ECE 477 Design Review Team 8(SLOW)  Spring 2006.

Slides:



Advertisements
Similar presentations
ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
Advertisements

ECE 477 Design Review Team 13  Spring 2006 Elmer Chao (not pictured), Matt Cozza (not pictured), Joe Waugh (not pictured), Evan Zelkowitz (not pictured)
ECE 477 Design Review Team 22  Txt Msg DJ Garrett Strzelecki Kyle Brown John Doherty Chris McCabe K.
ECE 477 Design Review Team 15  Spring 2013 Jackson McCormick, Andrew Batek, Carey Woolet, Justin Lindley.
ECE 477 Design Review Team 01  Fall 2012 Brennan Tran Jonah Ea Ben Pluckebaum Kevin Meyer.
Twitch Plays ECE477 ECE 477 Design Review Team 1 − Spring 2015 Hannan Harlan Root Tornquist.
ECE 477 DESIGN REVIEW TEAM 7  SPRING 2013 COST ROBOT CAROLINE TRIPPEL, ANDREW LOVELESS, ERIC OSBORNE, BRYAN DALLAS.
ECE 477 Design Review Team 13  Spring 2008 Paste a photo of team members here, annotated with names of team members. Srichand Varun Madhu Anvesh.
ECE 477 Design Review Team 7  Spring 2011 Paste a photo of team members here, annotated with names of team members. Stuart Pulliam Will Granger Linda.
ECE 477 Design Review Group 9  Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors.
ECE 477 Design Review Group 1  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 10  Spring 2012 Paste a photo of team members here, annotated with names of team members. Nathan Irvin Will Bouchonnet Allen.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 Design Review – Spring 2010 Team 15. Team Members.
ECE 477 Design Review Team 6  Spring 2011 Left to right: Kirk Iler, Brian Bentz, Stephen Wolf, Fuhe Xu.
ECE 477 Design Review Team 8  Spring 2008 Mike Cianciarulo, Josh Wildey, Robert Toepfer, Trent Nelson.
ECE 477 Design Review Team 1  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 4  Spring 2008 Zach Dicklin Amy Ritter Ian Bacon Eric Yee.
ECE 477 Design Review Group 11  Spring 2005 Paul Dulle Pat McLaughlin Randy Scheifele Chad Bjorklund David Meyer.
Xin Jin Zelun Tie Ranmin Chen Hang Xie. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Team 2  Spring 2010 Digi-Brush Josh LongCaleb Ayew-ewKatie Schremser.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
Solar Telematics System ECE 477 Design Review, Team 8, Spring 2012 Paste a photo of team members here, annotated with names of team members. Craig Lechlitner,
ECE 477 Design Review Team 5  Fall 2007 Wes Chris Josh Dave.
 Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design  Schematic and theory of operation.
ECE 477 DESIGN REVIEW TEAM 2  FALL 2011 Members: Bo Yuan, Yimin Xiao, Yang Yang, Jintao Zhang.
Shiv Yukeun Donghan Robert.  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
ECE 477 Design Review Group 7  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE Grande ECE 477 Design Review Team 3 - Fall 2008.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
Component Selection Rationale Microcontroller : Freescale MC9S12NE64CPV – 112 pins (70 I/O pins, 10 input only) – Built in Ethernet controller – ATD (for.
ECE 477 Design Review Team 01  Fall 2010 Jigar Gandhi Chandler Wall John-Taylor Smith Eric Zarowny.
ECE 477 Design Review Team 2  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Group 2  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Group 11  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
Team Foreigner (Group 11) “Cold as Ice” Smart Refrigerator Midterm Design Review.
ECE 477 Design Review Team 5  Fall 2009 Ben Carter – Jacqui Dickerson – Ian Oliver – Dennis Lee.
ECE 477 Design Review Team 9  Fall 2009 Josh Piron, Jacob Pfister Kevin Templar, Mike Phillips,
ECE 477 Design Review Team 2  Spring 2006 Prashant Grimella Andy Brezinsky Tim Sendgikoski Clark Malmgren.
ECE 477 Design Review Team 4  Fall 2006 Daryl Dave Will Ben.
ECE 477 Design Review Team 1  Fall 2006 Sumanth Peddamatham Alex Tucker Chris Arges Radhika Mulani.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
ECE 477 Design Review Team 02  Fall Outline Project overview - KProject overview - K Project-specific success criteria -KProject-specific success.
ECE 477 Design Review Team 3  Fall 2007 Steven Kingsley (Analog) Roy Scheck (Leader) Tony Liechty (Digital) Charles Lan (Software)
ECE 477 Design Review Team 10  Spring 2007 JUSTIN AZAD AFIFF NUHAIRIADAM.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 DESIGN REVIEW FEST – FALL OUTLINE  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Team 7  Spring 2008 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 3  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 12  Spring 2006 EricDaniel Atandra Sriharsha Aasenda Silva Burman Vengapaty.
ECE 477 Design Review Team 4  Spring 2006 Justin Thacker, Matt Kocsis, Ian Snyder, Dustin Poe.
Colin Graber Jason Kohl Jacob Varnau Cameron Young ECE 477 Design Review Team 2 - Spring 2015 R.I.S.K.
Eric Tarun Craig Dave ECE 477 Design Review Team 9  Spring 2006 Galamback Chawla Noble Kristof.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
ECE 477 Design Review Group 9  Fall 2005 Paste a photo of team members here, annotated with names of team members. Tim Miller Clif Barnes Drew Heinrich.
ECE 477 Design Review Team 5  Fall 2009 Ben Carter – Jacqui Dickerson – Ian Oliver – Dennis Lee.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Design Review.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 Design Review Team 2  Fall 2006 Wirelessly Integrated Menu System (WIMS) Ryan Coppa Lee Bush Aaron Replogle Neil Bedwell.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
ECE 477 Design Review Team BOAR  Fall 2011 Paste a photo of team members here, annotated with names of team members. Left to Right:
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Group 3  Spring 2005 “VoIP Connect” Ankur TrushalAshish Dushyant.
ECE 477 Design Review Team 21 - Spring 2013
ECE 477 Design Review Team 14  Spring 2012
ECE 477 Design Review Team 5  Fall 2006
ECE 477 Design Review Team ??  Fall 2012
Presentation transcript:

ECE 477 Design Review Team 8(SLOW)  Spring 2006

Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria Block diagramBlock diagram Component selection rationaleComponent selection rationale Packaging designPackaging design Schematic and theory of operationSchematic and theory of operation PCB layoutPCB layout Software design/development statusSoftware design/development status Project completion timelineProject completion timeline Questions / discussionQuestions / discussion

Project Overview Designing an LED panel by cascading 10 5x7 LED dot matrices.Designing an LED panel by cascading 10 5x7 LED dot matrices. A built in embedded server on the microcontroller to edit/display text messages on the LED panel via a website.A built in embedded server on the microcontroller to edit/display text messages on the LED panel via a website. Scrolling feature to display long text messages.Scrolling feature to display long text messages. Allows users to display the outdoor temperature using a temperature sensor.Allows users to display the outdoor temperature using a temperature sensor. Display current time using a highly accurate internal clock.Display current time using a highly accurate internal clock.

Project-Specific Success Criteria Ability to display ASCII character strings on an LED matrix.Ability to display ASCII character strings on an LED matrix. Ability to save messages and configuration data in non-volatile memory.Ability to save messages and configuration data in non-volatile memory. Ability to measure and display the outdoor temperature.Ability to measure and display the outdoor temperature. Ability to display the current time (based on highly accurate internal clock).Ability to display the current time (based on highly accurate internal clock). Ability to configure display and edit messages via an embedded server.Ability to configure display and edit messages via an embedded server.

SLOW Block Diagram

Component Selection Rationale Microcontroller : Must have a timer module for the clock, a ATD port for the temperature sensor, built in ethernet controller, PWM module. Choices : Choices : Freescale MC9S12NE64CPV -80 pin package, 38 I/O pins and 10 input only -64K of FLASH memory -ATD ports -Timer Module -A IEEE compliant ethernet controller Rabbit RCM I/O pins -Built in Ethernet Controller -512K of FLASH memory We decided with the MC9S12NE64CPV as it has a low cost, easily attainable and has a enough number of input output pins. Also, the MC9S12NE64CPV has good documentation as compared to the Rabbit microcontroller.

Component Selection Rationale LED Driver Toshiba TB62708 with a 16 bit shift register and latching ability -Low cost -Programmable Output current from 5mA to 90mA -Current sourcing device We required a 12 bit shift register for our design but we could only find current sinking ones. ULN2003A Darlington Array -16 Bit package -Sinks upto 500mA of current( our sink current came upto 105mA) -Recommended by our TA Brian as used by him for one of his LED projects RJ45 Jack -Recommended by the microcontroller data sheet

Packaging Design Considerations : LED’s panel is big enough and can be seen from a distance of up to 30 feet.LED’s panel is big enough and can be seen from a distance of up to 30 feet. Aluminum CaseAluminum Case Weight estimation : around 3.4 lbs and mountable on a wall.Weight estimation : around 3.4 lbs and mountable on a wall. Dimension is 17” x 4” x 3”Dimension is 17” x 4” x 3”

Packaging Design – 3D view

Packaging Design – Front

Packaging Design - Bottom

Schematic/Theory of Operation

Total Parts : 88Total Parts : Capacitors 2 Diodes 25 Resistors 3 Switches 1 crystal 10 LED drivers 10 Darlington transistors 2 Inductors 10 LED displays 1 Microcontroller 2 Power Regulators 1 RJ-45 1 BDM 1 Header 1 Temperature Sensor 1 12V Power Adapter Schematic/Theory of Operation

PCB Layout – Whole Layout

PCB Layout – Top Layer

PCB Layout – Bottom Layer

PCB Layout - Microcontroller

PCB Layout – Power

PCB Layout – Shift Register and transistors

PCB Layout – RJ45

Software Design/Development Status –All programming and decoding will be done on the Microcontroller – Even without the PCB, MC9S12NE64 Development board can be used to write code and test our components. – LED matrices are driven by column therefore making it possible to control text scrolling.

Project Completion Timeline Week 8 (This week) – Finalize PCB / Design ReviewWeek 8 (This week) – Finalize PCB / Design Review Week 9 – Start Software Development / Final PCB ModificationWeek 9 – Start Software Development / Final PCB Modification Week 10 – Testing hardware / Continue Software DevelopmentWeek 10 – Testing hardware / Continue Software Development Week 11 – Continue Software Development / Testing PCB FunctionalityWeek 11 – Continue Software Development / Testing PCB Functionality Week 12 – Finalize Software / DebuggingWeek 12 – Finalize Software / Debugging Week 13 – Packaging / Testing / DebuggingWeek 13 – Packaging / Testing / Debugging Week 14 – Final TweakingWeek 14 – Final Tweaking Week 15 – Documentation / Prepare for Final PresentationWeek 15 – Documentation / Prepare for Final Presentation Week 16 – Final PresentationWeek 16 – Final Presentation

Questions / Discussion