Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS-470 23 April 2015 Flight Standards Update.

Slides:



Advertisements
Similar presentations
Presented to: By: Date: Federal Aviation Administration Safety Management System (SMS) at Airports : Principles APEC TPT-WG AEG-SAF Jim White, Deputy Director.
Advertisements

Federal Aviation Administration Performance Based Communication and Surveillance (PBCS) Data Link Operational Authorization Process Date:13-14 May 2013.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
PAGE Quick Guide to the FedRAMP Readiness Process 1 August 2014 Presented by: FedRAMP PMO
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
Presented to: By: Date: Federal Aviation Administration PASSENGER FACILITY CHARGE PROGRAM UPDATE 29 TH Annual Airports Conference Sheryl Scarborough, FAA.
General Authority of Civil Aviation 1 Air Carriers & Operators In Saudi Arabia Saudi Arabia has made a decision to liberalize the Civil Aviation Market.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Matt Maki / DCL Trials Lead.
Hershey Conference March 2008 Federal Aviation Administration 0 Hershey Conference March 2008 Federal Aviation Administration 0 Conducting Studies For.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
AUDITS Process and Corrective Actions OIG RolesGAO ROLES – OIG –OIG Lead Auditor –OCFO – owner of MATS and Agency Audit Process –OEI AA – Designated OEI.
Presented to: By: Date: Federal Aviation Administration Transition to RNP 4/10 (MNPS to PBN) OSWG Gordy Rother and Kevin Kelley 10/8/2014 North Atlantic.
Economic Authority & Insurance Management System.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
FAA ICAO ANNEX 6 PROPOSAL & OVERSIGHT ISSUES IN DISPATCH
Presented by: Date: Federal Aviation Administration FAA Flight Standards: Weather in the Cockpit Guidance and Policy Roger Sultan AFS-430 December 18,
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Processes Timeline Tracey Gibson CGH Technologies, Inc.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
Federal Aviation Administration (FAA) Presented by Jim Gardner, AFS-200 Proposed Amendment To Annex 6, Part I International Commercial Transport – Aeroplanes.
Electronic Flight Bag (EFB)
Data Link Communications
Certificate of Need Online Application/Management System Joint Provider/Surveyor Training March 27, 2008 Michigan Department of Community Health.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT23 Update To:DCIT23 Plenary From: Matt Maki Date:
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Federal Aviation Administration SMS Update National Air Carrier Association Safety/Security Council December 12, 2012.
Presented by: Roger Sultan, FAA, AFS-400 Date: August 8, 2012 Federal Aviation Administration FPAW Summer 2012 RVR/Prevailing Visibility Conversion and.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Cargo Strategic Action Plan Prepared by: Cargo Strategic Action Group Air Carrier Maintenance Branch, AFS-330.
UPDATING RIGHT OF WAY MANUALS FLORIDA’S PROCEDURES.
Presented to: By: Date: Federal Aviation Administration NPS Data Collection for Congressional Mandate OpSpec B057- NATONAL PARK FLIGHT OPERATIONS DATA.
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
Presented to: By: Date: Federal Aviation Administration DCIT 44 Mark Patterson, FAA, AFS Nov 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT 37 Plenary Agenda December 10, 2014 Harris Corp Washington, DC.
Presented by: Date: Federal Aviation Administration FAA Weather in the Cockpit Guidance and Policy Roger Sultan AFS-430 July 22, 2014.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Federal Aviation Administration Subscriber Database (SDB) and Web Access To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 3/13/13.
Presented by: Roger Sultan, FAA, AFS-430 Date: October 11, 2011 Federal Aviation Administration FPAW 2011 AC Rewrite Plan.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Domain Champion Updates New Mexico Department of Health.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date:
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
Federal Aviation Administration Presented to: OSWG Presented by: Chris Hope Date: March 9, 2016 ILS Performance Classification OpSpec C061.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #32 PLENARY DCL Trials.
Presented to: ICAS By: FAA – Sue Gardner DND – Bruce Ehmann TCCA – Wayne Harper Date: December 12, 2012 Federal Aviation Administration Version 0.9d DND.
AFTERMATH AND ACTIONS TAKEN On 20 October 2004, the Transportation Safety Board of Canada issued Safety Advisory A (Verification of Cargo Weights)
Performance Based Communication and Surveillance (PBCS)
Working in Groups in Canvas
Global Grid Forum GridForge
Flight Standards Update
Data Communications Implementation Team (DCIT)
USOAP Continuous Monitoring Approach (CMA) Workshop
Oceanic and International Operations
Workshop for Licensing and Operations
Outreach & Communications Committee Task Force Update
May 2018 HSAC.
Presentation transcript:

Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update

Federal Aviation Administration AC C 17 March - posted for public comment 16 April - comments due (87 comments rcvd) April - adjudicating comments (depends on number of comments and complexity) 27 April – changes to tech writer (planned) Then - time needed to: –Approve tech writer changes –Additional coordination depending on changes –Management approval to publish Expected publish date – JUNE 2

Federal Aviation Administration N8900.A056 & A056 templates 17 March - entered formal coord (FAST TRACK) 3 April - comments due (missing responses) 13 April - received all comments April - adjudicated comments 16 April - changes to tech writers 23 April - final version rcvd - needs approval 14 May - tentative publish date Schedule allows operators/inspectors: ~ 12 wks prior to SLC IOC ~ 16 wks prior to IAH IOC 3

Federal Aviation Administration Part 129 (foreign carriers) AFS-50 (int’l) has lead Operators request authorization from POI / IFO Will not require a separate A056 OpSpec Authorization annotated on their A003 Operators required to have CAA data link approval / authorization prior to FAA authorization 4

Federal Aviation Administration N8900.A003 & A003 template 16 April - entered formal coordination 21 April - comments due (AFS-1 priority) April - adjudicate comments (time depends on number/complexity of comments) 28 April - changes back to tech writers (planned) TBD - tentative publish date A back-up plan has been approved if documents get delayed in coordination and/or publishing process 5

Federal Aviation Administration Part 129 (foreign carrier) actions (proposed) Provide responsible IFO with evidence State of the Operator approved them for data comm ops Approval must include: A statement from the State of the Operator’s CAA showing: –the foreign air carrier is approved for data link communication in accordance with XXXX (ex. ICAO GOLD) criteria –the aircraft and aircraft equipment are eligible and approved for data link communication –the flight crews are trained to conduct data link communication Approved data link system make and model (M/M) Each Aircraft M/M/S Procedures for using data link communication Any other pertinent information 6

Federal Aviation Administration Part 129 (foreign carrier) actions (proposed) After POI and PAI agree they have CAA authorization and they are eligible for data link ops in the NAS Issue a revised A003 7

Federal Aviation Administration Questions? 8

Federal Aviation Administration Food for thought (as of 23 April 2015) Operators with FAA A056 = 486 Part 121 (U.S. Carriers) = 11 (varying fleets) DCIT participants = 5 Part 129 (Foreign Carriers) = 0 (no need) Parts 91K / 125 / 125M / 135 = 39 Part 91 (A056 not needed for CPDLC-DCL) = 436 Applications currently being evaluated = 60 9

Federal Aviation Administration

Federal Aviation Administration A056 Snapshot (as of 23 April 2015) DCIT operator A056 application status Opr A – waiting for Load 12 before adding B737 to A056 Opr B – contact with POI, no application submitted to add B737 to A056 Opr C – contact with POI, intent letter submitted for initial A056, full application not submitted High risk of these applications not being approved prior to IOC 11

Federal Aviation Administration So… What is Flight Standards doing to reach those 475 (and growing) operators that are not DCIT participants? Besides the many briefs we’ve given (GAMA, NBAA, NACA, OSWG, etc)… 12

Federal Aviation Administration Information for Operators (InFO) InFO (Information for Operators) AFS tool to get information to all operators in FAA database –Hi-level explanation of the CPDLC-DCL service –Will provide a general game plan (waterfall / IOC timeline) –Show where to find more information (AFS-470 web site) Prior to publishing, I need: –Flight Deck User’s Guide finalized (ops system) –DCIT avionics configurations recommendations –Lessons-learned document –ACF decision (charting options, airport pubs, etc) –Dispatch docs (ISD/CRD/SDB, end-to-end, etc) 13

Federal Aviation Administration 14