15 April 2010 Georgian Heights Alternative Elementary School New Building and Site Plan.

Slides:



Advertisements
Similar presentations
ELEMENTARY SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships.
Advertisements

Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
BUILDING PATHOLOGY AND DIAGNOSTIC case study: HOTEL ALBERI via lungo lario Isonzo –LECCO- STUDENTS: Janaina Gerde Muniz Gerardo Diosdado Espinosa Marco.
Bronze Award: Library/Media Center
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Design Review Planning to date Project scope summary
The Schwan Regional Amateur Sports Center Results of Bids and Recommendation to Award Contracts for Construction February 10, 2015 City Council Meeting.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Current Project Update October 25th 2012 Good Evening!!!
Centerville Elem. School Beverly, MA Front entrance.
Johanna Mikitka AE-390 October 13, 2004
Rebuild Stafford High School Update- October 2014.
Glenvar High School Renovations School Board Presentation
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
SHEPHERD ELEMENTARY SCHOOL PHASE I SHEPHERD ELEMENTARY SCHOOL PHASE I SITE PLAN.
Chapter 20 Cladding with Masonry & Concrete
Walls: Materials, Location, Load Bearing, Non-Load Bearing
Light weight concrete Home construction Home built with precast panels of aerated concrete.
Bar joist over kitchen and band room. Setting bar joist over kitchen and electrical/mechanical rooms.
Structural Systems CM 105. Precast Concrete Framing Offer exceptional strength and resistance to seismic stresses and high degree of fire safety Concrete.
Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River. Project lot area composed of 14,000 square.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
Decorating Living Space: Interior Design Unit. Elements of Design Space Line Form Texture Color.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
ADDITION & REMODEL Eugene Field Elementary School.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
LIVING TO DESIGN: The Architectural Design Project.
DER – Before, During and After: A Homeowner’s Perspective.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
HOME MODEL. P e r s p e c t i v e HOME MODEL 4.00m X 5.50m Floor Area = 22 sqm. Turn-over unit 4.00m 5.50m 1.4m 4.00m.
Design Development Review
Queen Anne’s County Public Schools New Construction of the Matapeake Middle School.
CTRA Green Features. 1. Green Roof 2. Hot Water Solar Heaters These are a type of solar panel. It is called evacuated tube collectors and they heat our.
TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4,
North Augusta High School Design Development Presentation.
SEDONA RED ROCK HIGH SCHOOL October 9, 2008 SCHEMATIC DESIGN – PHASE 2.
Learning, Health, and Safety Capital Project Alternates and Change Order
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Studio Pops is primarily a pure design studio, specializing in interior spaces.. through conceptualization, design, styling and accessorizing. What we.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission LU DZM The Parker Apartments July 12, 2012.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
Framing Vocabulary Stud: upright beams in the framework of a building
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
School Improvement Bond Projects
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
* 07/16/96 Site Development Plan * ##.
The Quality of Interior Design at PMU
College Park Elementary School & Turnbull Learning Center
Capital Improvements Presentation
BUILDING CONSTRUCTION 1
Progress Report 11/10/11.
Arch205 building construction wall systems
1 Semester Project Design A Multi Story Office Building
HISD Educational Learning Center STAFF PARKING Yellow Tag LOT
Q:\Pictures\Industrial\NWQ\Crescent IV\Crescent IV - pic for flyer.jpg
Common Components of a Traditional Wood Framed Building
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
North Augusta High School – Phase 2A and 2B
EAST PENNSBORO AREA SCHOOL DISTRICT
Presentation transcript:

15 April 2010 Georgian Heights Alternative Elementary School New Building and Site Plan

site plan

METAL ROOF SYSTEM – RED/ORANGE TONE PRECAST CONCRETE - JOINTS GROUND FACE CMU – 8X16” CMUPCI 5% Red Brown with Grey Cement PRECAST CONCRETE WITH FORMLINER - PLANKS PCI 1% Desert Buff with Grey Cement SANDBLASTED OR ACID-ETCHED PRECAST CONCRETE with JOINTS Metal trim and windows to match Metal roof system Sill Between First and Second Floor at Academic Wings Insulated metal wall panel at Media Center (color to match building color scheme)

first floor Main Entrance Educational Court Yard Loading Outdoor Dining N

second floor N

Interior Concept

Administration Area

Student Dining + Gymnasium

First Floor Spine + Art Room

First Floor: Art, Dining + Gym

Enlarged Typical Classroom Plans

Typical Floor Finish Pattern

First Floor: NW Academic Wing

First Floor: SW Academic Wing

Second Floor Spine

Second Floor: NW Academic Wing

Second Floor: SW Academic Wing

Restrooms