ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY 1.1.6.3 Contract n. 037110 (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis:

Slides:



Advertisements
Similar presentations
Science and Policy Integration for COastal Systems Assessment
Advertisements

Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC.
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC IAT.
My Rights – My Voice Training by Persons with Disabilities to Staff on UNCRPD (10/ /2014) Communication Plan & Dissemination Strategy Kick off meeting.
The Business Support Professional Career Pathway Leonardo Partnership Management Meeting CECA´s headquarter Seville, Spain March 2010.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Further.
WP2 – communication and dissemination
Analytical Evidence on Research & Innovation in the Danube Region Progress of WP4 Vienna, Béla Kardon, PhD; RCISD
CONCILIATION Project “TWINNING FOR CONCILIATION BETWEEN FAMILY AND PROFESSIONAL LIFE” Institute of Family Science - Portuguese Catholic University March,
1 9-10/01/2007 Kick-off meeting UPDATE
LDV Partnership Project (Lajost) 3rd meeting ESTONIA (Tallinn) 1-4 August 2014 Learn About Finding Jobs for the Disabled
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
‘Approaches to programme planning and budgeting’ Experience of Regional Centre for the Safeguarding of Intangible Cultural Heritage in South-Eastern Europe.
Communication strategy and techniques to launch InnovMed Dr. Fatma H. Sayed Vienna meeting 25 June 2007.
Responsible and safer places where men have sex with men.… Everywhere A European Methodological Model of HIV Prevention in Men who have Sex with Men (MSM):
Comparison of the Project Dissemination Reports period: – Coordinating institution Klaipeda College of Social Sciences Project coordinator.
OVERVIEW OF INTEGRATED WASTE MANAGEMENT IN WEST AFRICA (IWWA)
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions: Dissemination NATURAL HISTORY MUSEUM – UNIV. OF CRETE (NHMC) Project co funded by.
VITA- Virtual Learning for the Management of successful SMEs LEONARDO DA VINCI PROJECT – TRANSFER OF INNOVATION January 2009 – December PTI-LEO
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
Multilateral Project for Transfer of Innovation Project Duration: 24 months Partners’ Kick-off Meeting, November 2009, Sofia Tanya Pancheva/University.
Action Plan for AWM WP5: Establishment of Permanent Adriatic Welfare Observatory Welfare Mix Days Ulcinj, July Andrea Russo Adriatic Welfare Mix.
LIFE12 ENV/IT/ «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start:
2-6th June 2003 WP6 MAMA project WWW WP6 MAMA WWW 4 rd MAMA Meeting ROME, 3-6th June 2003 IFREMER coordinator Responsible
Agricultural Market Information System (AMIS): State of Play AMIS First Meeting of the Rapid Response Forum 11 April 2012 Mexico City Abdolreza Abbassian,
EUMEDIS PILOT PROJECT Sector 4: Information and communication technologies applied in industry and innovation MED.PRIDE MED.iterranean PR.oject for I.nnovation.
Welcome Juanma Ormazabal (entrepreneur) from Aceros Ormazabal company (steel)
COMPONENT 2 COMMUNICATION & DISSEMINATION 5 th INNOPOLIS meeting Prague, 19/10/2011 OVERVIEW.
I NTRODUCING WP7: D ISSEMINATION Mario Zamponi Centre of Historical and Political Studies on Africa and the Middle East Dept. of Politics, Institutions,
SIXTH FRAMEWORK PROGRAMME FP INCO-MPC-1 MEditerranean Development of Innovative Technologies for integrAted waTer managEment.
Welcome Plans for the day Key milestones progress Requirements for final report Update on communication with social partners Identify any problems &
1 WERT: WP 5 RG EVANS ASSOCIATES November 2010 Aim To pilot and evaluate the content and context of the course material with target groups To help women.
Work Package 2 Communication & Dissemination Leader: TUC.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
Building Media Partnerships for Education, Mitigation, and Response Nezette Rydell Warning Coordination Meteorologist National Weather Service Honolulu,
1 st -4 th December st BioXHIT Annual Meeting WorkPackage 5.2: Implementation of Data management and Project Tracking in Structure Solution Peter.
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
PGR Forum Work package 6: Product exploitation and dissemination Progress report Presented by Shelagh Kell PGR Forum Workshop 2: Threat and conservation.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
ResistVir 18 months meeting (WP7) Work package 7 (WP7) Dissemination and technology transfer The deliverables of WP7 D21 First technology transfer workshop.
CAST Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework Programme.
ISTANBUL UNIVERSITY RECTORATE INSTITUTE OF MARINE SCIENCES AND MANAGEMENT (Postgraduate Institute)
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
1 Connecting Bulgarian Entrepreneurs to the European Knowledge Base Virginia Jordanova Mercouri CORDIS Communication and Awareness
NOV-3261-SL-3699 v.1.0 The DeSurvey website Véronique BRUNIQUEL First Annual Meeting – April 4-7, 2006 Vasto, Italy.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
The Male’ Declaration Proposal for Phase 4 Implementation.
Gabriela Macoveiu North-East RDA, Romania PP11 – WP responsible Cluster Policy Learning Platform WP3 Description Smarter Cluster Policies for South-East.
Project “Eco-pedological Map for the Alpine Region” APAT- Agency for Environmental Protection and Technical Services Harmonization of Soil Information.
Helix Nebula final dissemination report Daniele Catteddu Cloud Security Alliance Helix Nebula – The Science Cloud.
SOLARNET DISSEMINATION AND COMMUNICATION PLAN SOLARNET DISSEMINATION AND COMMUNICATION PLAN (Outreach Plan) SOLARNET PROJECT OFFICCE.
Barcelona 8th-9th May 2008 NEAREST 2nd mid-year meeting Introduction.
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Exploitation means to use and benefit from something. For Erasmus+ this means maximising the potential of the funded activities, so that the results are.
FUSE TEMPUS Project Coordination Meeting Belgrade University, 27 and 28 November, 2014 WP 5 - Dissemination of Project- Related Information ACTION PLAN.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
NatRisk WP-6: Dissemination
The FAIRMODE ways of communication
NEAREST 2nd mid-year meeting
ERASMUS+ KA2 PROJECT: Enhancement of study programs in Public Health Law, Health Management, Health Economics and Health Informatics in Montenegro “DISSEMINATION.
Davor Kozmus, MHEST Steering Platform Meeting 29. October 2009, Zagreb
BioMedBridges – Work Packages 2 & 12
Dissemination Plan made from EDUNET LEONARDO PARTNERSHIP PROJECT
IENE Intercultural Education of Nurses in Europe
MARDS DISSEMINATION & EXPOILTATION
Aurora Hoxha & Drini Imami
PUBLIC AND INDUSTRY RELATIONS
Presentation transcript:

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 WP9 ANALYSIS from 1/10/2006 to 30/09/2007 FIRST ANNUAL MEETING

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 The main goal of WP9 is to promote the transmission of project information to the general public, local communities, relevant regional and national institutions as well as civil protection agencies.

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 The Work Package will maximize the results of the project, in particular: –to raise awareness at the local, regional and inter- regional level about the need to carry out the integrated analysis of tsunamigenic structures and implementing a tsunami early warning system prototype –to favour the co-ordination between stake-holders, including civil protection agencies, and decision makers in implementing actions to increase preparedness and to reduce vulnerability.

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 Task 9.1 Project communication Task 9.2 Project web site Task 9.3 Contact database Task 9.4 A dissemination plan WP9 TASKS

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 Delivery date (project month) Deliverable nameDel. no. minutes of meetings and workshopsD36 periodical management reportsD35 12, 24, project information materials (initial, updates and final) current situation and know-how on tsunami and EWS D34a D34b 8contact database (regularly updated throughout the project)D33 1web siteD32 6project brochureD31 Deliverable list

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 Task 9.1 Project communication A project communication image was elaborated, with a logo and a brochure in which are briefly summarized the objectives, the actions and the expected results of the project. Copy of this brochure is available also on the web and today will be distributed to all the present partners.

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 Brochure Cover

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 Brochure Inside

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 Task 9.2 Project web site The project web site, “nearest.bo.ismar.cnr.it”, was set up using an open source GNU licensed platform (PLONE) and is hosted by the ISMAR computer centre in Bologna. The site contains basic information and status of the project, a description of the partners and related links, documents and reports on project meetings, news etc.

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 The Web Site is divided in two areas with different characteristics: publica public section, accessible to every users, and privatea private section fully open to all the project partners with the aim to assure co-ordination and retrieval of project information. Actually on the public section are available, to be downloaded, the project brochure and the NEAREST2007 cruise report.

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 PRIVATE AREA PUBLIC AREA

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 The next goals will be to complete the web site with following sections that are under construction: - a list of mutual related links to web sites of interest; - the completion of the public section in which the results of the project, tailored to inform non-specialists and the general public, will be downloadable; - a photo/movie section;

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 Task 9.3 Contact database The contact database is not yet fully completed and actually include a list of portuguese, spanish and italian people, institutions and journals that could be sensible to the hazard warning. This database has to be upgraded and we ask to the partner an active contribute.

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 Task 9.4 Dissemination plan This task foreseen the using of different communication means as newsletters, electronic newsletters, regional and national press, radio / TV etc to reach the non scientific people. In addition the diffusion plan include the presentation of the project activity in scientific meetings or congresses.

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 Interview list 17 th August 2007 – Faro (Portugal) Interview with Lusa- Agencia de Noticias de Portogal 18th August Faro (Portugal) interview on portuguese TV TVI – Channel 4 interview on portuguese TV RPT - Channel 1 29 th August 2007 interview with italian web newspaper AFFARI ITALIANI ( 3 rd September 2007 radio interview on italian IsoRadio, la Pillola, 9 th September 2007 Tv interview on italian Rai Uno - "Bit“ ( 13 th September 2007 interview on american web journal WIRED ( And so on…

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 Scientific Presentations and posters at International congresses and meetings EGU General Assembly, Vienna, April 2007 IUGG XXIV General Assembly, Perugia, July 2007 Parteci pation to ESONET Meeting Partecipation to TRANSFER Meeting

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007 In the meanwhile we have undertaken in the following activities: Developing a relational database of geological and geophysical data (i.e. sub-bottom profiler segy data, MCS segy data, bathymetric data, navigation data etc.).Our goal will be to put this database accessible on the web site. Organizing and mantaining an ftp site (ftp.ismar.bo.cnr.it) accessible by login and password in order to permit a sure exchange of big amount of geological/geophysical data among the project partners.ftp.ismar.bo.cnr.it Urania 2007 cruise planning, developing and scientific reporting.

ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis: towards an early warning system Marrakech, October 2007