- Overview of the subsystems - The Photodetector Module and its components - The Data Processing and its components - The Power Pack - Summary of subsystems.

Slides:



Advertisements
Similar presentations
Photoreflectance of Semiconductors Tyler A. Niebuhr.
Advertisements

Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
Electronic Voting System Bruno Edson (bemaf) Daniel Oliveira (dmo) Domingos Menezes Neto (drmn)
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
RockSat-C 2011 CDR Virginia Tech RockSat 1 Robbie Robertson Chris Gates Younes Taleb.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
HK & LVPS for EUSO –TA / -Balloon G. Medina-Tanco, L. Santiago, H. Silva Lopez, F. Trillaud, C. Lopez, J. Rojas, A. De la Cruz, S. Guerrero, G. Leon.
- Purpose - Main sequences - Resources (manpower and GSE), including location -Main activities of the assembly and integration of the subsystems -Final.
End of phase A meeting CNES (Toulouse) 2/02/2012 Ph. Gorodetzky APC - Paris Diderot1 High Voltage power supplies HV Switches Design: J. Szabelski, J. Karcmarczyk,
- Grounding - Harness Shielding - PDM Electrical Architecture - DP Electrical Architecture EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Pierre.
EUSO-BALLOON CDR – Agenda (I). Internal interfaces overview Batteries and Low Voltage power Supplies PDM interfaces DP interfaces HK Interfaces List of.
experimental platform
Eusoballoon optics characterisation Camille Catalano and the Toulouse team Test configuration Calibration of the beam Exploration of the focal plan.
- Software block schemes & diagrams - Communications protocols & data format - Conclusions EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE F. S.
- Battery Pack Technical Specifications - Battery Pack Design Descriptions - Battery Pack Connection Diagram - Battery Pack Architecture EUSO-BALLOON DESIGN.
EUSO BALLOON Battery Power Pack (PWP) RIKEN/UAH Héctor Prieto, Katsuhiko Tsuno, Marco Casolino.
Data processor description, development plan and risk analysis Giuseppe Osteria INFN Napoli Toulouse, February 2, 2012 Euso Balloon Phase A Review Giuseppe.
DESIGN OF THE HATCH OF THE INSTRUMENT BOOTH OF EUSO-BALLOON version v1.2 Writer : SYLVIE DAGORET- CAMPAGNE Final tests and Health tests1
IR CAMERA EUSO BALLOON JEM-EUSO Balloon CDR, CNES, Toulouse. December 18, 2012 José Santiago Pérez Cano. Orbital Aerospace, Madrid, Spain. Héctor Prieto,
Andrea Santangelo, Kepler Center-Tü Toulouse, February 2, 2012 “The Organization of the EUSO- Balloon mission” Andrea Santangelo * Kepler Center for Astro.
- Where are the entry points of the instrument - Physical External links - Overview of the External Interfaces - Status - Conclusion EUSO-BALLOON DESIGN.
Configuration.
Recommendation and actions EUSO EUSO-BALLOON FLIGHT REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Wrap up previous actions.
- Recommendations status - PRR Review report: actions - Conclusion EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Status.
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
EUSO BALLOON phase A review CNES, Mechanical design of the instrument approach for integration and tests Peter von Ballmoos, IRAP Toulouse.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Earth Atmosphere.
SECCHI Consortium Meeting, July 2001 SECCHI Ground Data Systems and Data Processing Nathan Rich NRL/Interferometrics
The whole instrument Tests performed Conclusions EUSO-BALLOON, EUSO-BALLOON flight review 04/06/2014 P. Barrillon on behalf of the many hard workers involved.
The EC-UNIT P. Barrillon on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse.
The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse.
- Introduction - Procurement status - Main milestones EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Schedule.
- Timeslots for the EUSO-Balloon flight - The campaign organization DESIGN FLIGHT REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris, France.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
HOUSEKEEPING HK at Balloon-EUSO 10 th JEM-EUSO meeting from December 5 th to 10 th at RIKEN, Tokyo By G. Medina-Tanco*, A. Zamora, L. Santiago Cruz**,
EC_ASIC drawing (1) ASIC BASIC FASIC D 68 pi ns ASIC A 68 pi ns ASIC C ASIC E 120 pins ABCDEF 68 pi ns 68 pi ns 68 pi ns 68 pi ns.
End of phase A meeting CNES (Toulouse) 2/02/2012 Ph. Gorodetzky APC - Paris Diderot1 Euso-balloon Lenses A)Design: - Alex Zuccaro (now at ESTEC) - Yoshiyuki.
HK-status. RS422 (diff) RS232 SPI Trigger rate Analog(V,T) >=4 Analog(V,T)
D.Websdale: RICH Meeting Costs: L0 and L1 Readout Electronics.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
EUSO BALLOON Battery Power Pack (PWP) RIKEN/UAH Héctor Prieto, Katsuhiko Tsuno, Marco Casolino 1.
EMD Overview Walter Katz IBIS Open Forum March 15, 2013.
Anomalies &/or differences with the configuration Explanations, analyzes, impacts Updates EUSO-BALLOON, Flight review 04/06/2014 Guillaume Prévôt (APC)
RICH meeting, F.Muheim1 Proposal for MAPMTs as Photodetectors for the LHCb RICH Franz Muheim University of Edinburgh on behalf of the MAPMT group.
Understanding the data - a first off-line look Sylvie Dagoret-Campagne EUSO-BALLOON Analysis Meeting, October
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
Planning of the EUSO-BALLOON project Sylvie Dagoret-Campagne on behalf of the JEM-EUSO collaboration, EUSO-BALLOON project manager LAL/France EUSO BALLOON.
T HE PDM INTEGRATION P. Barrillon (LAL) & G. Prévôt (APC) On behalf of the PDM crew (Simon, Lech, Philippe, Sylvie B) EUSO-SPB/MiniEUSO progress meeting,
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
Unit 2 Lesson 3 Technology Systems. Big IDEA Big Idea: There are nine “Core Technologies” that are fundamental to all technology systems that must be.
CSNSM SPACIROC S. Ahmad, P. Barrillon, S. Blin, S. Dagoret, F. Dulucq, C. de La Taille IN2P3-OMEGA LAL Orsay, France Y. Kawasaki - RIKEN,Japan I. Hirokazu.
Data Processor Status Hardware Giuseppe Osteria INFN Napoli Paris, October 12, 2012 Euso Balloon 8th progress meeting Giuseppe Osteria INFN Sezione di.
Michel DUPIEUX IRAP Progress Meeting LAL 02/03/ EC interface with PDM.
Data processor Status Giuseppe Osteria INFN Napoli Paris, March 2, 2012 Euso Balloon 4th progress meeting Giuseppe Osteria INFN Sezione di Napoli.
Pierre PRAT Progress the Michel DUPIEUX.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
EC electronic status. Outline Reminders History EC-front unit status EC_ASIC status What next ? 2.
Jean Evrard (CNES), Gilles Roudil (IRAP), Peter von Ballmoos (IRAP) 7 september 2012, LAL current gondola design changes based on - requirement for tunable.
Introduction of the EUSO-BALLOON 9th Progress Meeting Naples, November the 9th, 2012 Guillaume Prévôt, Sylvie Dagoret and Peter von Ballmoos 1 EUSO-BALLOON,
The EC-front development plan and planning S. Ahmad, P. Barrillon, D. Cuisy, S. Dagoret, P. Dinaucourt, R. Sliwa, JL. Socha EC design review – LAL – 1.
Status of the KLYPVE-EUSO detector for UHECR study on board the ISS
M.VIKRAMADITYAN Graduate Student Mechanical Engineering
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
Instrument Overview Larry Springer HMI Program Manager
Presentation transcript:

- Overview of the subsystems - The Photodetector Module and its components - The Data Processing and its components - The Power Pack - Summary of subsystems EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Sylvie Dagoret-Campagne LAL, Orsay, France The EUSO-BALLOON subsystems

CDR – The EUSO-BALLOON subsystems SO-BALLOON subsystems 2 Overview of subsystems and their components

CDR – The EUSO-BALLOON subsystems SO-BALLOON subsystems 3 Overview of subsystems and their components DP : Data processing PWP : Power Pack PDM : PhotoDetector Module ICDV CNES SIREN CNES Batteries CNES

CDR – The EUSO-BALLOON subsystems SO-BALLOON subsystems 4 PDM subsystem and its components EC-HV EC- DYNODE HVPS2 HVPS1 MAPMT EC-ANODE EC-ASIC PDM-B EC-Front EC-Back

CDR – The EUSO-BALLOON subsystems SO-BALLOON subsystems 5 DP subsystem and its components LVPS-DP1 LVPS-DP2 LVPS-PDM LVPS-HK HK CCB CLKB GPSR CPU DST SPACEWIRE /PCI

CDR – The EUSO-BALLOON subsystems SO-BALLOON subsystems 6 The Power Pack PWP box 28 V/225 W /24 H Battery box : Distribution :

Conclusion 4 subsystems TEL : (telescope) OB (Optical Bench) consisting of 3 Fresnel lenses IB (Instrument booth) including electronics and computing DP : 11 components (boards),+ mechanical crate CPU, CLKB,GPSR, HK (6 boards),CCB, 1 unit each LVPS-HK,LVPS-PDM,LVPS-DP1,LVPS-DP2, 1 unit each SpaceWire, DST (commercial), 1 unit each PDM : 5 components (boards) + mechanical frame EC-Unit, (MAPMT+ 3 PCBs), 9 units EC-ASIC (6 SPACIROC1), 6 units PDM-B, 1 unit HVPS1, HVPS2, 1 unit each PWP : 1 battery pack, 1 distribution pack, 1 box CDR – The EUSO-BALLOON subsystems7