The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY Report from DESY, Hamburg, Germany.

Slides:



Advertisements
Similar presentations
Data flow: Main operation: From operation mode program via file operators to file operator servers Trigger generator: Trigger information will be distributed.
Advertisements

ILCSC Report KILC12 / Daegu Jonathan Bagger Chair, ILCSC Johns Hopkins University 4/23/12.
SUPERCONDUCTING PARTICLE ACCELERATOR FORUM OF AMERICA (SPAFOA) Update and Planned 2013 Activities April 3, 2013 MSU FRIB Ken Olsen
Nick Walker KEK-DESY meeting 7 th March 2005.
A View from NSF The Early Years of CESR David Berley University of Maryland May 31, 2008 Two Aspects of Cornell’s Success in the International Arena of.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
Basic Science in 21 st Century August 2007 For the Taiwan People M. Koshiba.
Review of last year: Global Design Effort Barry Barish ILC Consultations URA, Washington DC 12-May-05.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
1 Albrecht Wagner, EPP2010, 16 May 2005, Chicago ILC - International Cooperation and Coordination The Point of view of DESY and Germany Albrecht Wagner,
Bright Lights on the Horizon Future Perspectives for Nuclear Resonant Scattering of Synchrotron Radiation Ralf Röhlsberger DESY, Hamburg, Germany.
1 ECFA/DESY Workshop, Prague, Status of the TESLA Proposal R-D Heuer, Univ. Hamburg and: International Detector R&D.
CAPITOL HILL BRIEFING DEC 11, 2013 SUPERCONDUCTING PARTICLE ACCELERATOR FORUM OF AMERICA KENNETH O. OLSEN.
The ILC and DESY 5th Workshop on Scientific Cooperation JINR, Dubna January 2005 R.-D. Heuer, DESY and Hamburg Univ.
J. Mnich for Pier Oddone | ICFA Report to Lepton Photon 2013 June 28, 2013 | Page 1 ICFA Report to Lepton Photon 2013 J. Mnich (for Pier Oddone, ICFA chair)
XFEL Project Overview R. Brinkmann, DESY S2E Workshop, Zeuthen, Aug. 18, 2003.
Marketing at DESY Building Bridges from Science to Market Christian Mennrich HEPTech Workshop on Marketing Sofia,
Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators 104 November, 2013 Interactions US.
1 Albrecht Wagner, Sep 06 Sino-German Workshop Frontiers in QCD September 2006 at DESY Albrecht Wagner.
1 Albrecht Wagner DESY - Overview Mission: Development, construction and running of accelerators Exploit the accelerators for particle physics and research.
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
1 Albrecht Wagner, EPS Aachen, 19 July 2003 Road Map for High Energy Physics The DESY View The strategy for the DESY programme is based on three elements:
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
DESY: From High Energy Physics to Synchrotron Radiation Accelerator Operation in a changing Environment Michael Bieler DESY: From High Energy Physics to.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
Fermilab User’s Meeting June 11, 2002 University Accelerator Research and Fermilab (Ongoing Projects and Opportunities for getting started)
HEPResearchers Set-up JLCB and JLCC ~6 Cite Decision Design ILC Lab. Japan Policy Council Positive Reference from New Prime Minister.
F March 31, 2001David Finley / Fermilab Saturday Morning Physics Slide 2.1 Saturday Morning Physics - Accelerators Accelerators What’s Up Now? What’s Up.
Status of the Project April EPOG, 12th Outreach-Meeting, CERN, Petra Folkerts, DESY 1 Report from DESY, Hamburg, Germany The Status of TESLA and.
DESY Photon Science XFEL official start of project: 5 June 2007 FLASH upgrade to 1 GeV done, cool down started PETRA III construction started 2 July 2007.
ESFRI & e-Infrastructure Collaborations, EGEE’09 Krzysztof Wrona September 21 st, 2009 European XFEL.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Workshop on Women in Science and Engineering Latifa Elouadrhiri Jefferson Lab November 16, 2009.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
Accelerator Vacuum Systems at DESY M.Seidel, DESY Workshop on Vacuum Systems of Synchrotron Light Sources Barcelona,
LC Scope: European View 1- Scope document should define a parameter set for a Linear Collider to be used as the European input to the world wide scope.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
DESY Deutsches Electron Synchrotron Shima Bayesteh.
1 Historical overview Moscow Mechanical Institute was founded in The main purpose of foundation – training of researchers and engineers for USSR.
InterAction Group: International Communication in Particle Physics EPOG, 12th Outreach Meeting, CERN, April 2003 Petra Folkerts, DESY / Judith Jackson,
Reducing Emissions from Deforestation and Forest Degradation Forest Carbon Partnership Facility Participants Committee Meeting Panama, March 11-13, 2009.
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
Report on ECFA Gerard van der Steenhoven Based on plenary ECFA meeting of 26 Nov. CERN Issues: – Business as usual (chair, CERN, DESY) – ESGARD.
Round Table discussion Norbert Holtkamp SNS Oak Ridge National Laboratory August 11, 2004.
ICFA Report to New Frontiers in Physics January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; June 15, 2012New Frontiers in Physics1.
1 TESLA Collaboration Meeting at INFN-LNF Status and Plans for TESLA: X-FEL and LC Albrecht Wagner Frascati, 26 May 2003.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Itzhak Tserruya Weizmann Institute of Science
Status and Plans of TESLA
DESY / XFEL – Tunnel layout, transport and handling solutions
European Network for Novel Accelerators (EuroNNAc2): WP7
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
Introducing European XFEL Enlightening Science
News from DESY. Joachim Mnich KET Jahresversammlung Bad Honnef
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
Status of the TESLA Proposal
XFEL Project (accelerator) Overview and recent developments
Yasuhiro Okada, Executive Director, KEK
Prospect of Indo-US Collaboration
Presentation transcript:

The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY Report from DESY, Hamburg, Germany

The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY DESY‘s 3 Columns Accelerator R&D Work since 1992: superconducting linear accelerator for the TESLA LC and the X-FEL Particle Physics 1000 HEP users at HERA II 3 detectors H1, ZE_US, HERMES (HERA-B finished data acquisition in Febr. this year Synchrotron Radiation Research 2000 SR users in the HASYLAB HAmburg SYnchrotron radiation LAB

The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY TESLA and X-FEL October 2002 X-FEL Supplement March volume TESLA TDR (LC + X-FEL)

The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY The Decision 5 February 2003 Decision of the German Federal Research Ministry on Large-Scale Facilities 1) YES to the TESLA XFEL „A new free electron laser is to be built at the DESY research centre in Hamburg. In view of the locational advantage, Germany is prepared to cover half of the investment costs amounting to 673 million. Talks on European cooperation will soon start so that it will be possible to take a decision on construction within about two years. The construction period will be appr. six years.“

The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY The Decision 2) NOT YET to the TESLA LC „No German site is at present proposed for the TESLA linear accelerator. The reason is that the accelerator project will be an international collaboration. International developments must therefore be taken into account. An independent initiative by Germany concerning the site of the accelerator is neither appropriate nor necessary. DESY will, however, be able to continue its international research work so that German participation in a future global project will be possible.“ (PLUS 120 Mio Eur for PETRA III as a national project )

The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY The Decision 14 June 2003, Public Science Forum in Hamburg Research Minister Edelgard Bulmahn: “TESLA is not buried – and as well as scientists may have dreams ministers may have dreams. But from the today’s point of view, I never can’t guarantee that TESLA could be realized in 10 years or that there will be a decision on TESLA in 5-6 years.” “With the X-FEL and the PETRA III project DESY’s future is assured for a long time. Both projects are an enormous challenge and DESY enjoys the German government’s confidence of the successful realization of both projects.”

The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY The Consequence Since June 2003 DESY is on the way to change from a Particle Physics Lab with a strong Synchrotron Radiation Research Department into a Light Source Lab with Particle Physics Groups and activities

The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY DESY Status HERA II until 2006/07 With 3 detectors No HERA III possible X

The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY DESY Status Light sources for HASYLAB 43 measurement stations DORIS PETRA (test beam, parasitic)

The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY DESY Future VUV-FEL from 2004 in operation as a user facility based on the TESLA Test Facility experience with sc TESLA acceleration modules

The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY DESY Future PETRA III from 2007 rebuilding the HERA injector PETRA II based on the TESLA Test Facility experience with sc TESLA acceleration modules

The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY European X-FEL Lab Next 2 years: Build-up an European X-FEL Collaboration Preparation of the X-FEL construction approval

The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY DESY‘s HEP future Data analysis of HERA II … 2010 ? No experiments after 2007 (no HERA III program) e+e- physics and detector R&D for the next LC R&D for TESLA: sc cavities, high gradient (800 GeV) GAN and Grid Participate in the in the LC working groups of ECFA and ICFA

The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY DESY‘s Outreach future DESY as a light source lab X-FEL promotion Communication of HERA discoveries Outreach for pp: InterActions Collaboration EPOG ELCSG-OSC