Planetary Missions Division Dvk, 16 Jul 2002 Interfaces - presented at the SWT #10 To clarify the situation with interfaces, formats, etc. Summary: There.

Slides:



Advertisements
Similar presentations
June 26, 2002; Page: 1 ESOC (TOS-OGR) European Space Operations Centre Manfred Warhaut Ground Segment Manager TOS-OGR ROSETTA Ground Segment.
Advertisements

Rosetta Magnetic Field PDS Review B. J. Anderson.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations The planning concept - current status Detlef Koschny Space Science Department ESA/ESTEC.
DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos november 2010 Présenté par : JP. Marcovici Sigle.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) GSE Timothy Quinn.
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Simulating A Satellite CSGC Mission Operations Team Cameron HatcherJames Burkert Brandon BobianAleks Jarosz.
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
S R S S ystem R equirements S pecification Specifying the Specifications.
Web-based Query & Reporting System for Software User Consultant Richard Knowles Rutgers University Electrical & Computer Engineering Mentors: Amy Chen.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests.
EUSO-SODC status report M.C. Espírito Santo Huntsville, May 2003.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
NORMAN Databases Collection of data for EMPODAT – key issues Environmental Institute, Koš, Slovakia.
SOPS: The Science Operations Planning System for the first ESA Lunar Mission SMART-1.
GDT V5 Web Services. GDT V5 Web Services Doug Evans and Detlef Lexut GDT 2008 International User Conference August 10 – 13  Lake Las Vegas, Nevada GDT.
FLORIDA PUBLIC HURRICANE LOSS MODEL V6.1 Computer Science February 2-4, Dr. Shu-Ching Chen School of Computing and Information Sciences Florida.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
Exchanging Databases with Dissimilar Systems Using CCSDS XTCE
1 Description and Benefits of JWST Commanding Operations Concept TIPS/JIM Meeting 17 July 2003 Vicki Balzano.
Thomas C. Stein PDS Geosciences Node Washington University in St. Louis 1MS Supporting Active Surface Missions and Adding Value.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
Learning Objective The students should be able to: a. state the definition of software b. state the usage of software c. list different types of software.
Label Design Tool Management Council F2F Washington, D.C. November 29-30, 2006
Fall 2010 UVa David Evans cs2220: Engineering Software Class 28: Past and Future.
SPICE Production at ESTEC April SPICE Production at ESTEC 2 Overview SPK/CK production SCLK production FK and IKs production Other Kernels.
Planetary Missions Division Dvk, 26 Jun 2002 Pointing scenario - presented at the SWT #10 Daily schedule Overall status/How to proceed Status of inputs.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC
1/106 December 2001Rosetta SOWG Status of the Rosetta Project TestBed (PTB) P. van der Plas Modelling and Simulation Section ESA/ESTEC ESA/Estec 6 December.
St. John’s, Canada /02/20161 Latest changes and developments in the International Electrotechnical Commission (IEC) Presentation at the meeting.
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
March 2004 At A Glance ITPS is a flexible and complete trending and plotting solution which provides user access to an entire mission full-resolution spacecraft.
SYSTEMSDESIGNANALYSIS 1 Chapter 21 Implementation Jerry Post Copyright © 1997.
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
Project Introduction Spring InSPIRESS Challenge 2 Design an autonomous science payload for the Titan Environmental and Atmospheric Measurement (TEAM)
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
Planetary Missions Division Miguel Almeida David Frew Mehran Sarkarati RSSD/STOC A Comparison of Two Science Operations Planning Concepts Decentralized.
EIS Operation Planning H. Hara (NAOJ) 2007 Dec 10.
PRODUCT VERIFICATION Adapted from the NASA Systems Engineering Handbook for CSULB EE 400D by Alia Bonetti.
Mission Planning Concepts
The road to the first E2E tests
RSOC Overview at SWT #26, 11/12 June 2009
Instrument Teams to SOC Test Specifications
Calibration meeting summary
Pre-landing Orbiter Observations
I&T&C Organization Chart
Geometric information for VIRTIS-M data
Rosetta Science Ground Segment Overview
Mars Swingby (MSB) information
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
RLGS Status / LCC B. Pätz, DLR/MUSC.
GLAST Large Area Telescope:
GIADA Grain Impact Analyser and Dust Accumulator
Solo mission operations
Assembler, Compiler, Interpreter
Assembler, Compiler, Interpreter
Integration & Test Instrument Operations Coordination
<Your Team # > Your Team Name Here
Flight Operations for GOCE, ESA’s Gravity Mission
Presentation transcript:

Planetary Missions Division Dvk, 16 Jul 2002 Interfaces - presented at the SWT #10 To clarify the situation with interfaces, formats, etc. Summary: There are three different interfaces, but we now all speak the same language (ITL). Detlef Koschny and the Science Operations Team Research and Scientific Support Department ESA/ESTEC

Planetary Missions Division Dvk, 16 Jul 2002 Interfaces vs. project phase On test floor  responsible is Alenia  uses CCS (Central Checkout System)  Syntax of operational files: ELISA During commissioning phase  ESOC is responsible  Uses MOIS (Mission Operation Information System), based on Microsoft products (Excel, Visio, …)  Operations will be done using interactive approach, “paper” procedure required called Flight Control Procedures (FCPs) – inputs from experimenters previously collected via paper  ESOC collects inputs for database (Telecommands, TCs) During nominal science operations  Only interface is RSOC  Operations is done with TC sequences (a sequence of TCs that is triggered from the Mission Timeline (MTL) – does not allow telemetry checks)  Uses Experiment Planning System (EPS), takes ITL syntax

Planetary Missions Division Dvk, 16 Jul 2002 Interfaces vs. project phase The only complication…  There will be a transition phase between FCPs and TC sequences after commissioning  Already in the commissioning phase we have two scenarios where the Science Operations Team is coordinating: Pointing and Interference Scenario The good news:  There is a converter from ITL to ELISA  ESOC will accept all new input in ITL syntax ITL syntax – some background  ASCII files in a syntax that allows to specify Operational Requests (OIORs), Telecommand Sequence definitions (CS), Flight Control Procedures (FCPs) including TM checks and special instructions to operators.  Really should be called ITL/EDF syntax…  Information on how to provide the info was sent out to at least everybody on my list on the operational responsible – documented on our livelink server: Rosetta/Tools/EPS/User Manual (incl. Templates)

Planetary Missions Division Dvk, 16 Jul 2002 Interfaces – Test floor Experiment Alenia team/ CCS ELISA files Old: ELISA Converter New: ITL ELISA CCS: Central Checkout System ELISA: File syntax for CCS ITL: Input Timeline, file syntax for RSOC software

Planetary Missions Division Dvk, 16 Jul 2002 Interfaces – Commissioning Experiment RMOC SCOS 2000, MOIS Flight Control Procedures Old: Paper input for FCPs Converter Now: ITL Excel + paper FCPs: Flight Control Procedures (paper procs used for operations by ESOC RMOC: Rosetta Mission Operations Centre SCOS: Spacecraft Operating System – used by ESOC to operate Rosetta MOIS: Used by ESOC to produce FCPs and Telecommand Sequences

Planetary Missions Division Dvk, 16 Jul 2002 Interfaces – Science Operations Experiment RMOC SCOS 2000, MOIS TC sequence calls OIOR (ITL syntax) POR RSOC EPS, PTB Also used in Pointing and Interference Scenario during Commissioning Phase CS updates (ITL syntax) CS updates (Excel) OIOR: Orbiter Instrument Operations Request ITL: Input Timeline (file syntax used by RSOC) RSOC: Rosetta Science Operations Centre EPS: Experiment Planning System – planning software used by RSOC PTB: Project Test Bed – environmental simulator used by RSOC POR: Payload Operations Request – file syntax used from RSOC to RMOC CS: Telecommand Sequence