Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.

Slides:



Advertisements
Similar presentations
Module Metrology Peter Sutcliffe. Peter Sutcliffe – Module Metrology Wenzel CMM Module Metrology carried out on Wenzel CMM with module jig aligned along.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Stave 130 Tooling John Carrol & Tim Jones. Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
Electrical tapes for the ATLAS phase II barrel strip tracker upgrade
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
Electrical tapes for the ATLAS phase II barrel strip tracker upgrade Roy Wastie, Tony Weidberg Oxford University.
Recent Mechanical Barrel Stave Development BNL; S. Duffin, A. Gordeev, D. Lynn, G. Mahler: LBNL; C. Haber, M. Gilchriese: Yale; W. Emmett, A. Martin, P.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Hybrid Integrated Circuit
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
Progress on staves – mechanical & thermal. Core and materials.
Low Mass Local Supports for the ATLAS Upgrade Inner Silicon Barrel Tracker Peter Sutcliffe University of Liverpool On behalf of the ATLAS Upgrade Inner.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
WP4 – Plans for next 6 months
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Visit to Heidelberg Loek Ceelie Henk Schuijlenburg.
BNL & Yale Mechanical Stave Developments BNL: David Lynn, Marc-Andre Pleier, Anatoli Gordeev, Russ Burns, Ken Sexton Yale: Paul Tipton, Will Emmet, Tom.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
Stave 130 Envelope Peter Sutcliffe Strip Mechanics 20 th February Lancaster.
Stave130 Assembly Jig (Tim). Current Tooling Components – CF jig + ‘C’-channel jig & various face-sheet positioning aids It works! – Seems to produce.
DOE Rev of Run IIb Sep 24-26, Run IIb Silicon Mechanical Design  Run IIa and IIb geometries  Sensor dimensions, numbers, and drawings  Hybrids,
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
Stave production.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
Stavelet 09 and Storage/Assembly/Survey Frame Progress Report Brookhaven National Laboratory David Lynn, Susan Duffin, Anatoly Gordeev, Ken Sexton Yale.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Stave Tooling & Plans for Future Stave-building (Tim)
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
EC: 7 DISK concept Preliminary considerations
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Summary LBNL LSWG meeting
T. Bowcock University of Liverpool
Sector 002 Assembly status report
Mechanics: (Tim).
Constructional requirements from ITk-Strips
WP4 – Plans for next 6 months
Reminder of Stave250 Tooling Design
Equipment for Assembly – UK Experiences
WG4 – Progress report R. Santoro and A. Tauro.
Presentation transcript:

Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015

Barrel strip tracker geometry 25/07/20142 LayerNo of Staves in 360° Radii to Centre of Stave (Stub) Total Number of Cylinders: 5 Total Number of Staves: 600 (including stub and no spares) – currently 8 different stave flavours Total Number of Modules: – 13 Modules per side of stave = 26 modules per stave – 2 Modules per side of stave for a stub

Current Stave Design Critical Dimensions: Overall Length 1277 Width 115 EOS at Z=0 to Silicon Edge 0.1mm Module to Module Gap 0.46mm Pitch of Modules 98mm 3 R Phi Side Stereo Side Peter Sutcliffe 25/07/2014

R-Phi Bus tape Co-cured to Carbon Skin EOS Closeout Cooling Tube Assy Stereo Bus tape Co-cured to Carbon Skin Allcomp foam Cooling strips Honeycomb core Carbon C Channels Allcomp foam End cooling Z=0 Closeout Stave components

Face sheet co-curing The Kapton tape and the high modules carbon fibre co-cured face sheets – 3 layers (0/90/0) of K13C2U(45gsm)/EX1515 – Cure at 120°C The tooling for this is an Ø10” Al half-section pipe – To compensate for differential thermal expansion of tape and carbon fibre – A 10mm oversized rim around the tape to avoid resin bleed and this rim is kept during stave core assembly. It gets milled away at the end of the sandwich production. 5 Resin bleed Sacrificial rim

Locking points gluing jig Stave core tooling Stave core assembly main vacuum jig – Made of Carbon fibre; – Series dowel holes provide the positional reference for the sub jigs; Main sub jigs are: – Glue masking jig – Foam block alignment jig – C-channel placement jig – Glue bath jig – Locking point gluing jig Vacuum jig (Liverpool) C-channel placement jig Foam blocks and end closeouts alignment jig 6

Foam block alignment jig

C channel placement jig

Step 1: place the face sheet on the main jig ( Reference feature: Using dowels at the two ends of the stave centre line to locate the face sheet to the main jig) Two reference fiducial marks /circles of 8mm diameter at the both ends of the over-size region will be added to the tape(Roy will add this feature in his tape design). These marks are used as a template for transferring reference. After co-curing the tapes, cut the OD 8mm holes on the face sheet reference to the fiducial marks, a round hole at z=0 end and a slotted hole at z=1.3m end. Place the co-cured face sheet onto the assembly jig with the tape side facing down and CF side facing up. Using dowel pins at both ends to locate it. Prototype of cutting such holes on the co-cured face sheet 9

Step 2: central ruler for masking 10

Step 3: Foam blocks and end closeouts alignment jig 11

Step 4: place cooling pipe Glue apply jig for cooling pipe 12

Step 5: C channels placement jig 13

Step 6: Glue bath jig Glue bath depth 0.5mm, with 1mm oversized Marking area for BN loaded glue if different glue for the cooling block area is required. Pin to locate the stave partial assembly 14

Step 7: locking point gluing jig NOTE: During the gluing of the locking points, the 10mm over-size region along the longer edges will be removed first, but at the both ends will remain for positioning the stave on the jig during the gluing and will be removed afterwards. 15

Stave production plan Liverpool / Oxford are to produce all the tooling sets, and – Each institute will produce a prototype stave using the given tooling; Or If tooling is produced at multiple site, then – This must reference to a single source of engineering drawings. Finished product will be sent back to a pre- assigned test centre to check conformity; 16