Presentation is loading. Please wait.

Presentation is loading. Please wait.

Planetary Missions Division Dvk, 26 Jun 2002 Pointing scenario - presented at the SWT #10 Daily schedule Overall status/How to proceed Status of inputs.

Similar presentations


Presentation on theme: "Planetary Missions Division Dvk, 26 Jun 2002 Pointing scenario - presented at the SWT #10 Daily schedule Overall status/How to proceed Status of inputs."— Presentation transcript:

1 Planetary Missions Division Dvk, 26 Jun 2002 Pointing scenario - presented at the SWT #10 Daily schedule Overall status/How to proceed Status of inputs Detlef Koschny and the Science Operations Team Research and Scientific Support Department ESA/ESTEC detlef.koschny@rssd.esa.int

2 Planetary Missions Division Dvk, 26 Jun 2002 Daily schedule  Day 1 (Th, 24 Mar 2003): CONSERT checkout and interference analysis  Day 2 (Fr, 25 Mar 2003): First pointing/slewing, switch on experiments, check experiments  Day 3 (Mo, 28 Mar 2003): Point at star fields and bright stars, co-alignment and distortion  Day 4 (Tu, 29 Mar 2003): Point at star fields and bright stars, co-alignment and distortion  Day 5 (We, 30 Mar 2003): Straylight test, 180 deg sun angle to 90 deg sun angle  Day 6 (Th, 31 Mar 2003): Straylight test, 90 deg sun angle to 45 deg sun angle  Day 7 (Fr, 01 Apr 2003): RSI operations  Day 8 (Mo, 04 Apr 2003): Straylight test, 45 deg sun angle to 20 deg sun angle  Day 9 (Tu, 05 Apr 2003): Planets, Stars and molecular clouds  Day 10 (We, 06 Apr 2003): Planets, Stars, and molecular clouds  Day 11 (Th, 07 Apr 2003): Contingency  Day 12 (Fr, 08 Apr 2003): Contingency

3 Planetary Missions Division Dvk, 26 Jun 2002 General status  Technical note describing the scenario in Issue Draft h. Contains  Geometry info in graphical form (tables available on http://astro.estec.esa.nl/livelink, Rosetta/Mission Scenario Design/Scenario library/Pointing). http://astro.estec.esa.nl/livelink  Our understanding of your requests, based on SOWG input, emails, etc.  Needs an estimated one more week to wrap up, convert to Master Science Plan  From your side: Prepare TC sequences – we need to fill in the names of the TC sequences (In some cases, ESOC is preparing this)!  How to proceed:  Face to face discussions (this afternoon?)  Monday I will send out the updated ITL with the Pointing Skeleton  Email – phone discussion to finalize it  Tuesday: Telecon RSOC-RMOC – discussion about pointing with Flight Dynamics  Finalize by 10 July, we finish Master Science Plan and send to ESOC

4 Planetary Missions Division Dvk, 26 Jun 2002 Status of inputs  ALICE: No formal input, only A’Hearn’s input from SOWG 1 year ago  COSIMA: No requests  CONSERT: Input on procedure level, incorporated in our skeleton – needs final comments from CONSERT  GIADA: Inputs available, TC sequence names tbd  MIDAS: Inputs from SOWG, iteration needed – provide TC sequences  MIRO: Top-level input available from SOWG, Sam to check TN and Skeleton and send updated (“English prosa”) requests  OSIRIS: Top-level input incorporated in our skeleton – Nick to fill in TC sequence names  RPC: Inputs from SOWG, iteration needed  RSI: Requirements understood, pointing requests to be formulated by SOT  ROSINA: No requests  VIRTIS: Inputs available, incorporated in our skeleton – needs brush-up from SOT and filling in of detailed TC sequences


Download ppt "Planetary Missions Division Dvk, 26 Jun 2002 Pointing scenario - presented at the SWT #10 Daily schedule Overall status/How to proceed Status of inputs."

Similar presentations


Ads by Google