DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos 29-30 november 2010 Présenté par : JP. Marcovici Sigle.

Similar presentations


Presentation on theme: "DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos 29-30 november 2010 Présenté par : JP. Marcovici Sigle."— Presentation transcript:

1 DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos 29-30 november 2010 Présenté par : JP. Marcovici Sigle : LATMOS GETCU (Groupe d’Expertise Technique de la Charge Utile)

2 DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 2 SUMMARY GETCU in the PICARD ORGANIZATION LIST OF TASKS CONTROL THE HEALTH STATUS OF THE PAYLOAD NEW PAYLOAD OPERATIONS SUPPORT FOR SPECIFIC PAYLOAD OPERATIONS MEMBERS ORGANIZATION ACTUAL STATUS FOR EACH TASK

3 DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 3 GETCU IN THE PICARD ORGANIZATION GETCU LATMOS IRMB PMOD

4 DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 4 LIST OF TASKS OF THE GETCU The tasks of the GETCU concerns the 4 instruments PGCU, SODISM, SOVAP and PREMOS The main tasks of the GETCU are : -Analyze the data periodically in order to have a payload health status report -Define a new payload configuration after data analysis and in order to get a more optimize configuration -Give technical support for testing new procedures (Mission Center or Command Control Center) -Correct and update the flight operating software

5 DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 5 PAYLOAD HEALTH STATUS REPORT (1/3) The health status report contains - an excel file with the main status for operating modes - values of housekeeping for PGCU, SODISM, PREMOS, ALIM (text and grafics) - alarms produced at CMSP - List of science TM which are missing The study consists in examining this report in order to - alert the expert if something seems not normal - anticipate an alert an decide for instance to change the configuration (example deviation between the SES and SODISM etc…) The report is produced each week for GPOM and each month

6 DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 6 Example of content : array about SODISM shutter PAYLOAD HEALTH STATUS REPORT (2/3)

7 DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 7 Example of graphics : PREMOS Heater Temperatures PAYLOAD HEALTH STATUS REPORT (3/3)

8 DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 8 NEW PAYLOAD CONFIGURATION SODISM Adjust Thermal parameters for SODISM Adjust parameters of survey (Flight and ground) Adjust some TC parameters (duration of open shutter, etc…) SOVAP Calibration sequence PREMOS Calibration sequence Backup of detector Thermal parameters Heater configuration

9 DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 9 SUPPORT FOR SPECIFIC OPERATIONS (AT CMSP) It is necessary to separate minor procedure changes (example to test a period of 10 minute for open/close PREMOS shutters) From major procedure changes (example to have a new scientific mode) Major changes: must be approved by GEVP at least and it must be checked that there is no significant impact on the payload (thermal, electrical) What is written in the SIO 1.LATMOS provides a description of the requested operations in simple terms 2.CMS-P translates it into a detailed text procedure 3.LATMOS validates the detailed procedure 4.CMS-P generates the TC groups corresponding to the valid procedure 5.LATMOS validates the TC groups on the LATMOS test bench (PGCU-SODISM EM, SOVAP MQ, PREMOS EM) and gives a report 6.If OK the new procedure is ready to be uploaded on satellite

10 DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 10 MEMBERS OF GETCU FonctionNom% Affecté Manager of the group Flight software, programming new procedures Analyze housekeeping and preliminary report Command control payload expert JP Marcovici100% (included PICARD Sol) Expert SODISM instrument Thermal payload Electric consumption payload M Meftah 85% (is also project manager of PICARD Sol) Quality Plan Electronic support for mechanisms SODISM S Abbaki50% (included PICARD sol) Expert Flight software Analyze housekeeping and preliminary report AJ Vieau20% (40%  31/12/2010) Expert SOVAP (IRMB)A Chevalier Expert PREMOS (PMOD)D. Pfiffner Support for analyze of data and test for new procedures at LATMOS LATMOS engineer >=20% from 1/1/2011

11 DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 11 CNES Technical support for the flight software Alimentation and thermal of the payload Manager for PICARD MIGS OPS service GEVP Support data treatment Optical support OTHER External expertise (electronic PGCU, expertise SODISM, flight software…) EXTERNAL SUPPORT

12 DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 12 Interface LATMOS with SOVAP and PREMOS Permanent dialog by Email, and contact Necessity to have monthly teleconferences (LATMOS, SOVAP and PREMOS) in the future The next one must be organized before end of January In the commissioning period, LATMOS had three meetings but concerning only SODISM, and CNES dialogued directly with SOVAP and PREMOS ORGANIZATION OF THE GROUP

13 DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 13 STATUS FOR EACH TASK OF THE GETCU GROUP (1/2) Health status report We must add a SOVAP report status and a report about the quality of SODISM images PASS New payload configuration Well defined in ICD document OK Specific operation Wish to adapt GETCU (LATMOS) contribution PASS Correct and update the flight software Quality and validation test well defined No correction to do OK Dynamic of the group It is really necessary to have Meeting with IRMB and PMODPASS

14 DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 14 STATUS FOR EACH TASK OF THE GETCU GROUP (2/2) About new procedure and the flight operating software 1) The flight software was specified in order to allow a lot of possibilities (SODISM test mode for instance) 2) SODISM SOVAP and PREMOS are driven independently (except synchronization possibilities) Even with this two facilities, it seems not easy to play new modes or new procedures due to different constraints


Download ppt "DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos 29-30 november 2010 Présenté par : JP. Marcovici Sigle."