PHOS APD Bias Control Goal: To develop software for the PHOS APD bias control that uses the agreed ALICE standards for detctor control and coniguration.

Slides:



Advertisements
Similar presentations
TRD-DCS Workshop, Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of the FeeCom.
Advertisements

Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of the FeeCom software Benjamin Schockert.
Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of theFedServer Benjamin Schockert Sebastian.
The Detector Control System – FERO related issues
TPC electronics meeting, /14 Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status.
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
1 Web Servers / Deployment Alastair Dawes Original by Bhupinder Reehal.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
HCAL RBX PRR 2 March H C A L RBX Monitoring RBX Production Readiness Review Monitoring, Fieldbus and DCS John E. Elias HCAL Electronics Coordinator.
Normal text - click to edit FeeServer: (version 0.9.2) ( ) S. Bablok (IFT, University of Bergen)
TRD dcs workshop, Heidelberg, Jan 22, TRD Feeserver/controlEngine Kai Schweda, University of Heidelberg R. Bramm, B. Doenigus, T. Dietel, D. Emschermann,
S.Sergeev, JINR, Dubna. This is just an example of what could be done Could be extended to needs of any NA62 sub- detector requiring a lot of analog measurements.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
CMS Michele Gulmini, Cern, DAQ Weekly 07/05/ RCMS – Plan of work Michele Gulmini DAQ Weekly 7th May 2002.
Simple Database.
European Organization for Nuclear Research Geneva - Switzerland Ing. Robert van der Vlugt CERN/PH Alice Detector Control System PVSS2 General Purpose Interface.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Automated Industrial Wind Tunnel Controller By Daniel Monahan and Nick DeTrempe Advised by Dr. Aleksander Malinowski.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
DCS – SDD Low Voltage Monitoring Jiří Král Czech Technical University in Prague, FNSPE Vojtěch Petráček Czech Technical University in Prague, FNSPE.
1 Responsibilities & Planning DCS WS L.Jirdén.
DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV.
ALICE, ATLAS, CMS & LHCb joint workshop on
P. Chochula ALICE Week Colmar, June 21, 2004 Status of FED developments.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
Registers are always 32 bit / 4 byte memory is accessed directly when memory cannot be accessed kind of flag is on.
ABone Architecture and Operation ABCd — ABone Control Daemon Server for remote EE management On-demand EE initiation and termination Automatic EE restart.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
Peter Chochula ALICE Offline Week, October 04,2005 External access to the ALICE DCS archives.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Communication Layers Protocol Commands Results Command Specs Command Framework Database Access PVSS Server TOC ,
FOPI – Slow Control Content 1.FOPI experiment - Overview 2.GUIs for FOPI 3.System Design.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Status of InterCommunication on FeeControl Meeting Report Communication between DCS-Layers State of Sebastian Bablok Christian Kofler Ralf Keidel.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
GLAST LAT ProjectI&T Face-to-Face Online Presentation – May 30, 2002 R. Claus1 I&T Online Status and Plans Ric Claus.
Source Controller software Ianos Schmidt The University of Iowa.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
Dcs meeting, CERN, Mar 13  14, HV Control box HV Box from Athens Kai Schweda, University of Heidelberg P. Mantzaridis, A. Markouizos, P. Mitseas,
Status & development of the software for CALICE-DAQ Tao Wu On behalf of UK Collaboration.
Configuration database status report Eric van Herwijnen September 29 th 2004 work done by: Lana Abadie Felix Schmidt-Eisenlohr.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
TM 8-1 Copyright © 1999 Addison Wesley Longman, Inc. Client/Server and Middleware.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
DCS for TRD Pre-trigger Ken Oyama Jan. 22, 2007 DCS Workshop in Heidelberg.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
FEE Control DIM (Distributed Information Management ) as communication layer between TPC/TRD and FEE control/monitoring application at ALICE.
CONFIGURATION OF FERO IN ALICE Peter Chochula 7 th DCS Workshop, June 16, 2003.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Summary of TPC/TRD/DCS/ECS/DAQ meeting on FERO configuration CERN,January 31 st 2006 Peter Chochula.
Maria del Carmen Barandela Pazos CERN CHEP 2-7 Sep 2007 Victoria LHCb Online Interface to the Conditions Database.
Clara Gaspar, February 2010 DIM A Portable, Light Weight Package for Information Publishing, Data Transfer and Inter-process Communication.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
Status of the Front-End Electronics and DCS for PHOS and TPC
Tiers vs. Layers.
Presentation transcript:

PHOS APD Bias Control Goal: To develop software for the PHOS APD bias control that uses the agreed ALICE standards for detctor control and coniguration.

Different ways for controlling the APD bias voltages Labview interface used in 2004, uses the RCU-sh interpreter via SSH. Minor modifications needed in order to to work with new firmware (2-3 days) –Does not comply with agreed standards. Micro code on the DCS command line via the the RCU-sh command interpreter. –Useful for debugging, but to tedious and difficult for upcoming beamtest –Does not comply with agreed standards. APD bias control based on ROOT, DIM and FEE server/client software developed in Bergen. Huge progress made Dec 2005 – March 2006 by Bergen/Oslo. Some more development needed (2-4 weeks). –Complies with ALICE standards. –API for APD bias contrloll can be integrated in the final DCS system. –Could also implement FEEC temperature monitoring and logging.

RCU PHOS FEEC DCS card Fee Server (DIM) PHOS CE Fee Client (DIM) APD GUI 1 DIM DNS Request service Register service Service info Service data Subscribe to service 1 ”Execute” ”Command + data” 1 Intercom Layer Fee Client (DIM) FED server (DIM) PVSS FED client (DIM) = Configuration files Configuration Data base BLOBs (SQL) Future systemCurrent System Ethernet DCS/RCU Mezzanine RCU backplane PC Detector Outside world

Test setup in Oslo/Bergen DID Information display APD GUI Firewall DCS one Front end Card DIM DNS University of Oslo Home University of Bergen Request service Service info Register service Subscribe to service & download APD values

Summary Communication chain DIM client/server and DIM DNS. –Status: Done Downloading and applying APD configuration via DIM client/server and Feeserver software developed in Bergen –Status: Done Temporary Solution for configuration database –Status: Done Integration into PVSS II. –Status: To Do Implementation of final configuration Database –Status: To Do Testing of system with lates version of boardcontroller and FEECs –Status: To Do