Tangible Property Regulations Presented by David W. Jennings, CPA.

Slides:



Advertisements
Similar presentations
Contents: Cover
Advertisements

BUILDING AIR CONDITIONING
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Facilities Management and Design Chapter 4 Safety and Security systems.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
A Duplex Conversion the First Time Sandra Shuffler Change Manager, Investor, Mom.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Heating, Ventilating, and Air-Conditioning
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Don’t Blame the Messenger Capitalization Regulations Affordable Care Act.
Foundations of Real Estate Management TM BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building.
Constellation Heating and Cooling Building Automation Systems.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
MEP design Mechanical, Electrical, Plumbing. Often separate consultants Can be separate even within a single firm Often performed on a design-build basis.
Chapter 7 Estimating Plumbing, HVAC, and Electrical Work.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
LOCAL ASSISTANCE 5 – YEAR PLAN Facilities Department Mark Thissell.
Management training Jumeirah beach residence sector 3 Presented by November 15 th 2006.
Building Description Wayne Foss, MBA, MAI Wayne Foss Appraisals, Inc.
Everything You Need to Know About Cost Segregation Studies
Electrical Power Systems
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
 On average, home heating uses more energy than any other system in a home  About 45% of total energy use  More than half of homes use natural gas.
Realty-Chek The Home Inspection Professionals Residential high end specialists Condo’s Certified Commercial Insured exceeds ASHI standards On-Line order.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
Computing Laboratory Building & Facilities Overview Role of Building & Facilities Manager Helping you Cleaning Reporting problems Interface with the Estates.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
Greening Affordable Housing on a Budget or Where There's a Will, There's a Way.
© 2012 McGladrey LLP. All Rights Reserved.© 2013 McGladrey LLP. All Rights Reserved. © 2012 McGladrey LLP. All Rights Reserved. © 2013 McGladrey LLP. All.
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
HVACR116 – Trade Skills Mechanical Drawings.
Facilities Maintenance Department LtCol Todd A. Kerzie Facilities Maintenance Officer (760) 725 – 3807 Mr. Jeff Hunt Maintenance Control Director Marine.
Final Tangible Property Dauby O’Connor & Zaleski LLC DOZ has been in business for 27 years, has 150 employees, and specializes in.
1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
Finishing the Building
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
Heating Systems.
Construction Drawing Occupational Safety and Fundamentals
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
 On average, home heating uses more energy than any other system in a home  About 45% of total energy use  More than half of homes use natural gas.
ROOFING MATERIALS, INSULATION, AND HOUSING SYSTEMS.
Sparring with the IRS: The New (Final?) Repair Regulation Rules Wichita State University Accounting & Auditing Conference May 19, 2014 Curtis Dean, CPA,
Final Tangible Property Regulations: Overview Main Line Association for Continuing Education Penn State Great Valley Conference Center October 22, 2015.
SOLUTIONS FOR TAX PROFESSIONALS AND BUSINESSES TAX CREDITS INCENTIVES COST RECOVERY Final Tangible Property Repair Regulations “Repair vs Capitalization.
Tangible Property Regulations- Landlord Tenant Issues. The new tangible property regulations present the opportunity to expense tenant improvements if.
New Repair Regulation Chapter 10 pp National Income TAX Workbook™
Betterment Adam Pugh 2015 FIMS & RE Annual Training May,
NEW REPAIR REGULATIONS – Tangible Property Regulations Final Regulations Governing Repairs and Capitalization Make Significant Changes; Effective January.
SCHEDULE E RENTALS 437 Laverne ● Clovis, CA Ofc: (559) ● Fax: (559)
COPYRIGHT© 2008 EQUIDEX Energy, LLC All Rights Reserved GOING GREEN (SIMPLE) The Holistic Approach to Energy Cost-Savings and Emissions Reduction.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
Introduction to Xylem Inc. Progressive Energy, Environment & Sustainability Summit 16 May 2013.
Preparing For A REAC Inspection Presented by: Patrick Ortiz Lead Housing Programs Analyst New Mexico Mortgage Finance Authority (505)
Session 1: Identifying Construction Drawings and Drawing Components.
Components of Construction part 2
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Temporary Regulation TD 9564
Objective 6.02 part 2: Recognize components of construction
Capital Projects Requests
Heating, Ventilating, and Air Conditioning
Electrical Gas Plumbing Heating & Cooling
Heating, Ventilating, and Air-Conditioning
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Interpretation and Practical Application
Recent Bond Accomplishments
Master Facilities Committee Evaluation and Identification
Presentation transcript:

Tangible Property Regulations Presented by David W. Jennings, CPA

Determining the unit of property Improvement Standards Tangible Property Regulations

Treas. Reg. § (a)-3 Determine the unit of property Apply the improvement standards Consider the routine maintenance safe harbor Amounts Paid To Improve Tangible Property

General rule is that all components that are functionally interdependent are a single UoP o If taxpayer depreciates a component of a UoP under a different asset class from UoP, then component is the UoP Special rules o Buildings o Leased property o Plant property o Network assets Determine The Unit of Property (“UoP”)

UoP is the building and structural components To determine if UoP is improved, look at each of the following: o Building systems:  Heating, ventilation, and air conditioning systems (HVAC)  Plumbing systems  Electrical systems  All escalators  All elevators  Fire protection and alarm systems  Security systems  Gas distribution systems  Other structural components identified in published guidance o Building structure, which is defined as the building and its structural components (other than the sub-systems above) UoP – Buildings

An “improvement” is defined under §1.263(a)‐3(d) as an amount paid after the property is placed in service which: o Betterment – Results in a betterment to the UoP o Adapts the UoP to a new or different use o Restores the UoP B-A-R = Improvement (Capitalize) What Is An “Improvement?”

Corrects a material condition or defect existing prior to the taxpayer’s acquisition Is a material addition (enlargement, expansion, extension) Is a material increase in capacity, productivity, efficiency, strength, quality, or output (Ex. Replace asphalt shingles with new solar shingles) o Enhancement due to technological advancements not necessarily betterment. (ex. HVAC equipment is always going to be more efficient. Is it comparable?) “Material” ‐ IRS has not defined this! What Is A “Betterment?”

If cost is incurred to adapt UOP to a use different than when originally placed in service Example – A converts its manufacturing building into a showroom for its business Removes and replaces various structural components to provide a better layout for the showroom and its offices Must capitalize the amount paid to convert the building into a showroom because the conversion to a showroom is not consistent with A's ordinary use of the building structure at the time it was placed in service “Adaption”

Restoration only if: Returns UOP to ordinary operating condition – if in state of disrepair & no longer functional Replacement of major component or substantial structural part Rebuilds UOP to like‐new condition after end of class life o Class life – 168(g)(2) and (3) for purposes of the alternative depreciation system Replaces component deducted as loss; or adjusted basis taken into account for loss/gain Repair component after casualty loss/event if basis adjusted What Is A “Restoration?” 1.263(a)-3(k)

For Buildings – It is a replacement of a Major Component or Substantial Structural Part if: Replacement includes parts that comprise a major component or a significant portion of a major component of a building or building system Must first identify the major component of a building system. Then see if a significant portion was replaced Restoration

Structural Components – lots of things. Walls, windows, doors, roof etc. See reg (e)(2) Building System – Nine items listed (HVAC, Plumbing, etc.) Major Component – Performs a discrete and critical function Substantial Structural Part – Large portion of the physical structure Definitions

Common Examples of Building System Components Unit of Property Building Unit(s) of Property and Common Components Building Structure Heating Ventilation and Air “HVAC” Plumbing SystemsElectrical SystemsAll Elevators Roof Walls Floors Ceilings Foundation Motors Compress Boilers Furnace Chillers Pipes Ducts Radiators Pipes Drains Valves Sinks Bathtubs Toilets Water and Sanitary Sewer Collection Equip. Water Utility Equip. Wiring Outlets Junctions Lighting Fixtures & Connectors Elec. Utility Equip. Elevator boxes Control Equip. Cables and Movement Equip. All Escalators Fire Protection and Alarm Systems Security Systems to Protect Building and Occupants Gas Distribution System Rails Steps Supporting Equip. Controls Sensing & Detection Devices Computer Controls Sprinkler Heads & Mains Piping & Plumbing Alarms Control Panels Signage Window & Door Locks Security Cameras Recorders Monitors Motion Detectors Security Lighting Alarms Entry Access Pipes Gas Equip.

Example # 16 – Office building with one HVAC System Comprised of 3 furnaces, 3 AC units, and duct work throughout the building 1 Furnace breaks down, replaced with a new furnace The three furnaces together perform a critical function in operation of HVAC system 3 Furnaces = Major Component However replacing a single furnace is not a significant portion of this major component of the HVAC System Not a restoration of the UOP (HVAC system) Restoration Examples HVAC Systems

Example # 17 – Office building with one HVAC System Comprised of 1 chiller, 1 boiler, cooling tower, etc. Chiller is replaced with comparable unit Chiller functions to cool water to generate AC Chiller performs a discrete and critical function of HVAC system Must Capitalize Restoration Examples HVAC Systems – Cont.

Major Component/Substantial Structural Part Engine and cab of truck tractor Entire roof of manufacturing building (including decking, insulation, asphalt, and various coatings) Chiller unit in office building HVAC system (e.g., chiller, boiler, pumps, duct work, diffusers, air handlers, outside air intake, cooling tower) All wiring within a building's electrical system Major Component/Substantial Structural Part Examples Not a Major Component/Substantial Structural Part Power switch assembly of drill press Waterproof membrane of retail store roof (comparable to original membrane) 3 of 10 rooftop units in an office building HVAC system (e.g., 10 RTUs, system controls, duct work) 30% of the wiring within a building's electrical system

Major Component/Substantial Structural Part All toilets and all bathroom sinks (not including associated piping) in all restrooms in 3-floor retail building 200 of 300 exterior windows o 300 windows represent 25% of building surface area Wood floors in all public areas (e.g., lobby, hallways, meeting rooms, ballroom, etc.) of hotel Major Component/Substantial Structural Part Examples – Cont. Not a Major Component/Substantial Structural Part 8 of 20 restroom sinks (not including associated piping) in 3-floor retail building 100 of 300 exterior windows o 300 windows represent 25% of building surface area 1 of 4 elevators in office building (single elevator is not gain-or-loss property)

Deductible – must reasonably expect (at time UOP is placed in service) to perform more than once during class life (alternative depreciation system (ADS)) o Safe harbor does not apply to Betterments, Adaptations, or some Restorations (see Reg. § 1.263(a)‐3(i)(3)) Consider – recurring nature of activity, industry practice, manufacturers‘ recommendations, and taxpayer's experience with similar property FOR BUILDINGS: Deductible – must reasonably expect to perform more than once during the ten year period from when the building system was placed in service Routine Maintenance Safe Harbor