RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests.

Similar presentations


Presentation on theme: "RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests."— Presentation transcript:

1 RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests –Covered by tests in RO-EST-TP-3051 Interface Tests –Based on Pointing & Interference Scenario inputs End-to-end Tests –Based on GLEP operations used for SFT Short-term Schedule

2 RSOC System Testing Status - 2 RSOC System Test Concept –Covered in RO-EST-PL-5013 Document defines the overall system level test plan for RSOC Corresponding System Test Report will summarise status Copy will be made available on ‘livelink’ Specific instructions will be given to PI-teams for each test –Status to be presented at key system reviews (GSRR) Status at GSRR will establish following readiness criteria –RSOC Interfaces tested (PI-RSOC-RMOC) –RSOC End-to-end data flow is verified for routine ops. –Draft Interference and Pointing Scenarios are available End of RSOC Commissioning Phase will establish –RSOC system has been fully validated –‘Knowledge-base’ available at RSOC is adequate for Mission

3 RSOC System Testing Status - 3 Connectivity Tests –Covered by tests defined in RO-EST-TP-3051 –Tests conducted over the last few weeks –Results reported in RO-EST-TR-3063 –In summary ---> All ran OK !

4 RSOC System Testing Status - 4 Interface Tests –Based on Pointing & Interference Scenario inputs Two REAL Scenarios will be used (Pointing & Interference). PI-teams will provide draft inputs for these scenarios (ITL files defining the operations and EDF files containing all necessary TC-sequences. These inputs (with modifications made by RSOC) will be used to perform detailed interface testing between RSOC and RMOC. These inputs will be collated and used as the basis for the actual Pointing and Interference scenarios to be executed at the end of the S/C commissioning phase. (First real operations of payload performed using RSOC provided inputs). Availability of these draft scenarios must be confirmed at the GSRR.

5 RSOC System Testing Status - 5 End-to-end Tests –Based on GLEP operations used for SFT RSOC will provide PI teams with files to use for this test : –TC-Sequence.edf containing definitions of TC sequences needed to perform GLEP operations. –RSDB.edf containing the command definitions for each instrument (this RSDB.edf is invoked within in the TC-Sequence.edf and is derived from the RMOC database). –A draft OIOR.itl to be used as the operational input file for the end- to-end test. –PI teams will perform pre-defined actions on these files and transfer them to RSOC. –RSOC will consolidate all inputs and transfer them to RMOC as a POR file. –RMOC will execute this POR file on the PFM during SVT 1.2 (tbc) –PI-teams can retrieve data from DDS and confirm success.

6 RSOC System Testing Status - 6 SFT-GLEP ITL’s OIOR.itlTC-SEQ.edf RSDB RSDB.edf ‘livelink’ TC-SEQ.edf OIOR.itl RSDB.edf TC-SEQ.edf OIOR.itl Add PING-SEQ RSOC E2E Step 1 - prepare test files from SFTPI’s E2E Step 2 - prepare test files

7 RSOC System Testing Status - 7 CS update OIOR.itlTC-SEQ.edf RSDB.edf OIOR.itlTC-SEQ.edf Local EPS D D S POR file OIOR.itlTC-SEQ.edf RSOC EPS RSDB.edf PI’s E2E Step 3 - provide test inputRSOC E2E Step 4 - consolidate files Update Cycle Planning Cycle

8 RSOC System Testing Status - 8 TM files RMOC DDS POR file PI TM Analysis Reference SFT GLEP ITL CS update RSDB PFM S/C TC Stack Test Report ALL OK ! RMOC E2E Step 5 - process POR for SVTPI’s E2E Step 6 - retrieve TM from DDS & check

9 RSOC System Testing Status - 9 Short-term Schedule –Source test-files needed by PI-teams for end-to-end test will be available on ‘livelink’ on 28th June 2002. –PI-teams will make simple modifications to test files and transfer them to RSOC as a TC-Sequence -Update-Request (EDF file) and an OIOR (ITL file) by 5th July 2002. –RSOC will generate TC-Sequence-Update files for ESOC (Excel files) and a consolidated POR expressing the GLEP operations for the whole payload. (Due 15th July 2002). –ESOC will perform these GLEP operations as part of SVT 1.2 (first week August 2002) –PI-teams will retrieve TM data from DDS and analyse it to confirm expected GLEP operations were performed. Results will be reported by 16th August 2002. –Draft Pointing & Interference inputs from PI-teams shall be available by TBD in July.