G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Update on the bakelite gluing Feb 2002: first warning from BaBar  13 gaps (over 48) accepted (27%) (i.e. max 2 non contiguous unglued spacers)…the remaining.
Projective platforms gluing for ATLAS chambers J.-Ch. Barrière, V. Gautard, P. Ponsot, Y. Reinert, Ph. Schune for the Saclay muon hardware group CEA Saclay.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
MAGIC II Mirrors and reflector M. Doro Udine. MAGIC Collaboration Meeting. 2006/05/10-13.
Status Update on Mechanical Prototype in Rome November 6,
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
TRD Status meeting Münster Clemens Adler TRD ROC Status The long and winding road to production start.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
TRD status meeting GSI Clemens Adler TRD (Pre-)Production Status New Results/Experiences Problematic issues Production Plans Timescale.
/06/2015 Christian J. Schmidt GSI Production of ALICE TRDs Progress and Quality Development Alice TRD Chamber Production Meeting Darmstadt Feb.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
8.7.04TRD Status meeting HdClemens Adler TRD ROC Status.
TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Ferrara 8 june 2004M.Savrié1 Production Readiness Review Ferrara MWPC Production Site.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Production Readiness Review Production steps and quality control 1.Panel production 2.HV bar gluing 3.Preparation of side material 4.Wiring and gluing.
RPC production at GT (status and plans). Status After the IFR meeting in Rome a new version of the Production Plan have been proposed to GT Main requirements.
T.Schneider/LHCb Muon EDR
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Brussels Gantry Ê Problem with vacuum chambers in plate 4 leaks in plates with gives communication between positions Ë Problem with rotation motor (U-motor)
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Panel production status Panels needed according to official plan Oct-05 A rate of 250/month is mandatory to match the chamber production schedule.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43.
G. PassalevaFirenze - September 8, 2004 Production Readiness Review Firenze MWPC Production Site G. Passaleva.
G. Passaleva Status of MWPC production site in Florence G. Passaleva.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Status of straw production straw module assembling
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Overview of the Frascati Production Facilities
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva

Roma - July 28, 2004 Infrastructure Wiring machine in the clean room Consolle of the wiring machine View of the open area and the “gray room” Yunshan in the “gray room” picking up panels for measurements

G. PassalevaRoma - July 28, 2004 Panel gluing 1.Panels are checked for planarity… 2.…cleaned under the hut with isopropilic alcohol… 3.…glued on the gluing machine with automatic glue dispensing… 4.…measured again after gluing… 5.…and stored in the shelf

G. PassalevaRoma - July 28, 2004 wiring machine Laser soldering bridge Glue dispensing bridge and wire torque motor

G. PassalevaRoma - July 28, 2004 Assembly tables Panels wired glued soldered and cleaned are… 1.…measured with WTM… 2.…and with WDM, 3.tested for HV with the nAmperometer. 4.On the same table we glue side bars Final chamber assembly table (thanks to ROME 2 for the realization of the tools) 3

G. PassalevaRoma - July 28, 2004 Quality controls: WTM, WDM,HV test WDM cameras WTM hammer laser spot and photodiode HV connections and nAmperometer

G. PassalevaRoma - July 28, 2004 Building chamber 1 a) Wiring machine enters the clean room c) Placing the spacers… b) Gluing the top bars… d) The chamber is ready to be closed We built ch1 to go through the full production chain. The WM placed in the clean room on the 28 th of June The chamber was closed on July 10 and brought to LNF the 13 th. Ch1 was built with the very first panels assembled. Panel L1 in particular was one the first glued with the automatic gluing machine Gap A was severely leaking (most probably due to bad gluing of the HVbar see above) and needed to be sealed. Several wires needed to be replaced (  repair procedure tested)

G. PassalevaRoma - July 28, 2004 Building chamber 1 Fernando checks with the spacers the clamping strength The chamber is closed

G. PassalevaRoma - July 28, 2004 Results on chamber 1 Test LNF Many thanks to M. Anelli ! HV: 2.6 kV. Expected current: 100 nA Gap A was leaking from one corner (probably hvbar not well glued) Gap B looks reasonable Gap C is not uniform and the gain is too low Gap D looks more uniform but in fact there is current limitation set by Mario !!!!

G. PassalevaRoma - July 28, 2004 Building chamber 2 Two panels (701,1255) already wired,soldered and tested Two panels (706,1027) glued and measured Plan to close ch2 by the end of this week

G. PassalevaRoma - July 28, 2004 Building chamber 2: HV bars gluing Hv bar height after gluing. Measurements taken near the spacer holes with a comparator. Yellow: panel #706 (first batch) Green: panel #1027 (last batch)

G. PassalevaRoma - July 28, 2004 Building chamber 2: WTM Panel 1255 Mean=63 g Sigma = 2.5 g Panel 701 Detailed analysis from raw data Panel 701 Display of WTM program

G. PassalevaRoma - July 28, 2004 Building chamber 2: WDM Panel 701 camera 1Panel 701 camera 2

G. PassalevaRoma - July 28, 2004 Building chamber 2: WDM !!! Panel 701, camera

G. PassalevaRoma - July 28, 2004 Building chamber 2: WDM Panel 1255 camera 1Panel 1255 camera 2

G. PassalevaRoma - July 28, 2004 Building chamber 2: HV test Measurements taken with the LNF nAmperometer. Panel 1255 Panel 701

G. PassalevaRoma - July 28, 2004 Road towards the PRR At the moment the main missing item is (still !!!!) the laser soldering (even though it is finally converging) Ch 2 will be closed this week We will try to close another 3 chambers by the end of august (test all or some at LNF ?) Clearly, we want to understand well all the problems that are arising while building our first chambers