Harmonious coexistence with floods Avinash C Tyagi World Meteorological Organisation Geneve, Switzerland A contribution.
Protection and Disaster Risk Reduction (Place) – (Date) Session 6.1: Integrating Protection into Disaster Risk Reduction.
Ghana’s Initial National Communication William K. Agyemang-Bonsu EPA.
World Meteorological Organization Working together in weather, climate and water Panel session on use of satellites in disaster response and mitigation.
Integrated adaptation approach to climate change: Enhancing social and natural climate resilience in the Mekong Geoffrey Blate & Dang Thuy Trang WWF Greater.
Weather, Water, Climate Services Supporting Sustainable Development Jerry Lengoasa Deputy Director General Oslo, May 2014 World Meteorological.
Working Group 4: Urban Governance for Risk Reduction: Mainstreaming Adaptation into Urban Planning and Development Chair: Prof. Shabbir Cheema Rapporteurs:
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
Integrated Watershed Management
23 rd September 2008 HFA Progress Report Disaster Risk Reduction in South Asia P.G.Dhar Chakrabarti Director SAARC Disaster Management Centre New Delhi.
Adressing Floods and Drought in GEF supported TDA/SAPs IWC-7 October 2013 Peter Bjornsen, UNEP-DHI Centre.
End of Basin issues in Mekong Basin
Planning with floods in the Lower Mekong Basin. 1/28 The agenda Regulation.
INTRODUCTINON TO INTEGRATED WATER RESOURCES MANAGEMENT Module 1 Session: What is Integrated Water Resources Management?
IW: LEARN Case study:The Mekong Wetlands Biodiversity Programme Peter-John Meynell UNDP Team Leader 20 November 2004.
Flood Management and Floodplain Ecology 2nd Annual Mekong Flood Forum Marc Goichot Coordinator WWF Living Mekong Initiative (LMI)
PP 5.1: IWRM Planning Framework
MRC Water Utilisation Programme 20 May 2003 Knowledge Base & DSF Software Presenter: Dr Jon Wicks, Software Integration Specialist in association with.
Using the DSF to assess scenarios Some things it will do for you - and some things it won’t.
The 2 nd MRC Annual Flood Forum Oct Phnom Penh-Cambodia Prepared by: Mr. Do Manh Hung, Chief of Planning and Program Management Division -
Investment in Sustainable Natural Resource Management (focus: Agriculture) increases in agricultural productivity have come in part at the expense of deterioration.
Seite 1 Dr. Ashish Chaturvedi May 11, 2011 ekDRM.
Workshop on RISKS AND IMPACTS ON FLOOD FROM EXTREME EVENTS IN ASEAN COUNTRIES Bali, August 5 th 2015.
Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain unchanged Goals updated.
2 International efforts to coordinate Mekong water development started in 1920s – Series of international agreements mainly for navigation and boundary.
1 Basin Development Plan BDP : Planning process & tools to identify, categorise & prioritise joint or basin-wide projects and programs VISION : Contribute.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Concern Worldwide’s Approach to Disaster Risk Reduction.
Assessing Vulnerability and Adaptation to Climate-related Risks A Flavour of SEI Activities Stockholm Environment Institute Frank Thomalla with contributions.
WUP-FIN2 socio - economic and policy analysis WUP-FIN2 Introductory Training – Bangkok MARKO KESKINEN & OLLI VARIS.
2 HISTORY OF MEKONG COOPERATION IRBP Course PP 2.4.
1 Integrated Water Resources Management Training Course Overview p.p. 0.1.
Impact of disasters to socio- economic development in Lao PDR Prepared by PHETSAVANG SOUNNALATH- Director of NDMO/Lao PDR for Regional Workshop on Methodologies.
The Mekong River Commission Presented by Mr. Detsada Soukhaseum, Mekong River Commission Secretariat, 16 November 2015.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 2 APPLICATION OF BASIN PLANNING PRINCIPLES Phnom Penh January 2003.
MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 2 APPLICATION OF BASIN PLANNING PRINCIPLES Phnom Penh January 2003.
The Mekong River Commission: Challenges, Mission, and Strategies.
Asia Flood Network— A USAID Program for Flood Mitigation and Preparedness in Asia Asia Flood Network Program Objective –Identify and fill gaps in end-to-end.
BDP Transboundary Process: Contribution to flood mediation Annual Flood Forum 7-8 April 2005.
MEKONG RIVER COMMISSION RIVER BASIN PLANNING - MODULE 1 INTRODUCTION Can Tho, Vietnam January 2003 Refining Objectives and Developing Scenarios.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
MEKONG RIVER COMMISSION RIVER BASIN PLANNING - MODULE 1 INTRODUCTION Can Tho, Vietnam January 2003 The Art of Scenario Evaluation.
1 Scenario formulation Scenario-based planning is a structured way of thinking about what might happen in the future Scenarios are descriptions of possible.
1 Integrated Water Resources Management Training Course Overview p.p. 0.1.
The BDP planning cycle. Components 4 Project long-listing 3 Strategy formulation 5Shortlisting: Classification & ranking Implementation Development, promotion.
December 2003, Napakuang, Lao PDR Module 3 Scenario-Based Planning for the Mekong Basin Toward a Basin Development Strategy, Lao PDR.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
1 PP 2.3 Development Potentials of LMB Water Resources PP 2.3 Development Potentials of LMB Water Resources.
The Mekong River Commission: Challenges, Mission, and Strategies.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
Climate Change Threat Sea-Level Rise 1. Potential Impacts from Sea-Level Rise How might our community be impacted by sea-level rise? 2.
WHY IS INTEGRATED RIVER BASIN PLANNING IMPORTANT? Module 1 pp 1.1.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 3 SCENARIO-BASED PLANNING for the MEKONG BASIN Napakuang, Lao PDR 8-11 December.
People  science  environment  partners Economic, Social and Ecological Issues in the Lower Mekong Basin Countries Mahfuzuddin Ahmed WorldFish Center,
Monitoring and DSF CEO, 11 May 2016 Nexus Workshop, Melia, Hanoi, Vietnam.
A Presentation to the 2017 GEO Work Programme Symposium,
Challenges in a Changing World
The EU strategy on adaptation to climate change
Gender mainstreaming in environmental
Challenges in a Changing World
Presentation transcript:

EXPERIENCES OF THE MEKONG RIVER COMMISSION IN FLOOD MANAGEMENT AND MITIGATION IN THE LOWER MEKONG BASIN Petrina Rowcroft Development Economist Basin Development Plan Regional Workshop on Methodologies of Assessment of Socio-Economic Impacts of Disasters in Asia and their Application for Poverty Eradication and Economic Development

ContentContent Context MRC approach to flood management and mitigation Impact Assessment

Mekong River Commission In 1995, the four governments of Cambodia, Lao PDR, Thailand and Viet Nam signed an Agreement for the Sustainable Development of the Lower Mekong Basin

VisionVision “ Economically prosperous, socially just and environmentally sound ”

GoalsGoals Enhanced economic and social well-being Improved living standards of the basin inhabitants Optimisation of the multiple use and mutual benefits of all riparians Minimising the harmful effects that might result from natural occurrences and man- made activities

DEALING WITH FLOODS MRC focus is on: – Regional and transboundary water-related issues and impacts. – Local impacts dealt with by line agencies together with international and civil society organisations. MRC provides supplementary services – Predictive assessment using various basin development planning scenarios (BDP) – Analysis and assessment of flood-related impacts (FMMP) – Balanced approach …

Flood Benefits After-flood abundance of fish Flushes the Mekong Delta to protect from salinity intrusion Aids fish migration to spawning grounds and recharge of Tonle Sap Great Lake Deposition of essential sediments for soil fertility Often attracts large amounts of foreign investment for flood rehabilitation

Flood Costs Loss of life (> 800 people during 2000 floods) Loss of agricultural productivity (measured using agricultural potential) Damage to infrastructure Impediment to navigation and trade

Flood Management & Mitigation Programme (FMMP) Flood Management & Mitigation Strategy – formulated in response to 2000 floods Based around four groups of management areas to reduce flood risk and flood hazard across the floodplain

Land-use Planning Measures are aimed at ‘ keeping people away from the floodwaters ’ Structural Measures are aimed at ‘ keeping floodwaters away from the people ’ Flood Preparedness Measures recognise that - no matter how effective the above types of management measures are – an overwhelming flood will always occur. Flood Emergency Measures deal with the aftermath of such an event by ‘ helping affected people to cope with floods ’. Flood Management

Integrated Floodplain Management Requires an integrated and coordinated mix of management measures Must reflect: – the flooding, flood risk and flood hazard characteristics of the particular floodplain – the specific social and economic characteristics of the flood-prone communities – environmental and resource management plans and policies for the floodplain.

Flood Preparedness 23 hydrological monitoring stations provide real-time data on observed and forecast water levels Observed levels published daily on MRC website ( Also provide weekly flood forecasts and yearly data

Coming Soon … Establishment of a regional FMM Centre Studies, policy discussions on land use planning and infrastructure development in relation to flood impacts (BDP) Flood proofing measures Flood forecasting, warning and dissemination services Mediation services Analysis of risk and impacts Strengthening of capacity to manage flood emergencies

Basin Development Plan (BDP) Working towards the formulation of a management strategy and plan for the Lower Mekong Basin (LMB) Scenario-based planning approach – External conditions (e.g. climate change) – Human interventions Requires multi-level predictive assessment – current focus is on strategic level

Impact Assessment in the BDP Tools being developed for assessment of impacts resulting from scenarios – Decision Support Framework (DSF) – RAOM – SEA – SIA – MCA and expert opinion Results used to focus planning efforts by ranking development scenarios (e.g. most preferred to least preferred)

BDP shortlistBDP strategy Regional initiatives National plans BDP longlist MRC Agreement Consultation & Negotiation Assessment criteria MCA Assessment framework Compare & rank ScenariosAnalysis of impacts Expert opinion RAOM SEA DSF Scenario formulation WaterEnvironmentSocial & economic

Impact analysis Impacts of different scenarios are described using expert opinion and models (DSF) – hydrological – environmental – social – economic Impacts may be poorly understood / little data available / difficult to quantify – particularly for social and economic impacts – work with existing knowledge – qualitative / descriptive vs quantitative DSF DSF and other sources

Socio-Economic Impact Assessment of Floods in BDP Significance of impacts related to flood timing, flood depth and flood duration DSF provides hydrological data and simulation models to show extent of floods under different development conditions Knowledge base contains spatially referenced data (GIS) which assists in prediction of socio-economic and environmental impacts Most socio-economic assessment done outside of the DSF

Flood depths

Flood durations

Examples of spatial data in the DSF – Inundation map in Aug & Sept 2000 – Major cities in the LMB – Village centres (Lao & Cambodia)

DSF Application to environmental and socio- economic assessment Environmental impacts by reference to changes in flow conditions Impacts on land-use potential and value by reference to the extent, duration and timing of flooding on lands of different classes

Potentially impacted population (PIP) Geo-referenced population data obtained from village-level census (population and number of households) in Cambodia and Laos. Flood duration data (flood defined as > 0.5m) Sum of population * flood duration = no. of person days flooding Provides clear indication of where impacts most felt and therefore provides a focus for basin development planning in terms of flood management and mitigation measures

Flooding DSF gives changes in extent and duration of flooding, and information about the type of land flooded (land use, wetland type) NO information on impact on ecosystems impact on fish production value of reduced damage from floods as a result of dams ….etc Flooded area (ha) Trey riel catch Before dam After dam Flooded area (ha) Cost of flood damage Before dam After dam

Environment - wetlands GIS in DSF gives location of wetlands, and some information on type NO information on response of wetland plants or animals to changes in flow how changes would affect subsistence use value of wetland produce and how this would change

Social Impacts GIS in DSF gives location of villages population some information on social conditions (from Census, provincial level) NO information on subsistence livelihoods resettlement options and preferences cultural values ethnic minorities …..etc

Economic impacts GIS in DSF gives some information on land use, irrigation NO information on value of agricultural production (at present) non-agricultural industries value of power generated costs of relocation

BEYOND THE DSF …

Social Impact Assessment BDP currently in process of developing indicators and assessment framework based on Sustainable Livelihoods Approaches (Assets, Capabilities, Vulnerability, etc) Participatory – requires understanding of how different people relate to different resources (differential impacts on gender, ethnic groups, income groups, etc)

Economic Impact Assessment Quantitative assessment of relative costs and benefits of flooding – Changes in agricultural productivity (based on potential value) – Loss of life – Replacement costs of damaged infrastructure – Opportunity costs of limited/no access to infrastructure – Impacts upon subsistence users (opportunity costs of limited access to/availability of natural resources) – Upstream and downstream impacts (e.g. loss of fish has implications on suppliers of fishing gear and fish production facilities) – Environmental-economic impacts difficult to quantify as relationships not yet fully understood (e.g. floods and fish productivity)

Potential for application of ECLAC Methodology?

Thank you