Panel production status Panels needed according to official plan 5385 14-Oct-05 A rate of 250/month is mandatory to match the chamber production schedule.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Status Update on Mechanical Prototype in Rome November 6,
Construction material – All the material has been ordered with some spare (10%) Material Procurement Faraday cage – Final FEE board dimensions available.
Walls crates cables gas chambers electronics CERN adb.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
E- MAIL APPLICATION CALENDAR MODUL. B ENEFITS OF CALENDAR Calendar sharing. Outlook Web App now enables your users to share their calendars with people.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Production Readiness Review Production steps and quality control 1.Panel production 2.HV bar gluing 3.Preparation of side material 4.Wiring and gluing.
HV connection for a Common GEM foil design Aiwu Zhang
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Shandong University TGC Site Review Review team General impression Material presented Possible improvements Action items Conclusions.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
The RPC Closed loop Gas System Slides from Bianco and Guida.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Clara Gaspar, July 2005 RTTC Control System Status and Plans.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
CLAS12 Drift Chamber Prototyping
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
15/6/2006Gaia Lanfranchi - LNF-INFN1 Why do we have to measure efficiencies in the Muon Detector? Muon Software Meeting, June 15th G. Lanfranchi LNF-INFN.
Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43.
G. PassalevaFirenze - September 8, 2004 Production Readiness Review Firenze MWPC Production Site G. Passaleva.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
19/6/2002S. Patricelli Muon week1 Status of RPC production (1) zThe leading production for RPCs is the the gas volume production at GT. All other items.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
CitiManager Cardholder Self- Registration
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

Panel production status Panels needed according to official plan Oct-05 A rate of 250/month is mandatory to match the chamber production schedule. ~5385 panels have been produced. The production rate is >300 panels/month. Total production ~6400 instead of 5700  end production in 3-4 months

Panels sent to production sites JuneJuly/AugSeptOctober M4R going on 140 ready M2R END- M5R M4R PAUSED M4R M5R26523PAUSED- M5R1-6038END M4R1--- Start next week

Panel quality all types of panels will be measured with Rome-2 laser device, providing sagitta in 10 positions along panel length and thickness in 7x10 positions x,y. This was not done in the past for small panels: just to shorten the delay between production and sending (this was my decision). This was not relevant. panel planarity is generally good (low fraction of rejected panels) thanks to the mould at lower temperature (Mario). Pads connected to ground : –my mistake: we did not check pad connections in R2 before panel production –in Potenza did not check pad continuity on the panels before bar gluing –In Ferrara they found the problem during M4R2 production, after all M5R2 chambers were built Even with verified FR4 foils (M4R2) we got some panels with pads connected t ground  how can it be ?? Imperfect production of M5R1 panels: bad attachment of foam to FR4. This has been solved but implied much more work for CERN group. The cause has been understood and the problem will be avoided in next production of M4R1 panels.

Material to complete productions M5R2 : 28 chambers assembled but 7 additional chambers will be built, because: 3 ch. with pad connections broken, 2 ch. with 2 pads connected to ground, 1 ch. with a broken wire, 1 ch. with 1 gap with floating pads (lower gain) M4R2 : several defective Pad panels, with pads connected to ground  panel production paused because material is finished. Chamber prod. going on. More FR4 and HV bars being ordered to complete 30 chambers. M2R3 : 50 good chambers; ordering material for 7 more spare chambers. M4R3 : all material available for 60 chambers. Panel production started (60). M5R4 : 65 ch. built in LNF / ~100 in Firenze (of which ~6 bad)  Ordering material to complete 210 good chambers taking into account the bad chambers and the material rejected during production M3R3 : 54 good chambers; 4 with problems (1 gas leakage; 3 with broken wire) Ordering material for 3 more chambers. M5R3 : we are completing 59 chambers (in 1-2 weeks). Ordering material for 1 more.

M1 honeycomb panels Giovanni and I visited the company Erbicol for production of honeycomb panels In few days they will receive the angular pieces and will start production of M1R4 panels. They will first produce few copper-copper panels to check the procedure and then start real production. LNF will produce 2-3 more M5R4 chambers if the M1R4 panels arrival will be delayed. Then, LNF will start production of 60 M1R4 chambers. Panel 2: GOLD top GOLD bottom A - B Panel 3: COPPER top GOLD bottom P - P C - C A - B Panel 1: GOLD top COPPER bottom C - C T holes Closed h. Throughg. h. T holes

Commissioning Board CoordinatorOlivier Callot VeloMassi Ferro-Luzzi STOlaf Steinkamp OTAntonio Pellegrino RICHNeville Harnew CalorimeterLeslie Camilleri MuonCarlo Forti + ? L0Renaud Le Gac TriggerHans Dijkstra Online Richard Jacobsson and Niko Neufeld Beat Jost and Clara Gaspar when needed ComputingMarco Cattaneo and Ricardo Graziani ElectronicsJorgen Christiansen InstallationRolf Lindner MagnetMarcello Losasso ManagementWerner Witzeling

Commissioning Board The Coordinator (O.Callot) is pushing for a quick start of the work. From his there is a mailing list registration via secretariat if you think some other people should be informed. there is a web site, almost empty, but this willhttp://cern.ch/lhcb-commissioning improve ! I think we should start regular meetings, with our two main activities: discuss and define the running scenario on one hand, and schedule the commissioning itself with requests for tool and services on the other hand. A short weekly meeting with VRVS seems appropriate for the time being (11:00 to 12:30 Geneva time) Many items to be discussed, much work to do : commission the sub-systems define the mode of operation for data taking in : start/stop sequences, calibration events, monitoring strategy, file change/storage strategy, and so on. define, produce, implement the needed tools prepare the detector through global commissioning, including the pilot run