California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources.

Slides:



Advertisements
Similar presentations
Governments role in the regulation of offshore exploration activities Commonwealth waters Environmental Sustainability Unit – August 2010.
Advertisements

Ways to Improve the Hazard Management Process
Museum Presentation Intermuseum Conservation Association.
Checking & Corrective Action
2013 Safety Driven Performance Conference 9-10 October 2013
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Contractor Safety Management
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
Ohio’s One-Stop Utility Resource Gas Pipeline Safety Pipelines - State and Local Issues Pete Chace GPS Program Manager (614)
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Wetland Planning Requirements, Tools & Processes.
Division of Local Assistance Office of Special & Discretionary Programs December 2, 2010.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
ENVIRONMENTAL MANAGEMENT PLAN
Cal/OSHA PSM Unit Activities in 2014 and a look at 2015
Effective Workplace Safety Inspections OFFICE OF RISK MANAGEMENT LOSS PREVENTION UNIT.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Applying a Systems Approach EPA Regions 9 & 10 and The Federal Network for Sustainability.
DIVISION OF YOUTH CORRECTIONS ESTABLISHING A SAFETY CULTURE.
TIA Solid Waste Consultants, Inc.1 Presented by Miriam Zimms, Senior Consultant TIA Solid Waste Consultants, Inc. Tampa, Florida Pollution Prevention Conference.
ADEQ Uses of ICF Modeling Analysis Tony Davis, Branch Manager – Air Planning Arkansas Department of Environmental Quality Criteria Pollutant Modeling Analysis.
Rail Safety Committee Mid Year Meeting December 2011
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
Regulation of Pipelines
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Fire Department Accreditation and Self Assessment Overview
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Regulatory Aspects of the Underground Hydrocarbon Storage (UHS) Program and the Role Contractors Have in This Lyons Celebration Center, Lyons, Kansas February.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
The STRONGER State Review Process -Draft Air Quality Guideline ● Martz Summer Conference June 6, 2014 Bruce Baizel Chair, STRONGER Board
Monterey Peninsula Water Management District 1 Confirm Scope of Work and Description for MPWMD ASR Project Item 13 April 18, 2005 Regular Meeting Staff.
Presented by Sally Bardossy ENVIRONMENTAL MANAGEMENT SYSTEM presented by Sally Bardossy.
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Industrial Risk Control
VI. Developing a VSMP Program General Stormwater Training Workshop.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines June 17, 2009 Mark Dakers, Environmental Analyst Massachusetts.
Nwtboardforum.com For reference only. Not a legal document Inuvialuit Settlement Region.
Marine Pollution Form unified command with Coast Guard and responsible party (spiller) Form unified command with Coast Guard and responsible party.
Trindel Insurance Fund Trindel Insurance Fund Cal OSHA Heat Illness Prevention Regulation Presented by: Gene Herndon Trindel Insurance Fund Safety Officer.
Organizational Study of Inspectional Services City of Springfield, Massachusetts February 21, 2008.
Annual and program plans Briefing
Safeguarding California: Implementation Action Plans Listening Tour October 2015.
Public Awareness Programs for Pipeline Operators WESTERN REGIONAL GAS CONFERENCE August 21, 2007 Presented by: Ross Reineke.
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
Chapter 8 Risk Management Plans 8 Risk Management Plans C H A P T E R.
OHSAS Occupational health and safety management system.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
Southeast strategic regional coastal monitoring programme Strategic Regional Coastal Monitoring Programme Procurement & Contract Management.
1 Proposed Amendments to the Verification Procedure for In-Use Diesel Emission Control Strategies August 23, 2012 California Environmental Protection Agency.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Office of the State Fire Marshal Pipeline Safety Division

School Safety Inspections
Enterprise Content Management Owners Representative Contract Approval
Air Carrier Continuing Analysis and Surveillance System (CASS)
Arsenic Acceptable Ambient Level Revision
Environmental Management Systems The ISO Approach Initial Environmental Review & Gap Analysis Presented by: NC Division of Pollution Prevention.
CIS12-3 IT Project Management
Chemical Safety and Security Plan
Emergency Action Planning & Emergency Preparedness
Relationship between World Bank and Romanian EA requirements
Pre-Submittal Meeting As Needed Environmental Services RFQ
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Presentation transcript:

California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Regular Item 136

California State Lands Commission—Mineral Resources Management Background  April 28 Commission Meeting  LBU Program Plan – insufficient details on:  Safety Programs  Environmental Protection Programs  Commission ordered City to revise Program Plan:  Include an Environmental and Safety Audit  Complete within 15 months  Directed staff to:  Return within 60 days, a detailed scope of the Audit  Scope to include identification and analysis of the Environmental and Safety Risks  Human Injury  Adverse Environmental Impact  Significant Property Damage  From Audit findings, provide recommendations to Program Plan  Identify funding w/ no impact on net revenue to General Fund

California State Lands Commission—Mineral Resources Management LBU Environmental & Safety Audit Overview  Environmental and Safety Audit Scope (Exhibit B)  Purpose of Audit  Description of Facilities to be Audited  Audit Activities – Description of Audit Categories  Audit Standards & Criteria to be Verified (Exhibit C)  Audit Duration  SLC Staff Resources  Estimated Cost of Audit  Funding Source  Impact / Recommendation

California State Lands Commission—Mineral Resources Management Island Grissom

California State Lands Commission—Mineral Resources Management Safety Audit Scope  Scope:  Equipment Function & Integrity  Field Inspection of all 4 Islands, and onshore facilities  Review Maintenance  Safety Systems testing  Environmental and Emergency Response elements  Electrical Audit by Contract Electrical Engineers  Technical Design Evaluation  Hazards Analysis reviewed  Administrative Review  Operations Manual & Operating Procedures  Oil Spill Contingency Plan  Other Emergency Response Plans  Conduct Human and Organizational Factors Assessment  Use SAMS tool - same 6 engineers  6 MRMD engineers for 15 months  City LB and OLBI to provide documentation and support, but don’t audit.

California State Lands Commission—Mineral Resources Management Safety Audit Cost / Funding  $1.25 mil. For MRMD staff & electrical contractor  The Oil Spill Prevention Administration Fund (OSPAF) funds the Safety Audit Program.  No impact to state general fund.  Costs do not include expenditures to correct audit findings.  Expenditures that may occur to correct audit findings may be Unit costs.

California State Lands Commission—Mineral Resources Management Current Agency and Jurisdictional Oversight  City of Long Beach Department of Oil Properties - Inspection and Monitoring Fire Dept. - Inspection of Fire Protection Systems & Equipment  Division of Oil, Gas, and Geothermal Resources (DOGGR)  Air Quality Management (AQMD) Permits Monitoring of Fugitive Emissions / Natural Gas  Regional Water Quality Control Board (RWQB) Permits  Fish & Game, Office of Spill Prevention & Response (OSPR)  State Lands On-site Surveillance and monitoring of operations

California State Lands Commission—Mineral Resources Management Delay caused by LBU Audit  Interrupted audit schedule for offshore platforms  Platform Holly in the Santa Barbara Channel currently scheduled this summer  All Platforms and facilities will be delayed by 15 months Effect of Long Beach Unit Audit on Current Schedule FacilityCompany Scheduled Start Delayed State Due to LBU Audit Platform HollyVenoco08/01/201111/01/2012 Rincon IslandGreka04/01/201207/01/2013 Rincon Onshore FacilityGreka04/01/201207/01/2013 Platform EmmyAera04/01/201309/01/2014 Huntington Beach StripAera04/01/201309/01/2014 Huntington Beach Onshore Facility Aera04/01/201309/01/2014 Platform EvaDCOR02/01/201405/01/2015 Platform EstherDCOR02/01/201405/01/2015 Fort Apache Onshore Facility DCOR02/01/201405/01/2015 McGrath/MontalvoVenoco02/01/201605/01/2017 Ellwood Onshore FacilityVenoco02/01/201605/01/2017

California State Lands Commission—Mineral Resources Management Recommendation  Platform Holly Audit to start August 2011  LBU Audit to start January 2012