Status of shaper prototype production B.G. Cheon (Hanyang U)‏ Dec. KEK 1 st open meeting of the Super KEKB Collaboration.

Slides:



Advertisements
Similar presentations
FCMAT Response & Preparation: Process Outline October 25, 2006.
Advertisements

Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
ESODAC Study for a new ESO Detector Array Controller.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
TDR2 FM board tests D. Haas Test Setup Test Procedure Functional tests Results Test Schedule.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
31st July 2008AIDA FEE Report1 AIDA Front end electronics Report July 2008 Progress Virtex5 FPGA choice Milestones for prototype delivery.
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
SuperKEKB 1st open meeting 1 Belle calorimeter upgrade B.Shwartz, on behalf of BELLE calorimeter group.
INTRODUCE OF SINAP TIMING SYSTEM
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
AGATA Pre-processing team report AGATA Week, July 2008.
Electronics/DAQ for SVD2+SVD3 KEK, 17 Nov 2004 Manfred Pernicka, HEPHY Vienna We want to investigate penguins!
1 Engineering Design - A general approach. 2 Outline Form a group Proposal (Presentation and 1 st Mandatory Meeting) Milestone A (Demo A and 2 nd Mandatory.
1 FTK Rear Transition Module Mircea Bogdan The University of Chicago March 9, 2015 Production Readiness Review.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
ECL trigger for Super Belle B.G. Cheon (Hanyang U)‏ KEK 1 st open meeting of the Super KEKB Collaboration.
Front-end readout study for SuperKEKB IGARASHI Youichi.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
Status of NA62 straw electronics Webs Covers Services Readout.
AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ECL electronics status and plan Vladimir Zhulanov, Yury Usov BINP, Russia
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
Electronics for Range System Prototype Tests A. Piskun ITEP, Moscow, 28 April, 2010.
Jan. 25, 2011 Status of the Aerogel RICH Readout Trig/DAQ Meeting in Beijing 1 S. Nishida (KEK) S. Nishida Status of the Aerogel RICH Readout Belle II.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Overview B A B AR L1 DCT Upgrade FDR Masahiro Morii Harvard University Scope of the Project Current Status Schedule  Commissioning.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
Electronics for Range System Prototype Tests
14-BIT Custom ADC Board Rev. B
SCHEDULE Nov 1st - Assembly Table Complete
LLRF Controls Outline Requirements External Interfaces Schedule Design
ECAL electronics schedule
Slice Test Planning Schedule(s) and Milestones.
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Trigger session report
CMX scope and functionalities
3rd Open Meeting of the Belle II Collaboration
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
HallD Collaboration Meeting Jefferson Lab December 11-13, 2003
RPC FEE The discriminator boards TDC boards Cost schedule.
SVD group organization, schedule, milestones
Presentation transcript:

Status of shaper prototype production B.G. Cheon (Hanyang U)‏ Dec. KEK 1 st open meeting of the Super KEKB Collaboration

52 TKO crates Keep TKO system or Use VME system

Informal meeting Date & place : KEK Attendents : A. Kuzmin,Y. Usov (BINP) I. Nakamura (KEK) B.G. Cheon (Hanyang) S.Y. Kim (Notice-Korea Co.)‏ Discussion item : on prototype production and mass-production of ECL Shaper in Korea. NKC has been involved in Belle ECL trigger modules production. NKC plan to work on ECL trigger module R/D for Super Belle.

Meeting Minutes Production term : 2-3 months depending on the availability of shaper- related electric parts in the market.  Delayed couple of weeks due to minor tuning of board design. Final confirmation should be done with Y.Usov if schematic diagram and PCB layout are ready.  Done correctly. Two modules will be produced for 1 st VME-type prototype test. Two turns of prototype production until final mass-production module. Mass-production module should be ready by the end of 2009 in terms of anticipated mass-production schedule(~2 years). Mass-production in Korea will be positively discussed later.

Current Status A schematic design had been based on TKO version. Some modifications were performed after the discussion with Y.Usov. Purchase of all the parts was done in Oct. Board layout (9U-size, 6-layers) was finished in Nov. Schedule of the 1 st prototype board production/test PCB production : done in Nov. Soldering : done in this week. Basic test : 2 weeks (power line and analog part w/ pulse gen.)‏ Shipping to KEK : End of December (if no mistake is found)‏ Detail test : from KEK Revision of the board (production of the 2 nd prototype) will take much short term because we already have all parts and much less effort is necessary.

New VME Shaper board Preamp Input shaper FADC analog processor & sum communication

Backup Slide

Final trigger (23)‏ sBelle ECL Trigger electronics PD+ Preamp Shaper FAT ( FADC+ FPGA)‏ TMM ( FPGAs)‏ GDL Monitor analog sum (12)‏ Gb serial link (52)‏ SEQ