1 Industry Shipperless &Unregistered Working Group Wednesday 7th July 10.00am at xoserve.

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

Shipperless & Unregistered Workgroup Wednesday 29 th January 2014.
1 Industry Shipperless &Unregistered Working Group Thursday 4 th March 10.30am at xoserve.
Industry Shipperless & Unregistered Working Group Wednesday 18 th April 2012.
SGN S&U Update Lisa Warnock 1 st November Agenda Data cleansing (set to dead/extinct) Shipper interaction SGN root cause measures.
Energy Networks Association Root cause solution for unregistered sites / MPRN creation David Mitchell 1 st November 2013.
1 Modification 422 Creating the permission to release data to Meter Asset Provider organisations A presentation by the Community of Meter Asset Providers.
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
Shipperless & Unregistered Workgroup Friday 1 st November 2013.
MPRN Creation Workgroup Tuesday 27 th March 2012.
Shipperless & Unregistered site working group Recommendations to Process Backlog Shipper Activity Monthly report No interest - orphaned Widened identity.
Industry Shipperless & Unregistered Working Group Wednesday 1 st February 2012.
1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve.
Shipperless & Unregistered Workgroup Friday 15 th March 2013.
1 Industry Shipperless &Unregistered Working Group Wednesday 5 th May 10.30am at xoserve.
Shipperless & Unregistered Workgroup Monday 1 st July 2013.
Nexus Workgroup CSEP Transition Topic June
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
IGT Single Service Provision Requirements Update – 27 th March 2013.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Shipperless & Unregistered Workgroup Wednesday 17 th September 2014.
PN UNC Workgroup iGT Services 7 th February 2012.
Industry Shipperless &Unregistered Working Group Thursday 17 th September 10:30 at Xoserve.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda – July 19 th 2007 Minutes from last IGG meeting10.00.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Current and New process Current Process New Process Response: Does not want service but live supply -Passed into Orphaned Report Intends to confirm – Remains.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Results of Group Discussion. Discussion Points Shipperless and Unregistered Sites have been partly There are a number of Shipperless and Unregistered.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – November 1s t 2006 Minutes from last IGG meeting10.00 – Networks AIM Project.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
1 Industry Shipperless &Unregistered Working Group Wednesday 8th September 10.00am at xoserve.
1 Industry Shipperless &Unregistered Working Group Thursday 7 th January 10.30am at xoserve.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
IGT and Shipper Workgroup meeting 28 th February 2011.
David Addison / Steve Deery
IGG Agenda – April 19th 2007 Minutes from last IGG meeting – 10.10
Nexus Meter Read Performance April 2018
Must Read Process Guide For Shippers
Chris Warner Network Code Manager
Agenda Action Review Update on IX and iGT access Testing strategy
Industry Shipperless & Unregistered Working Group
Industry Shipperless & Unregistered Working Group
Project Nexus Workgroup
Shipperless and Unregistered Workgroup
Connections & Registration
AUG Query Responses 21st November 2013.
Deferral of Retrospective Updates Functionality
Development modification group 194
Development modification group 194
Joint Theft Reporting Review (from meeting 1st March 2019)
Unregistered Sites Reports
M Number Creation process
CSEPs SPA Rejections November 2007 update
Development modification group 194
Development modification group 194
Modification 421 – Updates and Benefits Case
CSEPs SPA Rejections December 2007 update
Unregistered and Shipperless Process
Actions Updates Action 0282/006 – Exclude from AQ process
Development modification group 194
Customer Issue Management CoMC Update for April & May 2019
CSEPs SPA Rejections January – August 2007
Shipper MI (Shipper Pack / PARR)– Update
Further Considerations
Customer Issue Management CoMC Update for June 2019
Industry Shipperless & Unregistered Working Group
Development Work Group 194
Presentation transcript:

1 Industry Shipperless &Unregistered Working Group Wednesday 7th July 10.00am at xoserve

2 Agenda  Introduction: (30 minutes) (Alison Jennings & Mark Woodward) Previous minutes  Statistical Information: (30 minutes) (Mark Woodward) Overall industry position with unregistered and shipperless meter points  Root Cause: (1 hour 30 minutes) (ALL) Timescales for MPRN creation – Conclusions from meeting in May xoserve is not informed of new service job cancellations or deferment – Conclusions from meeting in May 3Service laid but no MPRN is requested. MPRN Creation Request rejections are not resubmitted. Later manifest as Fast Track Queries. 4Inaccurate tagging of services Potential dual billing. Potential duplication. Potential crossed meters. 5MPRNs Created for IGT / LPG Sites Growing market. How do we prevent this from happening?

3 Statistical Information

4 Overall Industry unregistered and Shipperless Sites meter points

5  Latest set of reports for March – April 09 sent out in May 10 Next set of reports for May – June 09 - to be produced end of July 10  Shipper Activity: Sent out: 658 Domestic (82.83%) I&C (17.17%) 2 shipper organisation responded to May reports: 93 sites responded to (14.14%): 19 – YES – Intend to confirm 23 - Alternative sites 1- Still investigating 36 - No contract 14 – No Live Service 1 shipper organisation responded to a previous report 49 sites responded to: 49 – No Live Service  Orphaned Report: Sent out: 16,403 (16,452) Domestic –14,188 (86.24%) I&C - 2,264 (13.76%) Age Analysis: Overall Industry unregistered and Shipperless Sites meter points Date of CreationVolume% Pre % 20001, % % 20021, % 20032, % 20041, % 20051, % 20061, % 20072, % 20083, % % TOTAL16, %

6  No Activity and Legitimately unregistered: No Activity: Volumes: 5,878 Domestic – 4,976 (84.65%) I&C (15.35%) Age Analysis: Overall Industry unregistered and Shipperless Sites meter points No Activity Date of CreationVolume% Pre % % % % % % % % 20071, % 20082, % 20091, % TOTAL5, %

7  Shipperless Sites (PTS&SSP): PTS Sent out 985 Domestic – 881(92.54%) I&C - 71 (7.46%) SSP Sent out 3,205 (3,580) Domestic – 3,220 (89.94%) I&C (10.06%) Legitimate Date of CreationVolume% Pre % % % % 20031, % 20041, % 20052, % 20064, % 20076, % 20086, % % TOTAL24, % Legitimately unregistered: Volumes: 24,136 Domestic – 21,111 (87.47) I&C - 3,025 (12.53%) NB: Based on AQ’s not yet used Age Analysis: Overall Industry unregistered and Shipperless Sites meter points

8 Total initially sent out NovConfirmations Set to EXDeferred Legitimately Unregistered Left O/S With Meter details Unknown if Meter Fitted Shipper Activity No Activity1, Analysis of latest movement to the population from the reports sent out in late November for October/November 2008  Currently targeting the remaining figures should have results by next meeting

9 Root cause

10 Root Cause Topics Unregistered Meter Points Not receiving Cancelled M Numbers by UIP or shipper Legitimately unregistered Shipper not confirming sites IGT Sites Shipper requested M Numbers Address issues Duplicates Meter point set to Dead – Either correct or incorrect – New M Number created No End Result Timeframe for Creation of an M Number No response to shipper reports

11  Timescales for MPRN creation  xoserve is not informed of new service job cancellations or deferment Root Cause Topics – To conclude

12 3. Service laid but no MPRN provided Fast Track Queries are running at an average of 2,826 per year UIP Rejections are running at an average of 7,478 per year We carried out some analysis with the aim of identifying why fast tracks queries were not raised via the UIP route. Our Findings were as follows: Volume Percentage UIP Creation rejected and not returned % UIP Creation never raised % UIP Creation received around the same time % Address or quality issue % Root Cause Topics

13 Root Cause Topics 3. Service laid but no MPRN provided (continued)  Problems/issues: Service laid however, no MPRN creation ever received Historic MPRN creations rejected back to UIP’s and never re-submitted Fast Track queries having to be raised  Discussions points: What check do networks have in place to ensure a new MPRN is created for a completed job?. Does awareness need to be raised on what constitutes an MPRN creation upon job type (i.e. alterations/ new connections)? What checks are completed by a shipper prior to creation of fast track? Are all UIP’s aware of the procedure? What do xoserve provide the UIP’s?

14 4. Inaccurate Tagging of Services Duplicates raised between January 2010 – May 2010 NB: Not all necessarily treated as duplicates  Problems/issues: Services not being re-labeled if MPRN set to DE in error Multiple data labeling service companies in operation (Some allocate MPRN’s to new UIP’s) Developers amend their plans post the original quotation Meters being fitted to cancelled jobs Data Quality If An MNC MPRN is created and confirmed by a shipper prior to receiving FOM request the label details will be incorrect. Risk of crossed meters & services if large development (i.e. block of 200 flats) Dual Billing Root Cause Topics AgeVolume Pre 20001,

15  Discussions points: What do MAM’s do if asked to fit meters to properties where M Numbers are different to that provided by Supplier? What happens if a MPRN is created following quotation acceptance then, subsequently the job is cancelled and re-quoted under a new MPRN. Is the original label re-called? Why would shipper erroneously confirm a new MPRN? If a service has been identified as labelled incorrectly does the UIP investigate and re-label the service if required? What are the current obligations on labelling of services? Root Cause Topics

16 5. MPRN’s created for IGT/LPG sites IGT (Duplicates) raised between January 2010 – May 2010 Unfortunately, xoserve are limited on the number of IGT checks for our MPRN creation processes due to availability of systems and lack of regulation. Some of the checks we do complete are: xoserve check via web based system In order to identify the official list of IGTwww.spaa.co.uk MPRN’s (74 to 77 ranges xoserve also cross reference our IAD systems as IGT’s upload their portfolio’s on a monthly basis. xoserve also checks UK-Link. If it is identified that the street or town does not exist, we will refer the request back to UIP/ Shipper to seek assurance that this not an IGT area xoserve also send out a bi-monthly no activity report to UIP’s for shipperless and unregistered sites that remain unconfirmed for greater that twelve months. In turn, they check the sites against their records to confirm if they are IGT sites Regrettably, as our checks are so limited there is a real risk for 9 series MPRN’s being created that are IGT sites Root Cause Topics AgeVolume Pre TOTAL291

17 Root Cause Topics 5. MPRN’s created for IGT/LPG sites (continued)  Problems/issues: Unknown volume IGT’s & LPG’s are currently not regulated under UNC or obliged to provide all industry players with information on their portfolio’s xoserve is limited as to the number of checks that can be completed to identify IGT/ LPG sites and on occasion 9 series MPRN’s are created for IGT/LPG’s Discrepancies exist between the IGT information held on IAD compared to certain MAP’s system Since the sale of the Networks in 2006 no centralised national MAP’s (ordnance survey) system currently exists The IGT Market is growing

18  Discussions points: Are MAM’s aware if they fit a meter to an IGT pipework? Do IGT’s do pipework and fit meter at the same time? How can we reduce the number of IGT/LPG sites being submitted by UIP’s and shippers? Are there any additional check’s both UIP’s and xoserve can complete that may not have been originally considered? Can the Network assist both UIP’s & MAM’s identify IGT areas. Plus xoserve to review current unregistered portfolio to identify if IGT sites that may exist within it? Root Cause Topics