Comprehensive Operations Analysis LYNX 2013 Comprehensive Operational Analysis John Lewis, CEO.

Slides:



Advertisements
Similar presentations
Blueprint for Transportation Excellence Downtown CAG January 16, 2014.
Advertisements

Mid Ohio Development Exchange (MODE) Presentation January 16, 2014.
Data Collection Methods BluFax: vehicle identification using bluetooth MAC addresses – provides corridor traffic patterns (origin-destination data) and.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
MUNI Operations Overview and Recent Innovations Julie Kirschbaum San Francisco Municipal Transportation Agency, Operations Planning and Scheduling Manager.
1 October 12, 2012 December 5, Light Rail Efficiency Projects Board Adopted LRT Improvement Plan May 2010 Speed up system, open new markets, improve.
I-35W and 46 th Street Station Concept Service Plan Planning for the Future – BRT 46 th St Station Concept Plan Public Input.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
Agenda Final Modal Assignments Prioritization Supporting Network Financial Analysis.
Community Transit Solutions for the Suburbs APTA Annual Meeting September 30, 2013.
I-35W and 46 th Street Station Concept Service Plan and Construction John Dillery & Mac Sweidan Kingfield Neighborhood Association June 2010.
Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner.
New Shuttle Routes. Current Health Sciences Shuttles – Four (4) different primary routes with excessive stops – A few single purpose routes – “Concierge”
Cheryl Thole, Jennifer Flynn CUTR/NBRTI, Senior Research Associates Transit in GIS Conference September 14, 2011 St. Petersburg, Florida.
Short Range Transit Improvement Plan CITY OF HIGHPOINT Sounding Board Meeting Service Recommendations September 9, 2014.
Bus Stop Design Guidelines - In Support of Effective Service Planning
1 Example of How Bus Stop Inventory is Used and Issues are Addressed.
I-35W and 46 th Street Station Concept Service Plan Planning for the Future – BRT 46 th St Station Concept Plan Public Input.
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
COTA Major Initiatives Ohio Planning Conference July 16, 2014.
Baltimore County Public Schools Office of Transportation.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
LYNX FY2010 Budget Presentation Orange County Board of County Commissioners Linda S. Watson LYNX Chief Executive Officer July 22, 2009.
Welcome to the TSIP Project Webinar Planning Technical Working Group 28 July – 3:30 pm.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Service Planning & Standards Unit 4: Service Planning & Network Design.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
Intelligent Transportation System (ITS) Project Update TAC - July 21, 2015 Nick Perfili, FCDOT Department of Transportation.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
I-35W and 46 th Street Final Service Restructuring Plan.
Night Ride Update Industry Meeting June 28, 2012.
The Transit “T” Craig Lamothe UPA Transit Project Manager City of Minneapolis City of Lakes Innovative Choices for Congestion Relief.
Business Logistics 420 Public Transportation Lecture 23: Transit System Performance Evaluation.
LYNX FY2013 Budget Presentation Orange County Board of County Commissioners John M. Lewis, Jr. LYNX Chief Executive Officer July 17, 2012.
DC Circulator Transit Development Plan TPB Access for All Advisory Committee October 28, 2010.
LYNX FY2016 Budget Presentation
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
Siskiyou County Short Range Transit Plan Draft Final Report Presentation to the Steering Committee LSC Transportation Consultants.
Rod Weis, Texas A&M University Lana Wolken, Texas A&M University Joe Richmond, University of North Texas Operating Your Own System Versus Contracting.
Transport.tamu.edu Fall 2016 Proposed Route Changes.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Transport.tamu.edu TAMING WILD BRONCOS Transit Management Changes, Financing, Training, Staffing Rod Weis, Texas A&M University Lana Wolken, Texas A&M.
Gastonia Transit Expansion Study City Council/Planning Commission Joint Transportation Workshop September 13, 2007.
Orange County Budget Presentation Linda S. Watson Chief Executive Officer LYNX.
Placer County Rural Transit Study Expanding Public Transit Service for Rural Placer County.
Increasing Success & Credibility of Your Service Through End-User Involvement.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Service Guidelines and Standards Capital Metropolitan Transportation Authority Board of Directors Meeting September 2015 capmetro.org |1.
Comprehensive Operational Analysis (COA) Collier Area Transit February 8, 2012 Report Findings and Recommendation s.
Transportation Fee FY2016 January 16, Services Provided by Transportation Stinger Buses - Three routes with 10 buses operating weekdays and two.
Indianapolis Public Public Hearing – Proposed 2014 Budget Thursday, August 15, 2013 Transportation Corporation.
Service Development Process 1. Our mission: To meet our constituents’ present and future public transit needs by offering safe, clean, reliable, courteous,
TRANSIT FEASIBILITY STUDY RECOMMENDATIONS AND SERVICE OPTIONS JUNE 14, 2016.
Integrating Transit and Highway Solutions In High Volume Corridors
Comprehensive Route Network Analysis
Gunnison Valley Transportation Authority (RTA) 2016 Transit Planning Process Funded through a Section 5304 Planning Grant 5/23/2018.
Service Routes and Community Transit Hubs: Right Sizing Transit
Comprehensive Operational Analysis (COA)
Proposed Service Changes
Annual Operating & Capital Budget
Annual Operating & Capital Budget
Reimagine RTS Public Hearing
Draft Fiscal Year Bus Service Plan
Capital Trade-Offs Evaluated three major capital expenditure scenarios
HRT Workshop: Transit Strategic Plan and Aug-Dec working items
Presentation transcript:

Comprehensive Operations Analysis LYNX 2013 Comprehensive Operational Analysis John Lewis, CEO

Record Breaking Ridership 30+ million trips Budget: $121,074,870 Employees:1,056 Services:  Fixed Route  NeighborLink  Access LYNX  LYMMO  Xpress  FastLink  KnightLYNX  Vanpool  Road Rangers 2% Increase in Ridership System-wide Top 10 Routes by Ridership (system- wide) Link 8 – W. Oakridge/I-Drive Link 4 – U.S. 441/Florida Mall (now 107/108) Link 41 – SR 436 Crosstown Link 37 – Pine Hills/Florida Mall Link 21 – Universal Studios Link 42 – I-Drive/OIA Link 50 – Downtown Orl/Magic Kingdom Link 125 – Silver Star Rd Crosstown Link 102 – Orange Ave/S Link 17 – N. U.S. 441/Apopka (now 106)

2013

Develop a tool for decision making Evaluate effectiveness of existing routes Identify opportunities to improve system efficiency Provide recommendations to strengthen and grow the system

Service Guidelines Economic and Productivity Farebox Recovery Passengers per Vehicle Hour and Mile Ratio of Non-Revenue to Revenue Miles Service Delivery On-Time Performance Average Speed Trips Operated and Trips Completed Passenger Complaints Bus Stop Amenities Route Design Fixed Route Spacing Bus Stop Spacing Service to Park & Rides Directness of Route Schedule Design Service Frequency Policy Headway Addressing “Plug Buses” Span of Service Wait time

COA Recommendations System Wide  Strengthen system by increasing frequencies on well used routes  Improve communication through maps, schedules and real time info  Expand service offerings – Express, BRT  Real Time Info on key routes Orange County  Pine Hills: Restructure routes or replace SuperStop  Improve reliability by increasing frequencies and spans of service  Develop new routes to serve major underserved corridors

COA Recommendations LinksDescriptionEst. 1 st Year Cost 9, 37, 44, 48, 49, 443Restructure Pine Hills Routes$2,408,797 8Double frequency 7-11 a.m. outbound$1,116,522 8Double frequency 1-5 p.m. inbound$1,116,522 8, 42Truncate 8 at Destination Pkwy; extend 42(1,164,181) 41 (436N, 436S)Add trip in morning$177, (436N, 436S)Improve frequency westbound$177,635 37Increase frequency southbound in a.m. Increase frequency northbound in p.m. $204,103 21Extend route to Walt Disney World$1,168, , 1, 14Restructure to more directly connect Silver Star and Downtown Orlando (53,723) 42Improve frequency$671, Improve frequency to 15 minutes all day$1,412,407 48Improve frequency eastbound in a.m.$208,836 18Add trip in a.m.$21,116 15, 29, new routeGoldenrod package$1,552,324 40Add trip in a.m.$36,773 13Improve frequency outbound in a.m.$273,288 51Add trip in a.m.$62, Extend to Walt Disney World$2,112,012

Action Requested  Board direction regarding utilization of the additional funding ($500,000) proposed for LYNX.