03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
1 Liverpool Production Status Week of 02 March 2007.
ARA Production Status Jiwoo Nam. Overall Still Procurement Stage Mechanics under fabrication Delay on DAQ-stack boards, UW/UMD.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
D. Beavis (BNL) HFT Workshop March 10-11, 2009 BNL HFT Beam Pipe and Safety.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
ASSO HEC 2001 Organisation & Responsibilities Chris Oram Oct 2001.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
Status of NA62 straw electronics Webs Covers Services Readout.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
HV boards 1.FIRST ASDBLR HV PROTO BOARD: leakage currents on 100nA CH, humidity at cern. 2. TRIAL 1 Encapsulate caps in Printed Circuit Board C schock,
1 Installation Logistics Itzhak Tserruya HBD meeting BNL, July 6, 2006.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
TG 11 overview / Material screening Hardy Simgen MPI für Kernphysik for Task Group 11.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
19/6/2002S. Patricelli Muon week1 Status of RPC production (1) zThe leading production for RPCs is the the gas volume production at GT. All other items.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
DATABASE ARCHITECTURE PROPOSAL Fabien Jeanneau – 19 jan 2015.
S.Movchan Straw manufacturing and QC
Bill Raynor Naval Research Lab
BSS Prep work at CERN and Acceptance of Parts
Operating systems and Internet services
L.Fiore Gantry Meeting during the CMS TK week
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
April May April May June July July June August Sept August
AIDA Asic Heatsinks Prototype received, and approved.
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
A. Herlert, CERN PH-SME-IS
Presentation transcript:

03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status

03/07/2000Status at TRIUMF2 Production Changes Moved to `MPI’ method for compressing stack while measuring stack height Ultra-sonic plate cleaning bath repaired Plate washing restarted (~8 plates/day) Still fighting humidity problems; some days no PAD/EST board cutting possible Parts to improve dehumi- difier system ordered

03/07/2000Status at TRIUMF3 Module Production Status 2 modules completed and shipped to CERN arrival: ~03/07/00 1 module completed at TRIUMF 1 module under HV test 1 module stacked; ready to be wired 1 module being stacked (2 modules at CERN ready for restacking)

03/07/2000Status at TRIUMF4 Material Production Status # of PAD boards: 939 no new production since april LArg week # of EST boards: 686 approx 300 produced since april Larg week # of Honeycomb: 3375 no new production yet but HC cut area soon ready for restart # of XC blanks cut: production well under way for sept. delivery to LPI

03/07/2000Status at TRIUMF5 Material Production Status (cont) Bond-ply available for two more months; new delivery expected in two months Production at TRIUMF will stop in case of late delivery

03/07/2000Status at TRIUMF6 Status of Module Shipping Frame Shipping marriage frames arrived at TRIUMF (ready to accept complete modules) Suspension frame currently being manufactured Base plate of suspension frame currently being mounted Estimated time for container to arrive: ~mid July

03/07/2000Status at TRIUMF7 QC Status Updated version version of QC procedures available on HEC QC page at CERN DB changes for module/layer stacking checklists Status of DB  All components (PAD, EST, HC, cu plates) checklists up to date  Module/layer stacking forms being entered (1.5 modules still missing)