California Integrated Waste Management Board 1 Consideration Of Applicant Eligibility, Project Eligibility & Evaluation Process for the Tire-Derived Product.

Slides:



Advertisements
Similar presentations
California Integrated Waste Management Board November 2009 Agenda Item 12 Discussion Of Waste Tire Market Development Program Evaluation.
Advertisements

California Integrated Waste Management Board 1 Agenda Item 5 (Committee Item F) September 8, 2008 Agenda Item 5 (Committee Item F) September 8, 2008 Consideration.
California Integrated Waste Management Board 1 May 9, 2007 Committee Item N Board Item 23 Consideration Of Grant Awards And Scopes Of Work And Contractors.
California Integrated Waste Management Board 1 Consideration Of Approval Of Allocations For Contract Concepts From The RMDZ Revolving Loan Account For.
E-rate Audits/Reviews Be prepared!! Prepared by Judy Jones, State Library of Iowa.
Agenda Item 46 Consideration Of Augmentation For The Environmental Services Contract For Landfill And Disposal Site Remediation (IWM-C0106A) California.
Consideration of Contractors for the Engineering Services Contracts for Landfill and Disposal Site Remediation (Solid Waste Disposal Site Cleanup Trust.
California Integrated Waste Management Board 1 Agenda Item 14 Consideration of Streamlining Grant Processes to Enhance Program Efficiency January 17, 2006.
Race to the Top (RTTT) Overview of Grant Competition Goals and Requirements 1.
CONSIDERATION OF STREAMLINED PROCESS FOR STIPULATED WASTE TIRE HAULER AND WASTE TIRE FACILTY ADMINISTRATIVE PENALTY CASES CIWMB Board Meeting Agenda Item.
SFY 2015 Capital Improvement Grant Opportunity Cayla Lewis, KAMU CRO.
Workshops on Discussion Draft of Guidelines December 2014.
California Integrated Waste Management Board November 10, 2008 Item #2 Discussion And Request For Direction Regarding The Board's Fulfillment Of The Requirements.
Memorandum of Understanding to Develop A Nationally Coordinated Leftover Paint Management System California Integrated Waste Management Board - December.
California Integrated Waste Management Board Consideration Of Scope Of Work, Contractor, And Augmentation Of Contract Allocation For The At-Store Recycling.
2008 California Scrap Tires Market Report August 2009 Copyright © 2009 by R. W. Beck, Inc. All Rights Reserved. California Integrated Waste Management.
California Integrated Waste Management Board 1 Permitting and Compliance Committee Meeting Agenda Item 18 Sue Ingle June 04, 2007.
California Integrated Waste Management Board 1 Strategic Policy Development Committee Workshop Discussion of Draft Biennial Update of the Five-Year Plan.
California Integrated Waste Management Board 1 California Integrated Waste Management Board Meeting Agenda Item 1 Michael Leaon November.
California Integrated Waste Management Board Board Meeting June 16, 2009 Item #8 Consideration Of Adoption Of The Recommendations To The Legislature In.
California Integrated Waste Management Board Tire Flow Study Along the California-Mexico Border Region Special Waste Committee Meeting California Integrated.
Grants Assistance Unit. Ted Nelson, Director (213) Ronice White, Administrative Analyst (213)
STAKEHOLDER CALL/MEETING TO DISCUSS AND PROVIDE INPUT ON ZEV INCENTIVE PROGRAM GUIDELINES CALIFORNIA AIR RESOURCES BOARD March 7,
California Integrated Waste Management Board Update On Long-Term Postclosure Maintenance And Corrective Action Financial Assurances Activities Permitting.
Consideration Of Scope Of Work And Agreement To Conduct Tire Forums FY 2005/2006 December 7, 2005 Victoria Rocha
July 18, 2006 Agenda Item 15 Michelle Martin Consideration Of Applicant Eligibility, Project Eligibility & Evaluation Process for the.
Consideration of Approval of New Projects for the Solid Waste Disposal and Codisposal Site Cleanup Program Permitting and Enforcement Committee Agenda.
Consideration of Contractor Targeted Statewide Waste Characterization Studies CIWMB Board Meeting May 11-12, 2004.
California Integrated Waste Management Board 1 CIWMB Board Meeting - Item 12 (Presented at the Strategic Policy Development Committee) Consideration Of.
1 Consideration of the Eligibility Criteria, Scoring Criteria and Evaluation Process for the Reuse Assistance Grants Program FY 2007/08 and 2008/09 November.
Scoring Criteria and Evaluation Process for the Used Oil Nonprofit Grant Program (7 th cycle – UNP7) FY 2006/2007; and the Used Oil Research, Testing,
Consideration of Applicant Eligibility, Project Eligibility, and Evaluation Process for the Tire-Derived Product Grant Program FY 2005/2006 Michelle Martin.
Staff Draft Proposal for Expanding the Statewide Zero Emission Vehicle (ZEV) Incentive Program CALIFORNIA AIR RESOURCES BOARD Public Workshop, December.
1 Consideration Of Approval Of The Report To The Legislature Regarding The Waste Tire Recycling Management Program Agenda Item 7 Committee Item C May 13,
Waste Tire Track and Other Recreational Surfacing Grant Program FY 2003/2004 Grant Manager: Elena Yates.
California Integrated Waste Management Board Scope of Work for the Enhanced Enforcement, Security Assistance, Education, Training, Investigative Assistance,
California Integrated Waste Management Board 1 Grant Awards for the Rubberized Asphalt Concrete Grant Programs (FY 08/09) Pamela Kelley Committee Item.
California Integrated Waste Management Board 1 Rigid Plastic Packaging Container (RPPC) Informal Rulemaking Jerry Berumen Permitting and.
By: Linda Dickinson Agenda Item 7 May 11, 2004 Tire Product Commercialization and Applied Technologies Grant Awards.
California Integrated Waste Management Board 1 Agenda Item 6 (Committee Item G) June 9, 2008 Agenda Item 6 (Committee Item G) June 9, 2008 Consideration.
STATE OF CALIFORNIA Green Schools in a Red Economy Pacific Energy Center September 21, 2010 Presented by the Office of Public School Construction (OPSC)
Discussion of Priority Activities for Next Eighteen Months Action Plans.
California Integrated Waste Management Board 1 Sustainability & Market Development: Committee Meeting Plastic Collaborative Efforts Agenda Item 19 Mike.
Work Related to Senate Bill 2202 (effective January 1, 2001)
California Integrated Waste Management Board Consideration of a Memorandum of Understanding Between the California Integrated Waste Management Board and.
California Integrated Waste Management Board Green Material ADC Strategic Policy Development Committee June 10, 2008.
California Integrated Waste Management Board 1 Update And Request For Direction On The Determination Of The Co- Mingled Recycling Rate For The At-Store.
California Integrated Waste Management Board 1 Agenda Item 5 (Committee Item F) June 9, 2008 Agenda Item 5 (Committee Item F) June 9, 2008 Consideration.
California Integrated Waste Management Board Special Board Meeting CONSIDERATION OF BOARD ACTION OVER MADERA COUNTY LEA Sacramento, CA October 3, 2005.
Consideration Of Reallocation Of Fiscal Year 2006/07 Funds And Scope Of Work For The Tire Retread Targeted Outreach Materials And Promotional Training.
IMPACT FEE GRANT PROGRAM FOR NFPs Discussion Item March 6, 2012 Board of County Commissioners.
California Integrated Waste Management Board 1 Statewide Technical and Analytical Resources Used Oil Allocation February 18, 2009 Emily Wang Agenda Item.
Consideration of Grant Awards for the Local Government Waste Tire Cleanup and Amnesty Event Grant Program for FY 2006/2007.
California Integrated Waste Management Board 1 Consideration Of Reallocation And Of Grant Awards For the Joint Solicitation Of The Used Oil Nonprofit Grant.
California Integrated Waste Management Board Consideration Of Adoption Of Emergency Regulations To Implement Statewide Recordkeeping And Reporting Requirements.
California Integrated Waste Management Board Consideration Of Allocation Proposals To Be Funded From The Integrated Waste Management Account And/Or To.
California Integrated Waste Management Board May 12, 2009 Committee Item D Consideration Of The Adoption Of The Biennial Update Of The Five-Year Plan For.
Consideration of the Scoring Criteria and Evaluation Process for a Joint Solicitation of the Used Oil Nonprofit Grant Program (6 th cycle) FY 2004/2005;
Strengthening Law Enforcement & Community Relations Grant Program.
THE BIGGEST WINNER Uniform Guidance. Test Your Knowledge UG Basics Equipment & Facilities Shared Costs Items of Cost Bits & Pieces
OFFICE OF THE CITY CLERK OCTOBER 24, 2016 CALLING OF THE MARCH 7, 2017 CITY AND PUSD CONSOLIDATED PRIMARY NOMINATING ELECTION AND THE APRIL 18, 2017.
Tax Abatement Policy Renewal
2015 Leadership Conference “All In: Achieving Results Together”
St. Francis Public School Proposed Levy Payable 2018
Polk Transportation Planning Organization April 14, 2011
OFFICE OF THE CITY CLERK OCTOBER 24, 2016 CALLING OF THE MARCH 7, 2017 CITY AND PUSD CONSOLIDATED PRIMARY NOMINATING ELECTION AND THE APRIL 18, 2017.
Planning and Budget Committee
Guide to the Single Plan for Student Achievement
Proposed Budget Summary
Presentation transcript:

California Integrated Waste Management Board 1 Consideration Of Applicant Eligibility, Project Eligibility & Evaluation Process for the Tire-Derived Product Grant Program FY 2007/2008 July 11, 2007 Michelle Martin Committee Item I, Agenda Item 20

California Integrated Waste Management Board 2 Background Included in the Board’s approved document, Five- Year Plan for the Waste Tire Recycling Management Program –4th Edition Covering Fiscal Years 2007/2008 – 2010/2011 Applicant & Project Eligibility Must divert a minimum of 2,500 CA waste tires Must divert a minimum of 2,500 CA waste tires Maximum of $5 per tire diverted Maximum of $5 per tire diverted Public entities purchasing tire-derived products such as sport surfacing, sidewalks, weed abatement covers, mulch, sound barriers and traffic safety products

California Integrated Waste Management Board 3 Application Requirements Certify compliance with the principles of Environmental Justice Certify compliance with the principles of Environmental Justice Provide a current, approved resolution, as applicable Provide a current, approved resolution, as applicable Provide an acknowledgement that the applicant has a recycled-content purchasing policy or directive Provide an acknowledgement that the applicant has a recycled-content purchasing policy or directive Certify that one-hundred percent (100%) California Waste Tires will be used in the project. Product manufacturers/suppliers must complete the Tire Derived Product Certification Form (CIWMB 227) Certify that one-hundred percent (100%) California Waste Tires will be used in the project. Product manufacturers/suppliers must complete the Tire Derived Product Certification Form (CIWMB 227) Submit only one (1) application; an application may include multiple tire-derived products/projects

California Integrated Waste Management Board 4 Proposed Evaluation Process GAU will perform initial data entry & completeness review GAU will perform initial data entry & completeness review Staff will review applications and determine whether the applicant & project are eligible Staff will review applications and determine whether the applicant & project are eligible Grant funding will be based on the calculations they have provided on the Application Cover Sheet Grant funding will be based on the calculations they have provided on the Application Cover Sheet Number of Tires Diverted X Cost Per PTE = Grant Amount Number of Tires Diverted X Cost Per PTE = Grant Amount

California Integrated Waste Management Board 5 If more grant funds are requested by eligible applicants than are available, a random selection process will be conducted. Random Selection Process Each application will be assigned a number Each application will be assigned a number Random numbers will be drawn for each application Random numbers will be drawn for each application The random number will determine funding order The random number will determine funding order The list will then be sorted by geographic sort in descending order The list will then be sorted by geographic sort in descending order Process

California Integrated Waste Management Board 6 Staff recommends Option 1, approval of the proposed applicant eligibility, project eligibility and evaluation process for the FY 2007/08 TDP Grant Program, and adoption of Resolution Number Staff recommends Option 1, approval of the proposed applicant eligibility, project eligibility and evaluation process for the FY 2007/08 TDP Grant Program, and adoption of Resolution Number Staff Recommendation Award Item Staff will present the award item at the Board’s December 11, 2007 Board Meeting. Allocation / Funding Five-Year Plan allocates $2.4 million $100,000 for each eligible applicant