156 542 cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the.

Slides:



Advertisements
Similar presentations
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Advertisements

Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Walls crates cables gas chambers electronics CERN adb.
A.Kashchuk Muon meeting, CERN Presented by A.Kashchuk.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Large Cell Scope Pictures HV Gnd 1nF Large Cell Tube Anode signal Cathode signal scope S1 S2 S1 S2 The following scope pictures were all taken with the.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
1 Status of the Test System of the MWPC for the LHCb Muon System Andre’ Massafferri (Universita’ Tor Vergata – INFN sezione II - Roma) V. Bocci, R. Nobrega.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Problems with Muon System N. Bondar O.Maev
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Front-end boards tests G. Auriemma, D. Fidanza G. Pirozzi( $ ) & C. Satriano ( $ ) Present address: European Patent Office, Branch at The Hague, Patentlaan.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
Test on installed RPCs with the gas mixture. Preliminary results. Alessandro Paoloni on behalf of the OPERA RPC Group (Bologna, LNF, LNGS, Napoli, Padova,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Chamber electronics test bench Valerio Bocci Rafael Nobrega, Davide Pinci (INFN sez. Roma) Giovanni Carboni,Andre Massaferri,Roberto Messi, Emanuele Santovetti.
30 September 2005, Frascati Anatoli Kachtchouk) 1 From CARDIAC version 2 to CARDIAC version 3 N.Bondar, A.Kachtchouk, P.Neustroev (PNPI)
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
Muon Meeting Rome Some Results from M3R1 chamber tests at GIF with CARDIAC V.1 Boards Jean-Sebastien Graulich, Anatoli Kachtshuk, Dominik.
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
Status of the Muon detector Alessandro Cardini CERN & INFN Cagliari Thanks do Davide, Rafael, Maurizio, Oleg, for part of the material included here.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
1 26 November 2003, CERN LHCb Muon meeting Anatoli Kachtchouk (INFN Cagliari, PNPI) Final FEE-board conception proposed by Walter Bonivento Sandro Cadeddu.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
09/07/20021Burkhard Schmidt Muon Station M1 Outline: Material Budget –What is the present best estimate of the material budget of a “default” MWPC station.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
G. Carboni for the Muon Group
Noise on chambers M1R4 N.Bondar
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Simone Brusa / INFN – Ferrara On behalf of LHCb muon group:
Presentation transcript:

cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the wall  buy an Al foil to be put on

156 Al sheets, Copper braids, Balconies, clamps installed. Thanks to Stas, Pavel & Pavel

156

Number of HV cables (LHCb muon type): 5; LNF (Paolo) Assuming that 1 HV channel supplies 4 gaps in parallel, the number of CAEN channels 5; We’ll move the existing HV system close to mockup, use two dedicated patch panels providing both 1x4 and 4x4 connections (one CAEN channel per gap, if needed); CERN, PNPI (Anatoli + Petr) Front-end boards: number of SPB boards: 32 cathode and 12 wire type (704 resistors must be CERN  Burkhard), i.e. all chambers mentioned above must be fully dressed forever); CERN Number of CARDIAC boards: 32 positive and 12 negative type; Cagliari (Walter) (150 Positive coming to CERN  Walter ; 12 Neg. CERN) Number of LV cables: 8; LNF (Paolo) Final LV power supply (total current 22A) + Software ; Frascati (Paolo + Michela) Number of LVDS output cables: 44; CERN (Burkhard) Number of I2C cables: 8; CERN (Burkhard) Number of ACQ modules (used as external counters): 7; Roma2 (Andre’) Cables adapters to connect standard LVDS cable from CARDIAC to ACQ: 28; CERN (Anatoli) Software: must show 'panoramic’ (cosmics) view without (exist) and with cabling (Rafael,Andre’) EMI antenna has to be improved: the best case to simulate LHC-clock spectrum; CERN, PNPI Gas mixture lines (with distributor); Emiliano

Maraton sent to CERN (Paolo) One LV board arrived at CERN (Michela) Status of control SW ? (Michela) HV+LV Cables ordered (Paolo) ACQ BOARDS : From Andre’ : I investigated the possibility to get more ACQs for the Test at Building 156- CERN. We have 1 ACQ already available and tested, others 3 have to be fixed and will be available into about 2 weeks. Then Roma2 can provide 4 extra ACQs to the CERN Test, which sum 7 if we include the ones already installed in the Test station. Any other ACQ will be difficult to provide(but not impossible).

SPBs: new resistors tested by Nikolay: Dear gentlemen, I spent more time to continue sparkling these resistors. conditions the same (3KV, 680pF); setup the same. #res. initial resistance sparkles final resistance Ohm Ohm Ohm Ohm Ohm Ohm Ohm Ohm Ohm Ohm Ohm Ohm I think that it is enough measurements to understand that this type of resistors is good for our chambers. Best regards, Nikolay