Presentation is loading. Please wait.

Presentation is loading. Please wait.

MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September 2008 1 JWST Status.

Similar presentations


Presentation on theme: "MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September 2008 1 JWST Status."— Presentation transcript:

1 MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September 2008 1 JWST Status

2 MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September 2008 2 JWST Mission Status Across the whole observatory there is now -A lot of FM hardware in production -Many good test results at observatory subassembly level (the other instruments, mirror backplane, ISIM structure.....) -Some not so good test results and “issues in work” -So much like us Overall schedule to launch date is still being held -Test programme is starting to stabilise Following successful Non-Advocate Review NASA is fully committed to JWST -There is now a very large team at both GSFC and NGST -Peak years of engineering effort and cost are now and next year !. First Flight Mirrors are about to start testing (after polishing)

3 MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September 2008 3 Technical Areas Currently Getting a Lot of Attention Sunshade deployment -A special review is planned to ensure problems have been solved (tightness of edges of sunshade affect efficiency) Alignment of instruments to the (ISIM and) telescope and of telescope itself -A lot of work in this area, extremely tight tolerances (microns over meters) -Detailed review of OGSE about to start. -MIRI pupil lens will be used in for in-flight measurement of pupil shear to eliminate a possible redundancy in the alignment algorithms Cooler Heat Loads Margins -End to end review of current margin in all areas Electrical Power budget for mission - more power to the Cooler ;-) (among many changes) Test Plans and Verification at Observatory Level Really big focus across the board on pushing every schedule in order to get the Observatory (FM) into end-end cryo-test as soon as possible.

4 MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September 2008 4 Operations Progress and Planning (wrt MIRI) MIRI Proposal Planning System Template Definitions -Draft specifications are in work Cross Instrument Calibration Working Group Set up -Karl Gordon is MIRI member, looking for commonalities between instruments (dark current subtraction). Operations Script Development is making good progress -Plan to test at RAL at the end of VM2

5 MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September 2008 5 JWST Science Working Group Activities A specialist working group has been set up to consider how we can best observe planetary transits -Identify if special observatory modes are needed. A study is on-going to write a paper explaining the impact to science if the telescope image quality specification were to be relaxed (eg diffraction limited at 3um) -Very bad impacts for NIRCAM and NIRSPEC sensitivity -At the moment this is a “just in case” activity -In case the mirror cryo-polish cycles are too difficult (impossible) -There is no mission plan to actually do this. Plan is to make a serious announcement to community of process for selecting first observations at the AAS meeting in January 2009.

6 MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September 2008 6 Partners Workshop

7 MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September 2008 7 Partners Workshop, ITAR Free Day, Monday 13 th October Hosted by NIRSPEC in Munich, 9am- 5:30pm Program Progress & Status (Durning) JWST Science Objectives (Greenhouse) JWST Mission Overview, Observatory Overview and Mission PDR Summary (Menzel & Arenberg) OTE and Mirror Status (Feinberg & Texter) ISIM Overview (Dunn) LUNCH ISIM Electronics Compartment (Rashford) Instrument Status : NIRCAM, NIRSPEC, FGS-TF, MIRI, Cooler Observatory Verification (Lynch & Arenberg) Integration and Launch Campaign Flow (Diaz & Jones) Ground Segment & Operations(Johns & Sonneborn) Public Lecture in Deutsches Museum, and full scale model viewing in evening We need to get GSFC a list of MIRI participants by end of this week

8 MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September 2008 8 Other Sessions of Interest to MIRI MIRI Science Team Meeting, Tuesday Morning -Co-PI splinter will discuss Wed, 15 th Mostly ITAR restricted technical discussions -Variouis Optical Alignment and Test working groups -Martyn, Maurice, will be there see also Martyns talk -Science Instrument Coordination with Observatory V&V team -PIs have been invited, likely to be followed by working groups and telecons -Cooler Heat Load Margins -Paul will be there, (& ESA) see also in Bryans talk -Various management discussions -SITS spares for FM testing for example Thurs, 16 th - more ITAR ! -ISIM Integration and Test, and in particular Operations products and Data storage during test -We want STScI archive in place and useable in time !!!!


Download ppt "MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September 2008 1 JWST Status."

Similar presentations


Ads by Google