1 Barcelona 8th-9th May 2008 NEAREST 2nd mid-year meeting Introduction

2 Barcelona 8th-9th May 2008 _ All presentations (supporting files) will be uploaded on the meeting laptop and then moved to the nearest web-site –General meeting coordination will be made by Nevio Zitellini –ASTER will take care of the meeting minutes updating also the project GANNT and deliverable/milestones situation Meeting organization

3 Barcelona 8th-9th May 2008 –Per each scientific workpackage (WP2 to WP8) an ad hoc session has been organized. –Each session will be opened by a brief report from the WP leader, outlining activities carried out during the third semester of the project, main goals achieved, deliverables produced and criticalities met (including deviations to original time schedule). WP STATE OF THE ART AND PLANNING SESSIONS

4 Barcelona 8th-9th May 2008 –The second part of each WP session will be devoted to planning the activities to be carried out - task per tasks- in the following period, and in particular in the fourth semester of the project. A proposal will be presented by the WP leader and discussed at project level, pointing out the main critical tasks to be faced.  Specific problems to be put at the attention of the Steering Committee will be pointed out as well. WP STATE OF THE ART AND PLANNING SESSIONS

5 Barcelona 8th-9th May 2008 NEAREST collateral activities ESONET – LIDO TRANSFER FUTURIS program (www.euronews.net) suggested by the Commission officerwww.euronews.net

6 Barcelona 8th-9th May 2008 Del.n.Deliverable name WP n. Due Date (projec t month) Actual/F orecast delivery date Estimat ed person months Actual person months Lead participant Dissemina tion level SUMITTE D D1review of sources of tectonic originWP111152526,4FFCULCO DISP D2review of sources due to slope instabilitiesWP112162518FFCULCO DISP D3 report on site characterisation and selection for the deployment of the deep sea platformWP111865,5FFCULPU x D4depth migrated multi-channel seismic profilesWP218 50 CSICRE NOW D5wide angle seismic cruise reportWP2142512 CSICPU NEXT D6 crustal geometry, seismic velocity and density models along wide angle profilesWP2313412 CSICRE D7 deployment cruise of broad band OBS and cruise reportWP312 316,75AWIPU x D8a recovery cruise of broad band OBS, pre- processing and data base compilationWP322 17 AWICO NEXT D8bcruise reportWP324231 AWIPU NEXT D9broad band OBS data analysisWP330 50 AWICO DELIVERABLES

7 Barcelona 8th-9th May 2008 D10 definition of sensors’, software requirements for the deep-sea platformWP44865,9INGVCO x D11 detailed design for the integration of new sensors and device in the deep-sea platformWP48885,77INGVCO x D12 integration of new sensors, test of functionality of the deep-sea platformWP41110145,3INGVCO x D13 deployment procedure for the deep-sea platformWP411 14,3INGVCO x D14 deployment cruise of the deep-sea platform and cruise reportWP412 22,3INGVPU x D15a recovery cruise of the deep-sea platform and data quality checksWP422 11 INGVCO NEXT D15bcruise reportWP424 1 INGVPU NEXT D16integration of seismicity dataWP535 18 UGRCO D17integration of tide gauge dataWP535 12 UGRCO D18 integration of multiparameter data from the deep-sea platformWP535 8 UGRCO D19a procedures, algorithms and methodologies for automatic and rapid determination of source parameters from a multi-parameter stream of dataWP535 6 UGRCO D19b requirements and design of the tsunami triggering systemWP535 6 UGRCO D20specifications of the tsunami detection systemWP535 6 UGRCO

8 Barcelona 8th-9th May 2008 D21 report on the lithology geochemistry, physical properties and age of onshore tsunami deposits onshoreWP6203022 CSICRE D22 a report on the lithology, geochemistry, physical properties and age of offshore seismic deposits offshoreWP6283611 CSICRE D22 bhigh-resolution seismics and core sampling cruise reportWP6283411 CSICPU D23 model of recurrence time interval for large earthquake and tsunamiWP6303622 CSICPP D24 anew bathymetric mapWP7111256,7FFCULRE x D24 bcruise reportWP7111251FFCULPU x D25 implementation of a numerical tsunami model for SW PortugalWP717 12 FFCULCO NOW D26simulation of the 1755 tsunami in the Boca de Rio areaWP729 9 FFCULCO D27inundation maps for Lagos-SagresWP732 9 FFCULCO D28validation of the modelWP735 12 FFCULCO D29 template of synthetic data streams generated from tsunami generation scenariosWP823 12 FFCULCO NEXT D30simulator for the decision-maker authoritiesWP835 27 FFCULPU

9 Barcelona 8th-9th May 2008 D31project brochureWP96810,6ISMARPU x D32web siteWP96121ISMARPU x D33 contact database (regularly updated throughout the project)WP98830,2ISMARRE x D34a 1project information materials (initial)WP912 10,53ISMARPU x D34a 2project information materials (updates)WP924 1 ISMARPU NEXT D34a 3project information materials (final)WP936 1 ISMARPU D34a b current situation and know-how on tsunami and EWSWP930361 ISMARPU D35aperiodical management report year 1 WP1 014 34,67ISMARPU x D35bperiodical management report year 2 WP1 026 3 ISMARPU NEXT D36_ 1minutes of meetings and workshops Year 1 WP1 012 11ISMARRE x D36_ 2minutes of meetings and workshops Year 2 WP1 024 0,5 ISMARRE NEXT D36_ 3minutes of meetings and workshops Year 3 WP1 036 0,5 ISMARRE D37final Report 38 6 ISMAR-BOPU D38technological implementation plan 38 4 ISMAR-BOPU

10 Barcelona 8th-9th May 2008 STEERING COMMITTEE AGENDA NEAREST 2008 CRUISE ORGANIZATION: OBS RECOVERY GEOSTAR RECOVERY MULTIBEAM SURVEY PARTICIPATION TO THE NEAREST-SEIS CRUISE FORESEEN FROM 27 OCT TO 13 NOV DISSEMINATION: CONTRIBUTION TO THE CONTACT DATABASE AGU FALL MEETING PARTICIPATION ORGANIZATION OF A FIELD TRIP IN MOROCCO TO STUDY THE NEOTECTONICS OF THE AREA ORGANIZATION OF NEXT NEAREST ANNUAL MEETING