1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.

Slides:



Advertisements
Similar presentations
Flow-down of Strategic Priorities to Annual and 5-year WMKO Plan Taft Armandroff Hilton Lewis September 18, 2009 Taft Armandroff Hilton Lewis September.
Advertisements

Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
James Webb Space Telescope and its Instruments George Rieke (MIRI Expert) & Marcia Rieke (NIRCam Expert) Steward Observatory, University of Arizona The.
James Webb Space Telescope and its Instruments John Stansberry Steward Observatory, University of Arizona The First Light in the Universe: Discovering.
Introduction of Space Technology. The James Webb Space Telescope The James Webb Space Telescope was previously known as the Next Generation Space Telescope.
1 TIPS 4/18/2013 Status of JWST/ISIM Test Program Scott Friedman TIPS/JIM April 18, 2013.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Introducing JWST’s NIRISS: The Near InfraRed Imager & Slitless Spectrograph TIPS/JIM 2011 September 15 Alex Fullerton STScI / HIA.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September JWST Status.
JWST calibration requirements Harald Kuntschner. JWST - an overview NIRCam –0.6-5 microns –FoV: 2.16x4.4 arcmin (0.0317” for short band and ” for.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
(Almost) Everything You Need to Know About Preparing and Submitting Proposals to External AO’s Marc Postman On behalf of CMO, SMO, RMO and BRC April 28,
Venus Observations HST Program Objectives v Explain Venus observing strategy. v Review areas of special concern with Venus observations and explain.
Spitzer Space Telescope Lisa Storrie-Lombardi Spitzer Science Center, Manager & Asst. Director for Community Affairs Implementing Portals of the Universe:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
A Search for Earth-size Planets Borucki – Page 1 Roger Hunter (Ames Research Center) & Kepler Team March 26, 2010.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
AAAC Presentation JWST Status Eric P. Smith JWST Program Scientist.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
INS NIRSpec, 12 May 2005 Introduction to NIRSpec Michael Regan.
MIRI Optical System CDR, 6 th & 7 th December 2006 Mid InfraRed Instrument 07-1 Optical System Critical Design Review (CDR) TIPS Presentation: Margaret.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
Coding the JWST Calibration Pipeline(s) 2010 Calibration Workshop Robert Jedrzejewski/STScI.
JWST Calibration Error Budget Jerry Kriss. 15 March 20072/14 JWST Flux & Wavelength Calibration Requirements SR-20: JWST shall be capable of achieving.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
Cosmic Origins Spectrograph
Image Processing: Critical to Hubble Discoveries
STScI MSR template Page 1 Space Telescope Science Institute Guide Star Discussion August 27, 2007.
May 18, 2004Ron Allen, STScI Lunch Talk1 Space Interferometry Mission (SIM) Update - May 2004 Ron Allen SIM Mission Scientist Space Telescope Science Institute.
FGS Astrometry in 2 Gyro Mode E. P. Nelan STScI B. E. McArthur McDonald Observatory, U. of Texas.
The INS NIRCam Team.
Hubble Space Telescope By Brittany Bellows Physics 1040 – Spring 2011.
Astronomical Observational Techniques and Instrumentation
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
APT Overview for Transiting Exoplanet Proposals Chris Moriarty – APT Developer.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
An Early Release Science Program Janice C. Lee STScI Science Mission Office JWST Science Working Group Meeting 29 April 2015.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
“Phase C” Design of the JWST/FGS Tunable Filter Imager TIPS/JIM June 15, 2006 Alex Fullerton STScI / UVic.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
The Space Telescope and The Lagrangian Point.  Launch Scheduled for 2018 by European Space Agency  18 Segment Primary Mirror (Gold-plated Beryllium;
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
& Eric P. Smith HST/JWST Program Scientist Astrophysics Division NASA Headquarters.
Alex Fullerton STScI / NIRISS Team Lead
NIRSpec Time Series Observations
JWST Science Policy & Science Parallels
Observing Strategies and Constraints
Imaging with the James Webb Space Telescope
JWST Pipeline Overview
Single Object & Time Series Spectroscopy with JWST NIRCam
ESAC 2017 JWST Workshop JWST User Documentation Hands on experience
James Webb Space Telescope
Summary Single Object & Time Series Spectroscopy Jeff Valenti JWST Mission Scientist Space Telescope Science Institute.
Science Policies and Timeline
Motivation for a 95% Guide Star Acquisition Probability with JWST
How to implement coordinated parallels
MIRI Observing Templates
March ’05 Face to Face Meeting Introduction
Presentation transcript:

1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003

2 Space Telescope Science Institute JWST S&OC S&OC Proposal Original Proposal submitted November 2001  Proposed cost comparable to unsolicited proposal, (330M w fee over 10 years)  Project internal estimate: 140M (based largely on SMEX & MIDEX PI missions, inexpensive flight ops systems)  Extended review of proposal assumptions with Project in spring Revised proposal submitted on schedule (16 Sept.) to meet 176M target. Reductions achieved by the following assumptions: Govt. provides groundstations -- probably DSN Govt. provides I&T test system as basis of flight operations ground system (STScI was to provide originally) Govt. provides SI, OTE, S/C flight ops analysts for launch + 1 yr Just-in-time development schedule (no phased development to support SI, OTE, S/C dev.) No operations or science I&T support for SI, OTE, S/C. Reduced support to Project and SIs but w. overguides

3 Space Telescope Science Institute JWST S&OC Status of negotiations (began Jan. 15) Contract negotiations began in mid January  Project puts back: management oversight, Project support, special studies, PRD Ops. (~ 5M) and fenced these costs off.  Project poses a new Target of (without fee)  AURA can meet new Project target: STScI roles are reduced significantly compared to HST (and Chandra and SIRTF experience) »SI support »Commissioning planning for SIs and spacecraft. »Calibration software »Calibration analysis Assumes TRW develops I&T system near that needed for flight ops. Reduced planning system capabilities: no linked observations, routine scheduling of parallel calibrations, manual planning of the weekly calendar Late GO funding for Cycle 1 (Grants office startup delayed) Contract will be revised after results of replan: reduced instrument complement?, delayed schedule.

4 Space Telescope Science Institute JWST S&OC Key Assumptions SI s: The three JWST instruments will have the capabilities and complexity outlined in the ASWG and Project Scientists recommendations. In particular: -The NIRCam will be a wide field, infrared camera with a limited set of fixed-band filter combinations (<20) and several elements used exclusively for wavefront-sensing. -The NIRSpec will be a multi-object, single-order spectrograph with addressable apertures and a small number of fixed- position gratings (< 6). -The MIRI will have two elements: a camera with a small number gratings and potentially a fixed pupil mask and Lyot stop for coronagraphy; a slit spectrograph with R ~1500 and a small number of fixed-position gratings. -All three instruments will have a single target acquisition mode (including PEAKUP and/or PEAKDOWN). All three instruments will have a small number of common readout schemes (<3) and a common data format.

5 Space Telescope Science Institute JWST S&OC More Key Assumptions The S&OC systems will not support parallel activities. These include parallel calibration, pure parallel or coordinated parallel observations and parallel modes within instruments. Level 2 requirement is applicable to the Observatory. The Fine Guidance Sensor will be sufficiently capable to enable guide star availability and selection to be done in an automated fashion by the S&OC. This assumes a wide field, highly capable guider that can satisfy the Level II requirement ( ) for the 95% probability of guide star acquisition.

6 Space Telescope Science Institute JWST S&OC Many Miscellaneous The peak flight to ground data rate will be 25 GB/day. Level 1 data products will be available at L+3 months. Level 2 data products will be available at L+6 months. Targets of Opportunity are not supported within the time period of this contract. Etc. (about 70 such assumptions)

7 Space Telescope Science Institute JWST S&OC Current Status Technical aspects of contract appear to be satisfactory to NASA 2-3 week period to acquire needed signatures

8 Space Telescope Science Institute JWST S&OC Replan Status Challenge was to meet:  Stringent budget limits in FY04-07  Launch date as close as possible to 2010  Overall cost of 1.6B NASA HQ has settled on Option 4i  Launch in August 2011  About 110M cut in US instruments (down from ~ 160M) No MIRI 1/4 of NIRCam FOV, 1/8 NIRSpect FOV  Reduced primary mirror area (but meets spec)  Reduced testing plan  Challenged Project to save 40-50M in other areas to help restore instruments.

9 Space Telescope Science Institute JWST S&OC SWG & Project Studies SWG considering merging NIRCam and Canadian FGS:  Potential saving of accommodations (mass, computer)  Elimination of short wavelength tunable filter  Shared electronic and detector procurement Project finding it difficult to achieve matching savings Other possibilities:  Loss or reduced short wavelength performance.  Increased role for ESA in MIRI Emergency meeting for SWG in April 10,11