ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client 14448 High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]

Slides:



Advertisements
Similar presentations
Status of PMD DCS. PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48.
Advertisements

PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48 Nos. Total Unit module.
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
The Detector Control System – FERO related issues
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Slide 117 th DCS Workshop – October, 10Francesca Poggio ZDC DCS Status Report Francesca Poggio Università degli Studi di Torino INFN, sezione di Torino.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Slide 118 th DCS Workshop – March, 6Francesca Poggio ZDC DCS Status Report answers to DCS commissioning meeting Francesca Poggio Università degli Studi.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
MDT PS DCS for ATLAS Eleni Mountricha
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
DCS workshop CERN, Mar 5, 2007 Kai Schweda 1 TRD Status Kai Schweda, University of Heidelberg B. Doenigus, J. de Cuveland, T. Dietel, D. Emschermann, M.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
1 Responsibilities & Planning DCS WS L.Jirdén.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Outlook Production of the 12 DPs (220m Stations) Installation of the DPs in the LHC Tunnel Status of the RP Systems/Services Resources Production of DPs.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
ALICE DCS Workshop 9 October 2006 ALICE DCS Workshop 9 October 2006 Michele NITTI.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
MCH(Muon Tracking) DCS Introduction Overview drawing High Voltage - hardware functional diagram Logical Diagrams Summary table of states and commands Commands.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
Alice TPC DCS.
The LHCb Run Control System
TPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
R.TIEULENT - ALICE Offline Week
Presentation transcript:

ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?] Crate Control On-detector electronics 32 Temp. Monitor VME (wiener?) 1 15/03/06 Detector Crocus (on-detector crates) UX-C05/06 CR3 CR4-X03 UX-C05/06 SY1527 (A1821N) CAEN OPCserver EASY 3000 PVSS II OPC client E HV LV 48V PS C LV (48V) CR3 PCI-CAN Wiener OPCserver PVSS II OPC client C CR3 PCI-CAN ELMB OPCserver PVSS II OPC client C 1 ELMB 2 DDL CR3 SG2 CR5 SG2 Gas system PLC Gas E Detector PVSS II DIP [GWG] Gas Gas PVSS UX-C CR3 Cooling Plant PLC Detector Cooling E Detector PVSS II Modbus/TCP 1 [TS/CV] TS/CV SCADA

PMDDCS SMI Control Unit SMI Device Unit VETOPRE HVPS UM2448 UM 023 LVPS HV 3.3 Detector oriented hierarchy CrateCtrl Temp Hardware Device Infra

Present Standard State diagram for the DCS Due to the increasing number of integrated sub- systems in the ALICE DCS, in order to allow a complete integration the present sub- detector DCS state diagram may change. GO_STANDBY CONFIGURE (run_mode) CALIBRATE (calib_mode) GO_BEAM_TUN GO_READY MOVING_BEAM_TUN MOVING_STBY_CONF MOVING_READY MOVING_BEAM_TUN CONFIGURE (run_mode) CALIBRATE (calib_mode) GO_STBY_CONF GO_READY GO_STBY_CONF GO_BEAM_TUN CALIBRATE (calib_mode) CONFIGURE (run_mode) LOCK OFF DOWNLOADING GO_OFF CONFIGURE (run_mode) GO_STANDBY CALIBRATING READY DOWNLOADING READY_LOCKED UNLOCK STBY_CONFIGUREDSTANDBYBEAM_TUNING CALIBRATINGDOWNLOADING STOP

Need Of LVDB Without LV Distribution, if the LV trips all 6 chains on the module consisting 4608 cells will be off. LV segmentation will help in isolating the faulty chains by tripping LV supply for the particular chain if fault persists.Also fault can be monitored remotely and can be use for data analysis. Prevents FEE boards from going bad due to excess current drawn by the chips due to HV sparks.

General description of LVDB LVDB helps us in actively distributing the LV- supply among the FEE board chains (12 FEE Boards per chain). It also controls the over-current in a chain which may be caused by HV spikes or board going bad. Current limit can be adjust for the different no of FEE boards in a chain. One board can supply 6 chains and also through DCS, chains can be monitored and we can have off time of chain in database.

Low Voltage Distribution Box (LVDB) To translator Supply Current adjustment pot Sensing points to DCS Power I\P from LV Supply

Remaining work LV no work done till now FSM’s need to be finalized Configuration dB Testing and finalization of LVDB Use of ALICE GUI