Welcome This 15-minute presentation will be repeated throughout tonight’s hearing and will begin shortly. This presentation, including all aerial layouts,

Slides:



Advertisements
Similar presentations
1 FM 2499 From: Spinks Road To: FM 1171 PUBLIC HEARING November 16, 2004.
Advertisements

PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
U.S. 20 Pavement Replacement Project Michigan City High School Wednesday, September 17, 2014.
Proposed S.R. 26 Pavement Replacement Project Thursday, December 13, :00 p.m. Presentation East Jay Middle School 225 East Water Street in Portland.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
State Road 46 Pavement Replacement Owen Valley High School Wednesday, September 3, 2014.
S.R. 1 Intersection Improvement Project Wells County Public Library, Bluffton, IN 6:00 p.m. Presentation Thursday, April 24, 2014.
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
New I-65 Interchange at Worthsville Road Welcome!.
U.S. 33 Northern Connector Alternative
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
Environmental Assessment Public Meeting
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
S.R. 3 / South State Street Added Auxiliary Lanes Project in North Vernon Wednesday, June 29, :30pm Presentation Jennings County High School.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
I-65 Added Travel Lanes Project in Tippecanoe County
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
1 Acquisition, Relocation and Displacement Requirements For Grant Administrators.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
FEDERAL REQUIREMENTS FOR RIGHT OF WAY FHWA & The Uniform Act.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
1 Welcome to the International Right of Way Association’s Course 501 Residential Relocation Assistance 501.PPT.R
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
The Roads Ahead Leroy D. Alloway, Director Community Development.
1 Acquisition, Relocation and Displacement For Local Officials.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
U.S. 224 Road Reconstruction Project from the St. Mary’s River Bridge to just east of Jackson Street in Decatur, Adams County 6:30pm Presentation Erekson.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Thou Shall It’s Appealing For Short Takin’ Care of Business Odds & Ends
New I-65 Interchange at Worthsville Road April 11, 2013 Welcome!
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
U.S. 33 Road Reconstruction Goshen High School Auditorium 6 p.m. Wednesday, August 20, 2014.
STA Safety Project PID #76439 December 12, 2006.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Move It Likened to Another By the Numbers One Man’s Opinion Defined By
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, January 21, 2016.
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
State Route 28/U.S. Highway Route 127 Improvements Project Fentress County, Tennessee Public Hearing March 15, 2011 South Fentress Elementary School 5018.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
EAST BATON ROUGE PARISH PECUE LANE/I-10 INTERCHANGE EAST BATON ROUGE PARISH CITY/PARISH PROJECT NO. 09-CS-US-0041 STATE PROJECT NO. H FEDERAL AID.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Essential Requirements of the Uniform Act for Local Public Agencies
Four Winds Condominium Association August 2, 2017
The Oakton Condominium Association September 12, 2017
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
S.R. 26 Road Rehabilitation in Clinton County
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
U.S. 20 at State Road 2 New Interchange
Presentation transcript:

Welcome This 15-minute presentation will be repeated throughout tonight’s hearing and will begin shortly. This presentation, including all aerial layouts, is available on the LDOTD website at wwwapps.dotd.la.gov/administration/public_info/projects/

JUBAN ROAD WIDENING I-12 TO US 190 (FLORIDA BOULEVARD) LIVINGSTON PARISH, LOUISIANA State Project Nos. H & H Federal Aid Project Nos. H & H Open House Public Hearing October 13, :00 – 7:00 p.m.

OBJECTIVES OF PUBLIC HEARING  Provide information about the proposed project and preferred build alternative  Solicit comments on the Supplemental Environmental Assessment and the proposed project  Provide public opportunity to learn about LDOTD’s Right-of-Way Acquisition and Relocation Assistance Program  Provide public opportunity to learn about implementation of LDOTD’s Complete Streets and Access Management Policies

The proposed project was originally part of an Environmental Assessment for the Juban Road Interchange at I-12, which was approved by FHWA in September At that time, LDOTD’s proposed widening of Juban Road from I-12 to US 190 consisted of the construction of four travel lanes; a continuous center turn lane; and curb and gutter drainage. That alternative has been dropped from further consideration because LDOTD now requires any multi-lane roadway to be constructed with a median, which excludes a continuous center turn lane. The proposed project now calls for the upgrade of the existing roadway with a new roadway that meets current design criteria, which includes the Department’s Access Management Policy and Complete Streets Policy. Original Environmental Assessment September 2002 The proposed project is a Supplement to the previously approved EA.

1.Document Purpose and Need of Project 2.Develop Reasonable and Feasible Build Alternative to Address Purpose and Need 3.Evaluate Effects of Build Alternative to Community and Environment 4.Summarize Evaluation in Supplemental EA 5.Hold Public Hearing on Supplemental EA 6.Prepare Supplemental EA with Finding of No Significant Impact (FONSI) NEPA PROCESS DONE NOW DONE NEXT 1 1 National Environmental Policy Act

PROPOSED PROJECT DESCRIPTION  Widen and improve Juban Road from two to four lanes from I-12 to US 190, including three roundabouts, frontage roads, and shared-use paths  Widening would be along the existing center line of the roadway  Additional right-of-way required on both sides  Residential and business relocations would occur  Length of construction approximately 1.2 miles

PURPOSE AND NEED  Upgrade the capacity of Juban Road from two lanes to four lanes to relieve traffic congestion and improve access to Interstate 12  Modify the Juban Road intersection with US 190 (Florida Boulevard) as required to improve traffic operations

BUILD ALTERNATIVE  PHASE I (H ): Roundabout at US 190  Construction of a roundabout at US 190 / Juban Road intersection  Widen US 190 to four lanes as it approaches the new roundabout  PHASE II (H ): Juban Road I-12 to US 190  Four 12-foot wide travel lanes with a 5-foot wide raised median  10-foot bicycle/pedestrian shared-use path (both sides of roadway)  Two roundabouts: one located just north of I-12 and one located mid- way along the project corridor approximately 1,600 feet south of the intersection of US 190 Construction of frontage roads to the east and west of the center roundabout Curb & gutter with subsurface drainage would be installed along Juban Road and US 190.

PROPOSED ACTION

o Widening and upgrade of Juban Road in the project area would not occur. o Existing roadway would remain as is with two travel lanes and open ditches. o Future capacity concerns would not be addressed. o Juban Road would remain without shared-use paths. o No residential or business relocations would be required. o No potential impacts to wetlands or other waters would occur. o No utility relocations would be required. o The short-term adverse construction impacts would be avoided. NO-BUILD ALTERNATIVE The No-Build Alternative is anticipated to result in continued degradation of the level of service (LOS), which is currently at LOS F.

Access Management is the careful planning of access connections to roadways and highways. Access connections can include driveways, streets, and other means of connecting to a roadway. One method of maintaining access is through the use of a median. WHAT IS ACCESS MANAGEMENT?

Roundabouts are one-way, circular intersections designed to improve safety and efficiency for motorists, bicyclists, and pedestrians. In a roundabout, traffic flows around a center island counterclockwise. A roundabout redirects some of the conflicting traffic, such as left turns, which cause crashes at traditional intersections. WHAT IS A ROUNDABOUT?

Can roundabouts accommodate larger vehicles? Roundabouts provide an area between the circulatory roadway and the central island, known as a truck apron, over which the rear wheels of these vehicles can safely track. Yes. Roundabouts are designed to accommodate vehicles with a large turning radius such as buses, fire trucks, and eighteen wheelers.

Adopted by LDOTD in July 2010 Plan, fund, and design sidewalks and other pedestrian facilities determined by the context of the roadway Provide bicycle accommodations appropriate to the context of the roadway On all new and reconstruction roadway projects, LDOTD will: COMPLETE STREETS POLICY

Relocation ImpactsUnitsNo ActionBuild Residential RelocationsEach015 Commercial RelocationsEach02 Vacant/Unused StructuresEach02 Other RelocationsEach00 Frontage ImpactsUnitsNo ActionBuild Residential PropertiesEach075 Commercial PropertiesEach015 Community PropertiesEach00 REAL ESTATE IMPACTS

Natural ResourceUnitsNo ActionBuild WetlandsAcres Other Waters of the USAcres Stream CrossingsEach01 Scenic StreamsEach00 Sole Source Aquifer ImpactsAcres00 Protected SpeciesEach00 Prime and Unique FarmlandEach00 Coastal Resources and Essential Fish Habitat EachN/A NATURAL RESOURCES IMPACTS

Cultural ResourcesUnitsNo BuildBuild Properties Eligible for or Listed on NRHP 2 Each00 Properties Not Eligible for NRHP 2 Each00 Section 6(f) PropertiesEach00 Section 4(f) PropertiesEach00 Noise Impacts 3 UnitsNo BuildBuild Anticipated Receptors Impacted in 2034Each3432 CULTURAL RESOURCES AND NOISE IMPACTS 2 National Register of Historic Places 3 Noise abatement measures were not found to be reasonable or feasible and are not being proposed as part of this project.

A representative of the LDOTD Real Estate Section has a table here tonight and is available to answer any questions pertaining to LDOTD’s Right of Way Acquisition and Relocation Assistance Program. The LDOTD brochure explaining Acquisition of Right of Way and Relocation Assistance Program is available tonight at that table or can be obtained later from: LDOTD Real Estate Section P.O. Box Baton Rouge, LA (225) We suggest you read the brochure carefully. If you have any questions regarding your individual situation, consult with the agent when s/he meets with you, or contact the Region 04 Real Estate Office at the number above. Right-of-Way Acquisition and Relocation Information

Steps in the Acquisition Process It is LDOTD's objective to pay just compensation for all properties required for the proposed project. Owners of required properties may be contacted by an appraiser or appraisers and given the opportunity to go with them on the inspection of the property. This will provide owners an opportunity to point out things that may be important to the evaluation of the property. All evaluations will be reviewed by a review appraiser and approved by LDOTD. After review and approval, a Real Estate Agent will contact each property owner, and present a letter setting forth the amount of the LDOTD's cash offer for the purchase of the property. S/he will also explain the property value and discuss any alternate offers including possible options to keep and move any buildings, fencing, etc.

RELOCATION ASSISTANCE  Relocation Advisory Services  Current and continuing information on:  Availability and prices of comparable decent, safe, and sanitary dwellings for displaced residents  Comparable commercial properties and locations for displaced businesses  Finance charges  Federal and State programs offering assistance to displaced persons  Relocation Assistance Payments  Relocation assistance payments are separate and in addition to payments for the purchase of your property. They are made for:  Moving expenses  Replacement housing  Business re-establishment expenses  Moving expense payments will be made to any individual, family, or business, in legal occupancy of the property either at the start of negotiations or at the time of purchase.

RELOCATED BUSINESSES Displaced businesses, farms, and non-profit organizations may be paid the actual, reasonable expenses of moving, together with certain eligible costs incidental to the move. Some businesses may also be eligible for certain actual costs incidental to re-establishing their businesses. Instead of payment for moving expenses, some business owners may be eligible to receive a payment based on the average annual net earnings of the business. If the business meets the qualifications, this payment shall not be less than $1, nor more than $40, Moving payment information for businesses may be found beginning on Page 22 of the Acquisition of Right of Way and Relocation Assistance Program brochure.

REPLACEMENT HOUSING PAYMENTS Replacement housing payments are also available to qualifying owners and tenants: Must occupy property at start of negotiations Must have been there at least 90 days Must move into decent, safe, and sanitary replacement housing The amount of your maximum supplemental payment will be given to you in writing. Additional requirements and payment limits may be found beginning on Page 14 of the Acquisition of Right of Way and Relocation Assistance Program brochure. Certain owners and tenants not in occupancy for at least 90 days or who become occupants after negotiations have started may qualify for replacement housing payments: Must have been in occupancy at the time the property was acquired by LDOTD Must move into decent, safe, and sanitary replacement housing

RIGHT TO APPEAL Applicants for a relocation payment have the right to appeal the LDOTD's determination of their eligibility for payment and/or the amount of payment. Appeals must be submitted to the Right of Way Regional Manager within 60 days after the applicant has been notified that his claim has not been approved. Final decisions on eligibility and payments will be made by the LDOTD's Real Estate Administrator in Baton Rouge. Additional information on appeals may be found on Page 26 of the Acquisition of Right of Way and Relocation Assistance Program brochure.

OTHER TERMS and CONDITIONS To the greatest extent practicable, no person lawfully occupying real property shall be required to move without at least 90 days written notice from LDOTD. The notice will indicate the specific date the property must be vacated. No person lawfully occupying a dwelling will be required to move unless, and until, comparable, decent, safe and sanitary replacement housing is made available within the general area of the project. The replacement housing must be available within a reasonable time prior to the scheduled move of the occupants, and must be within the occupants' financial means. Replacement housing must be fair, open, and offered to all persons regardless of race, color, religion, sex or national origin.

Prior to negotiating for purchase of your property, a District Real Estate Specialist will personally contact and interview all persons who will be required to relocate. The benefits will be explained and a determination made of individual needs and intentions for relocating. A SPECIAL WORD OF CAUTION Before moving or purchasing replacement housing, contact LDOTD to assure your eligibility and the prompt payment of your relocation benefits. If you move without prior notification to LDOTD, you risk losing all possible benefits provided by the Relocation Assistance Program. OTHER TERMS and CONDITIONS

BECAUSE….  Community concerns and preferences are factors that are considered.  All comments must be considered in the Supplemental Environmental Assessment.  We need to know if there are any remaining resolvable issues or opportunities with the project as proposed. WHY COMMENT ? Comments received tonight or post-marked by October 23, 2015 will be part of the official transcript of this public hearing.

Thank you for your time. Please visit the remaining stations to view the exhibits and provide your comments. This is the end of the presentation.