Jeff Florin Deputy Executive Director, Operations Virginia Port Authority Capital Outlay Program & Facilities Maintenance Overview Board of Commissioners.

Slides:



Advertisements
Similar presentations
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Advertisements

Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Alabama State Port Authority Infrastructure for Tomorrows Market October 2005.
Richmond’s Future Mr. Jeff Keever Senior Deputy Executive Director Virginia Port Authority.
Idaho/Canada Border Issues Transportation Border Working Group Meeting Coeur d’Alene, ID April 22-23, 2008.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
John Malbon, CEO, PAPCO & Hampton Roads Member, Virginia Commonwealth Transportation Board May 28, 2014.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
April 16, 2014 Carmeuse Lime & Stone, Inc. – Rail Industrial Access Project 1 Rail Industrial Access Program Application Briefing.
Returning to Our National Waterways Dabney Hegg U.S. Senate Committee on Commerce, Science and Transportation.
A Report to Congress Addressing “the Critical Need for Additional Port and Inland Waterway Modernization to Accommodate Post- Panamax Vessels”
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
THE OHIO RAIL DEVELOPMENT COMMISSION + THE CSX NATIONAL GATEWAY FHWA Talking Freight Webinar April 17, 2013.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
V IRGINIA I NTERNATIONAL T ERMINALS Joseph A. Dorto November 27, 2012.
The 2011 Rail Conference: Moving Freight and Passengers in the 21 st Century Seaports and Freight Rail Eric D. Johnson Executive Director Washington Public.
PORT EVERGLADES. 3.7 MILLION CRUISE GUESTS 6 MILLION TONS OF CARGO AND 924,000 CONTAINERS The total value of economic activity at Port Everglades in FY.
“Rail – The Intermodal Connection” AASHTO SCORT – Portland, ME
Detroit Intermodal Freight Terminal (DIFT) Project AASHTO SCOWT October 13, 2011.
1 1 CRTPA Board Meeting 09/20/2010. CSX Corporation (NYSE: CSX) CSX Transportation – serves every major population and industrial center east of the Mississippi;
U.S Conference of Mayors August 2004 Mayor’s ’04 Metro Agenda Bipartisan Priorities Statement Directed for candidates in Presidential and Congressional.
Port Financial Management Challenges Financing Freight Transportation Improvements St. Louis, Missouri April 29 to May 2, 2001 Financing Freight Transportation.
Jeff Florin Deputy Executive Director, Operations Virginia Port Authority Capital Outlay Program & Facilities Maintenance Overview Board of Commissioners.
Savannah Harbor Expansion Project
Marketing/ Business Development Committee Presentation Board of Commissioners Session 351 May 28, 2013.
America’s Port Future Ports – Annual Conference San Pedro, California June 23, 2014 Port of Los Angeles.
Overview Comments Port of Virginia July 22, 2013.
Preparing for Post-Panamax Commodity Flows: Restructuring on Kentucky Waterways Tim Brock Research Associate Kentucky Transportation Center Smart Rivers.
Virginia Port Authority (VPA) Operations Visualization.
Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.
Disclaimer – Any and all information contained herein is subject to change without notice 1 O’Hare Airfield Configuration EXISTING Airfield Configuration.
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
Cargo Dock 16: Pre-Bid Meeting Presentation June 13, 2013.
Challenges Facing Ports Today Containership capacities and containership fleet continues to expand Global economic development leading to growing world.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Prince Rupert Seattle LA/LB Oakland Lazaro Cardenas Nova Scotia New York Norfolk Savannah Jacksonville Mobile Port Competition is Intensifying.
JOHNSON STREET BRIDGE PROJECT COUNCIL WORKSHOP MAY 21, 2009.
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
City Council Presentation Progress Report No. 12 For September 2006 November 6, 2006.
The Transportation Logistics Company Indiana Logistics Summit Infrastructure Needs and Opportunities September 26, 2007.
Stewards of Tomorrow 1 THE PORT OF VIRGINIA: KEEPING VIRGINIA’S ECONOMY MOVING JOSEPH P. RUDDY CHIEF INNOVATION OFFICER MAY 19, 2016 JOSEPH P. RUDDY CHIEF.
Columbus Airport Authority We’re Really Taking Off! November 6, 2002.
Port of Everett MASTER PLAN UPDATE April 8, 2008.
2014 Annual Program Evaluation (APE) Status Update April 1, 2014.
Presentation to VPA Board of Commissioners
Multi Agency Exchange May 16, 2017.
North Georgia Water Resources Partnership
Transportation Engineering Business Development Workshop Department M
Project Overview Woodstock Industrial Site is a premier industrial mega site. The site features up to 1,500± contiguous acres located on easily accessible.
Public Private Partnerships
Deputy Executive Director, Operations Virginia Port Authority
Deputy Executive Director, Operations Virginia Port Authority
Kerr Tar Project Update – June 2016
Condominiums Association
Construction Management & Inspection
Highway 169 Bridge Replacement & Pavement Resurfacing
PORT OF EVERETT MARINE TERMINALS MASTER PLAN UPDATE
Responsibilities and FUNDING
1200 West Widening and Reconstruction Project
2014 Annual Program Evaluation (APE) Status Update
City of Spruce Grove Capital Region Partners Presentation 2019
About Rio Grande Pacific Corporation
Presentation transcript:

Jeff Florin Deputy Executive Director, Operations Virginia Port Authority Capital Outlay Program & Facilities Maintenance Overview Board of Commissioners Session 350 March 26, 2013

2 Agenda  NIT Gate Improvements  NIT CBP Interchange  NIT Customer Service Area Improvements  NIT OCR Portals  Median Rail Crossing Removals  PMT Rail Upgrades  APMT Trench Drain Repairs  APMT Reefer Plugs  NIT Marshaling Yard  Craney Island Eastward Expansion

3 NIT Gate Improvements  Security, interchange, and transfer zone automation, personnel shifted to remote facility  Automation, appointment system and remote processing  Improves cargo velocity, safety & efficiency  Estimated combined project cost: $10 M  Includes $4.1 M software

4 NIT Gate Improvements Project 1 Interchange & CBP Improvements Project 2 Chassis Service/Customer Service Areas Project 3 OCR Portals Project 3 OCR Portals Completed Transfer Zone

5 NIT CBP Interchange Improvements  Underground duct bank, curb installation, and underdrain construction underway  Estimated project cost : $2.2 M  Contractor: EV Williams  Project is currently 75% complete  Project completion by September 2013

6 NIT CBP Interchange Improvements

7 NIT Customer Service

8 OCR Portals

9 Median Rail Crossing Removals  Removing signals and signs from 14 former rail crossings  Pavement patch and rail removal complete at all crossings  Milling and paving tie-in strips at major intersections will occur weather-permitting  Cedar Lane sidewalk replacement on hold pending completion City of Norfolk water main replacement project

10 Median Rail Crossing Removals Tyre Neck Rd. road crossing

11 PMT Rail Upgrades  Replacement and upgrade to Class I railroad standards of the East and West rail leads into PMT  Estimated project cost : $755,000  Contractor: H&B Railroad  Notice to Proceed in April

12 PMT Rail Upgrades East rail lead West rail lead

13 APMT Trench Drain Repairs  Localized repairs of APMT storm drains  Estimated project cost : $150,000  Contractor: Eastern Waterproofing & Restoration of VA Co, LLC  Notice to Proceed this week  Project completion by September 2013

14 APMT Reefer Plugs  Installation of 60 reefer plugs  Estimated project cost : $1.3 million  Contractor: William R. Jennings  Bids open May 2013

15 APMT Reefer Plugs Reefer plug installation Trench drain repairs

16 NIT Marshaling Yard  Constructing approx. 6,000 lf of track on former Norfolk-Portsmouth Beltline rail yard site  Will improve overall rail operations at NIT  Estimated project cost: $3.2 M  Funded by $3.5 M Rail Enhancement Fund  Yard track is complete, remaining work pending connection to adjacent VDOT Greenbrier Grade Separation

17 NIT Marshaling Yard Related Projects

18 NIT Marshaling Yard

19 VDOT Greenbrier Grade Separation

20 Craney Island Cross Dikes Stage 2A  USACE began Stage 2A December 17 th  Placing ≈ 1.6 MCY of sand on South and Division Cross Dikes to 10 feet above water  Land is visible!  Contractor: Manson Construction Co.  Project cost: $26.8 M in federal appropriations  Stage 2A completion by May 2013

21 Craney Island Cross Dikes Stage 2A

22 East Coast Port Preparedness Virginia is only one prepared for 12,000 TEU Post-Panamax ships Virginia 50 ft Virginia 50 ft Baltimore 50 ft Baltimore 50 ft NY/NJ 45 ft NY/NJ 45 ft Charleston 45 ft Charleston 45 ft Savannah 42 ft Savannah 42 ft Miami 42 ft Miami 42 ft  Deep channels  Intermodal connections to population centers  Unobstructed water access  Expansion capability  CIEE permits 1 to 3 million Metro Area Populations Emerging Mega Regions © 2008 by Regional Plan Association 3 to 6 million 150,000 to 1 million 6 million+

23 Best Value East Coast Navigation Project Investments in Port Capacity Expansion Projects $2,500 M $155 M $3,035 M $1,300 M $551 M

24 Federal Appropriations  Remaining $400 million federal investment Approved by Congress in WRDA % of the total project cost  Will spur economic development  $16 billion in National Benefits  50,000 American jobs VPA USACE CIEE Federal/State Cost-Share

Thank You