DAQ Hardware status - overview R. Stokstad DOM Main Board –Schedule (Minor) –Design (Przybylski) –Firmware (Stezelberger) –Testing (Goldschmidt) DOR Board.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Time Calibration Tests Results using a waveform template Cross-talk measurements Stub asymmetry results Kalle Sulanke David Hardtke Bob Stokstad.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 26/4/2004 Multi-channel Data Acquisition System Final_A Presentation.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Kabuki 2800 “a real-time digital audio effects system for performance” team “Big Country” presents ECEN4610 Preliminary Design Review 14 September 2006.
High Speed, high common mode immunity communication interface Team May12-05 Chendong Yang Mengfei Xu Advisor: Nathan Neihart Client: RBC Medical Development.
Link A/D converters and Microcontrollers using Long Transmission Lines John WU Precision Analog - Data Converter Applications Engineer
Master Clock for IceCube October 21, 2003 Contributors: Jerry Przybylski, Kalle Sulanke, Dave Nygren, Chuck McParland, Bob Stokstad Lawrence Berkeley National.
Bill W. Haynes Slide 1 February 26, 2002 CKM Precision Timing CKM Workshop In San Luis Potosi, Mexico u Common Design for Multiple Timing Applications.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
Clock Distribution for IceCube June 8, 2004 Lawerence Berkeley National Laboratory Gerald Przybylski GTPrzybylski LBNL 10/13/2003.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
Review, May 5, 2004Lawrence Berkeley National Laboratory DOM MB Hardware CDR and PRR, May 5, 2004 Gerald Przybylski Lawrence Berkeley National Laboratory.
IceCube System Testing
Plan- x1 meeting no. 4 – 27/04/10 at NCRA Auditorium, Pune GMRT SERVO SYSTEM PLAN X1 TARGET implements : 1a) Brushless drives 1b) PC-104 Servo computer.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
DAQ Hardware status - overview R. Stokstad DOM Main Board –Schedule (Minor) –Design (Przybylski) –Firmware (Stezelberger) –Testing (Goldschmidt) DOR Board.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
GPS based time synchronization of PC hardware Antti Gröhn
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: “DOM MB to Event Builder”
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
String-18 New-DAQ Commissioning Azriel Goldschmidt AMANDA Collaboration Meeting Berkeley, March 2002.
Yuri Velikzhanin NuTel TV meeting, June 13 (Friday), 2003 Status of electronics for NuTel prototype.
DOM MB Status October 14, 2003 Gerald Przybylski Lawerence Berkeley National Laboratory GTPrzybylski 20/14/03 LBNL.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Parallel Data Acquisition Systems for a Compton Camera
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Icecube DOM Main Board Status and Development Plans R. Minor October 2003.
DAQ: Status and Plans David Nygren Berkeley Collaboration Meeting March 21, 2005.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
Stan Durkin EMU Meeting, Purdue Univ. Oct. 6, VCC Hardware Production Status Firmware compile issues delayed testing and burn-in. Last 15 boards.
SVTRAD Upgrades M. Bruinsma1Sept. 22nd 2003 SVTRAD Upgrades M. Bruinsma September 22, 2003 Background Workshop, SLAC Motivation.
Agata Week – LNL 14 November 2007 LLP ATCA Carrier Status M. Bellato on behalf of the LLP Carrier Working Group.
DOM Main PCB Testing Gerald Przybylski October 23, 2002 Lawrence Berkeley National Laboratory.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Software Engineering Requirements Review June 5, 2002 LBNL Chuck McParland.
DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.
PSI - 11 Feb Status of the electronic systems of the MEG Experiment.
DOM MB Test Results at LBNL Main Board Readiness Status Review LBNL, July 2003 Azriel Goldschmidt.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Hardware Engineering Requirements Review June 5, 2002 LBNL David Nygren.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
DAQ ELECTRONICS 18 March 2015MEG Collaboration Meeting, Tokyo Stefan Ritt.
Readout controller Block Diagram S. Hansen - CD-1 Lehman Review1 VXO Ø Det Links to 24 SiPM Front End Boards Clock Event Data USB ARM uC A D Rd Wrt 100Mbit.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
Status of Detector Characterization a.k.a. Calibration & Monitoring Project Year 2 objectives ( → Mar ‘04) 1. Calibration plan (first draft in March.
Digitization at Feed Through Wu, Jinyuan Fermilab Feb
DHH at DESY Test Beam 2016 Igor Konorov TUM Physics Department E18 19-th DEPFET workshop May Kloster Seeon Overview: DHH system overview DHE/DHC.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
A 12-bit low-power ADC for SKIROC
IceCube System Testing
Low Level RF Status Outline LLRF controls system overview
DOR <-> DOM Communication
Low Level RF Status Outline LLRF controls system overview
Command and Data Handling
Presentation transcript:

DAQ Hardware status - overview R. Stokstad DOM Main Board –Schedule (Minor) –Design (Przybylski) –Firmware (Stezelberger) –Testing (Goldschmidt) DOR Board (Sulanke) Master Clock Unit (Nygren, Sulanke) Time Calibration, Cable measurements (Stokstad, Sulanke, Hardtke) Individual presentations for the above to be in Mons proceedings

Rev 2 board

Icecube DOM MB Status and Development April – Oct '03 –Rev 2 test and development (22 boards) Oct – Nov ’03 –Rev 3 fabrication and test (16 boards) Nov ’03 – Mar ’04 – Rev 4 fabrication and test (60 boards) March – June ’04 –Rev 5 for deployment (420 boards) Schedule

October – November ‘03 First 4 cards due Oct 22, 12 more to follow 5 days after approval –Changes from Rev 2 address memory performance at temperature and signal quality issues –Testing at LBNL will include manual tests and STF testing –Temp cycling of bare and loaded boards +65, -40degC 10 cycles First 4 cards to UW 8 cards to UW, 8 cards to LBNL Rev 3 status

November – March ‘04 –Design modifications as indicated by Rev 3 tests and internal review –Final parts selection for reliability –60 cards to be fabricated –“Qualification test” at UW Longer term temperature tests String operation tests Some boards used for development at LBNL Rev 4 plans

Rev 5 plans Initial production review November ‘03 –Based on Rev 3 and Rev 4 tests –Earlier than usual to enable long-lead parts purchasing Production readiness review - January ‘04 –Based on initial Rev 4 tests –Qualification testing –Vendor qualifications –Fabrication process approval

Rev 5 Production (March – June ’04) Full production and Q/A procedures in place All parts as selected for reliability ATWD production run including qualification tests Any differences between Rev 4 and Rev 5 require formal Engineering Change Procedure and re-qualification testing Fabrication begins March ‘04 Testing begins April ’04 Delivery April - June ‘04

EPXA4 Baseline (The larger FPGA) Hi-Reliability Part Substitutions –Primary Oscillator; Corning (Hi-Rel 2560A-0009) –High-Rel DC-DC Converter; Power-One brand Low impedance Power Distrib.to SDRAM 2 x 12 Channel ADCs vs. 1 x 8 Channel for monitoring Q/A Tests Added to Plan; Coupons on PCB Noise Related Layout Changes Fabrication procedure changes Some Changes made in Rev 3

DOMMB Block Diagram

Firmware CPLD (lowest level programmable logic device) Almost finished. Smallr changes needed for Rev 3 and to make the design more robust. FPGA –STF99% Done for testing –ConfigBoot Preliminary Versionminimal boot –IceBoot Preliminary Versionnormal boot –DOMAPP~50% Done for data taking For software development purposes the SFT FPGA can be used for the ConfigBoot and the IceBoot FPGAs

DOR card Firmware Status Production Status, Rev. 0 Planned Production, Rev. 1 Data Buffer SRAM 2 x 256Kx16 Cable Interface #1 Cable Interface #2 Cable Interface #3 Cable Interface #4 PCI-CorePCI-Core FLASH 1M x 8 Altera PLD EPM7064 ConfigJTAG Altera FPGA EP20K200E JTAG PCI Bus DOM 1..4 JTAG Clock 96 V DOM 5..8 Reload

DOR, DO M Readout card 12 ICECUBE Meeting, Mons October 2003 FPGA FLASHSRAM 96V DOM Power Clock & Time String port JTAG PLD Comm. ADC Comm. DAC Quad Cable Con. Comm. Rec. Power Switch

Production Status Rev. 0, 10 DORs running at : UW 2x, Bartol 1x, LBNL 7x 20 more in production now, ready in Dec stay at DESY, 16 go to ? Planned Production, Rev. 1 Redesign ready in January first test in Feb., production of 60 if o.k. 60 ready in April DORs -> sufficient to control 480 DOMs

DOMMB Test Plan Select well functioning DOM MBs (including delay board) suitable for integration into DOMs to be deployed in IceCube/IceTop. For boards which are not well functioning, provide information to aid understanding, debugging and fixing. Provide some DOMMB characterization: optimum running parameters, etc. Be able to handle an expected “steady state” flow of 55 boards/week.

Initial Tests Visual inspection, Power to board Load “released” firmware and software in dedicated setup (1 board at a time) Get “boot prompt” and tests that cannot be done in DOR-based setup (if any) Multiple heating and cooling cycles (+65C to -40 C) to catch infant mortality cases. Boards powered and some testing during burn-in Power cycles during burn-in Full operational test at the end to identify bad boards. Burn-in

Master Clock Unit: Function Create and distribute stable 20 MHz source to all DOM Hubs in IceCube DAQ. –DOR cards mirror MCU time, calibrate DOMs Link “IceCube Time” to GPS time. Provide robust real-time time verification. –Motivation: detect any error condition in less than 1 sec

Master Clock Unit (MCU) Status Draft Requirements Document exists Specific Implementation proposals have been made by Sulanke and Przybylski. Plan is that Sulanke will design and fabricate this subsystem at DESY.

Time Calibration Tests Results using a waveform template Cross-talk measurements Cable stub asymmetry results

DOR DOM

Scope at DOR Scope at DOM

One-way time = 1/2 round trip time ONLY IF Symmetry in pulse generation and transmission Signal processing same at both ends Golden Rule of Time Calibration

DOR DOM DOR - DOM testDOR - DOR test DOR-DOR has same clock for transmitting and receiving DOR-DOM Asymmetry Test

V t  t=  V/(  V/  t) Clock period 50 ns Time resolution < 5 ns Rise time ~400 ns -> linear algorithm should be OK

DOR-DOR shifted by one clock tick = 50 ns

VV  t (ns)  t av

Average asymmetry = -1.3 ns RMS asymmetry = 1.1 ns DOR - DOR test DOR

DOR Card Av. Asymm RMS asymm DOM A -1.3 ns 1.1 ns DOM B -1.2 ns 1.1 ns DOR Card Test of Two DOM Configuration DOM A = 20 cm stub DOM B = 40 cm cable DOR DOM A DOM B Runs A_02_04N B_02_04N

Waveform Analysis Linear fit over limited range, calculate crossing point with pedestal Fit range

Round-Trip times using three methods Waveform template rms = 0.9 ns Linear fit rms = 3.9 ns Complicated fit rms = 7.2 ns Note: absolute scale on x-axis not adjusted properly. OK for residuals, however.

Using measured waveform as template and centroid of pulse appears promising. Simple, fast, accurate. Robust? (likely) Candidate for use in ice. Waveform Analysis Summary

DOR - DOM typical results: Round trip time rms ~ 1 ns for 3.4 km cable in lab using template. (1ns in 37  s) Boards otherwise "quiet" No transmission of data in other twisted pair.

Cross-talk studies DOR - DOM 3.4 km Ericsson quad on spool Measure round trip rms deviation with and without data xmission at (1 Mbit/s) in other twisted pair

Cross-talk measurement results round trip residual (rms ns) DOM A DOM B Data transmission on to another quad Data transmission on in Ericsson quad Runs X01_A,B X03_A,B => Most Cross-talk occurs in quad

Timing error budget for clock calibration is 5 ns total - including frequency, offset, asymmetry. Conclude it is prudent to shut down data transmission during RAPCAL in order to meet timing requirement. Synchronized shutdown of communications for calibration is now the planned operating mode. Uses 0.5% bandwidth at 10 sec interval Uses 5% bandwidth at 1 sec interval (This option already envisioned in RapCal for IceCube.)

Cable Stub Tests No Stub Configurations DOR DOMaDOMb 15 cm terminated unterminated 3.4 km cable end DOR DOMbDOMa 15 cm1750 cm3.4 km 12 DOR, DOMa, and DOMb are actually one DOR card

Cable Stub Tests Stub Configuration DOR DOMb DOMa 130 cm 1750 cm3.4 km 3

Stub test results (preliminary) DOMaDOMb asym rms (NB 1 clock tick = 50 ns. Above absolute asymmetry is due to systematic logic error and is < 1ns.) DOR card has single clock for all 3 channels => Can measure up - down asymmetry Use centroid of positive portion of pulse These results suggest that 1.3 m cable stub does not introduce an asymmetry with measurable effect on time calibration