46 cm 1.8 cm 13.5 40.5cm 35.5cm 21.5cm 10 cm 4.5 cm 18.5 cm 32.5cm 26 cm.

Slides:



Advertisements
Similar presentations
E-Flex Easy Flexitank EC41
Advertisements

INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Enhancing the transportation surveillance Andrea Sorri.
RISER SETUP NOTE: All levels of the riser are connected using the same method:
Zone 1 & 21 Universal Access Point Enclosure System I Copyright Extronics Ltd Zone1 & 21 Universal Access Point Enclosure System.
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
Handy Store Fixtures Gondola Dolly Assembly Instructions
The Problems with Long Bolt Flanges in process pipe connections when exposed to a fire!!
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
The Connector Board The best way to get in... or out!
Background - To date there are no other products designed to connect two wheelchairs together for steering Initial Thoughts External features are easier.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Capítulo 10 Instalaciones básicas programadas Instalaciones eléctricas interiores.
TP4-ENERSOL-TD/PV double function
Dell Venue 7 & 8 Android Tablet. Agenda Know Your Tablet Do’s & Don’ts Insertion of Sim/Charging Devices/Power ON & OFF Basic Troubleshooting Install.
Setup Open Broadcaster Mixing Hymns for Stake Conference Salem West Stake 2015.
Design for Elderly and Disabled Environments: Making Homes More Comfortable and Accessible Closets Part 7 of 10.
ActEyes IP Cam Training Part 1: Camera Setup. Network Setup Overview Each IP Cam on the network will need its own IP address to be assigned. This address.
U81X0 Downloading Tool Manual 1 ( Version 1.2 ) FlashRW For U81X0 Version 4.0.0(Build #95V) February 2004 LG Electronics Inc.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
1 © 2006 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID Scientific Atlanta Configuration Module 2.3.
S. Lusin, T1 ESR, CERN 17 Sep 101 Totem T1 ESR 17 Sep 10 S. Lusin Observations from Electrical Inspection of T1.
Moment Connection Requires Bolts Outside the Flanges
Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.
ACM-1231 / ACM-1431 Product Enhancement Notice. Introduction ACTi is not only releasing new models with better design and specifications, but also keep.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
P4 – installing hardware By Ridjauhn Ryan. Installing the scanner Before you install the Scanner you must first check to make sure that the Scanner Cable.
Experts in Chem-Feed and Water Treatment Old style ORP and pH sensors. The exposed red sensor is an ORP sensor. This connecter predates the connector to.
MACHINE GUARDING 29 CFR to
U81X0 Downloading Tool Manual 1 ( Version 2.0) FlashRW For U81X0 Version 4.0.0(Build #100V) April 2004 LG Electronics Inc.
CMP at Tufts Dan Apone. Issue #1 Cameras had had enough Random dots on images So old that to fix them would require all new internals New cameras researched.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the DVT CON-IOE. Intellect 1.0 is used for the software portion.
Copyright ©2014 , JAE Electronics, Inc. Confidential DW Series Overview JAE May 2014 Battery Connectors for Power Storage.
Design for the Elderly and Disabled Environments: Interior Floors Part 9 of 10 Making Homes More Comfortable and Accessible.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Happy New Year! Click to Add Subtitle Sanj.pro. Click to add title Replace text. This is a place holder. Sanj.pro.
Status 1 5/07/08 UCB RBSP EFW STATUS 5/07/08. Status 2 5/07/08 UCB Agenda Project Stuff Monthly Report Submitted Schedule Submitted  Milestones Upcoming.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
BlueROV Electrical Block Diagram Pressure Enclosure
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
SSD Conversion Kit TS-CK3. SATA data cable PH2 screwdriver Mounting screws USB to SATA adpter 3.5-Inch mounting bracket Spacer Conversion Kit For All.
CCTV INSTALLATION SERVICES DUBAI
Temporary Works – P8 Project Practice.
Date of download: 10/29/2017 Copyright © ASME. All rights reserved.
Installation step 4. (3 days)
continued on next slide
AU Media/ER/Toyota/Tech/Gen 7/06 Toyota Tundra
How to Download, Install, and Update AVG Antivirus?
Canon Ijsetup is the best and more popular across the globe. More than other printer of the system users are installed & download canon printerr in their system. According to the users increase, support will help to their users or t
T400 Motor Replacement.
                                                                                                                                                                                                                                                
continued on next slide
continued on next slide
Tagger Microscope Mounting, Shielding & Cooling
זכויות סוציאליות.
A B C TOWER BLOCK TOOL KIT BLOCK TOWER TOOL KIT
How to install App from Google Play
A part is to be placed on a mandrel
Adding and Subtracting Fractions
Reader Swap out Guide.
Document Camera Setup Instructions
ISO view of pipe w/ individual EC detector installed
12cm Area 64cm2 Area 100cm2 ? ? Area ?cm2 12cm Area 36cm2
continued on next slide
12cm Area 64cm2 Area 100cm2 ? ? Area ?cm2 12cm Area 36cm2
By: David Mitchem, Matt Moffit
continued on next slide
Presentation transcript:

46 cm 1.8 cm cm 35.5cm 21.5cm 10 cm 4.5 cm 18.5 cm 32.5cm 26 cm

53 cm 35 cm 18 cm 16 cm 58 cm

50 cm 38 cm 19 cm 10 cm

Concern 1: (1) Fix the base framework to ensure that the camera enclosure is well attached to the base; (2) Add an “L” end in the base framework to keep the camera enclosure from sliding when Installed (3) Determine what is the optimal size for this base framework

Concern 2: the strength of the mobile part, both material and the connector with other part Concern 3: add the steal cable to the upper bar of the gondola system Concern 4: the upper bar must be removable to give access to the interior enclosure Concern 5: to eliminate the sharp edges Concern 6: to replace the bolts with a rugged type of weld (not a priority though)

Concern 7: because of item (4) we need to lengthen the main bar in a couple inches (the case does not need to be completely open to give access to the interior enclosure.) Concern 8: connector and power? Concern 9: material and strength Concern 10: waterproof ethernet connector

How many power we need, and where we can get, and through which way A diagram to show the basic set-up for the whole camera system in the tower: (1)Safety part (2)Reference for camera (3)Camera system Data download? Other sensor? Time schedule?