The ILC IR John Amann ILC Mechanical Engineering 09/12/06.

Slides:



Advertisements
Similar presentations
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
DISTINCTIVE DIFFERENCES Rousseau vs. ____________.
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
A. Hervé - 13 august 2007 ILC-IRENG Meeting of Working Group A: 13 Aug 07 Proposal for an Experimental Area With only One Large Shaft A. Hervé/CERN.
HYDROFORMING PROCESS SHORT DESCRIPTION DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from John Andersen.
1 IR Hall for GLD Oct Y. Sugimoto KEK. 2 Underground hall HybridPure CMS IR hall area (WxL)25x55 Beam height8.6 Crane max hook height20.5 Largest.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
The ground must push up as hard as the building pushes down
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
FAA/NASA Joint University Program for Air Transportation Research Jeff Dickman Chris Bartone June 20, 2003 A New Anechoic Chamber for Nearfield Antenna.
ILC CFS / CLIC CES Studies for the Interaction Region : - An action was given at the Geneva Linear Collider Meeting for CFS to develop a more in-depth.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
Introduction to a pit-less lever scale “concrete deck” The scale to be shown is a B-Tek Side/rail Side/lever electromechanical Platform is 60’x11’ on.
MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Thoughts about LDC Hall and Assembly (Work is not finished.
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
Date Event Global Design Effort 1 Platform Moved on Hillman Rollers, Deformations John W. Amann ILC – Mechanical Engineering 9/12/07 IREng07.
SiD Platform Deformation Studies John Amann ILC Mechanical Engineering 11/21/06.
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
1 May 22, Y.Sugimoto Update of detector hall in mountain region.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
CES Studies at CERN for the Interaction Region : -Summary of Linear Collider IR meeting at CERN held on 16 February Design Brief for external design.
Design Development Drawings 1. Code analysis: examine needed changes 2. Draw accurate existing plans/model 3. Indicate demolition 4. Indicate new wall.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Summary of Platform and Hilman Rollers Deformation Studies John Amann ILC Mechanical Engineering 7/11/07.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
CLIC Civil Engineering Update
LBNF CAD models, Drawings and Component list
Updated Design of Detector Hall
Detector Utility/Service Cavern
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Escalator Installation
Experimental hall design in Japanese site
Interaction Region Alternative Layouts
Building Planning and Drawing
INSTALLATION SEQUENCE
SiD Muon Yoke Structure - Deformation Studies -
Detector Service Cavern for ILC
Design Concept Update – Platform Moved on Hillman Rollers
Detector hall in mountain regions
Status of Cryogenics Facilities Design
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
CLIC Civil Engineering Update
Structural Drawing Chapter 19.
Radiation Physics requirements for the IR
Detector hall in mountain regions
RDR Baseline Layouts for Interaction Region
Concrete A structural material made by combining cement, sand, aggregate, and water.
Roof design Bunker Project CDR
Neutron guide Shielding Concept
How well do you know these industry terms?
Presentation transcript:

The ILC IR John Amann ILC Mechanical Engineering 09/12/06

IR Requirements Comparison Table ItemBCD from VC Surf. Asm. CCR SiDLDCGLD IR Shaft Crane1kt x 22kt x 2600t120t?(1.2kt) Surface Assembly Crane 80t x 2400t?(400t)2kt400t IR Hall Crane20t x 4400t x 2?(400t)80t400t Largest Piece for Surf. Asm. 600t490t~350t IR Hall Size (w x l x h) 32x72x42m30x100x35m30x48x28m30x82x?m 30x45x?m 32x72x?m IR Shaft Size15m 9m may work15m (14x8)20m Full Surface 16m Hybrid Surface Assembly Building Size 30x100mTBD Other Shafts9m service cavern Amann – 09/12/06

About Cranes Cranes >100t are custom engineered = $$$. Cranes <100t are off the shelf standard = $. Cranes have a duty rating = +/- $. Crane support structure cost scales with capacity. A 400t crane will require a support structure and foundation on the scale of a steel mill = $$$. Amann – 09/12/06

SLC Collider Hall 100 ton Bridge Crane Hook Height = Runway Height 5-10m Additional Clearance Needed Above Runway Amann – 09/12/06

SLC Collider Hall 100 ton Bridge Crane Bridge Crane has an Effective Area Due to Size of Trolley and Cross Beam 100 ton > Effective Area > 400 ton Amann – 09/12/06

PEPII IR2 50 ton Bridge Crane Amann – 09/12/06

About Curtain Walls It has been proposed to use a single collider hall separated into two detector regions by a removable 3m concrete wall. In order to accomplish this, a combination of stacked concrete blocks topped with a retractable curtain wall will be required. Amann – 09/12/06

PEPII IR2 Curtain Wall Curtain Wall Fully Retracted Into IR Hall Amann – 09/12/06

PEPII IR2 Curtain Wall Curtain walls need a runway. Runway rail is embedded into concrete support. To maintain small gap between curtain wall and the IR hall surfaces the bridge crane runway should be embedded and not a freestanding steel structure. The above will require a IR hall with a robust concrete structure. In general, a curtain wall will require a smooth finished IR cavern to maintain a small gap between the curtain wall and the IR hall walls and ceiling. Amann – 09/12/06

PEPII IR2 Curtain Wall Close-up of Runway Support Structure Amann – 09/12/06

IR Hall and Surface Assembly Building Cutaway View of IR Hall/Surface Assembly Building Amann – 09/12/06

IR Hall and Surface Assembly Building Right Side View Amann – 09/12/06

Other IR Hall Needs Compressed Air - need required PSI, CFM, moisture content, locations H2O supply – potable, non-potable AC Power Distribution – welding sockets 500 amp, other 480/240V sockets. Machine Shop, Welding Area, and Tool Crib VESDA and Fire Suppression IR Hall Lighting O2 Deficiency Monitors Clean Room – how big, what class? Materials Storage Area Amann – 09/12/06

Questions to Think About IR Hall - rectangular box or curved cavern? Surface assembly building - size and orientation? BDS tunnel height above IR Hall floor – what constrains this? Curtain Wall – required thickness? Amann – 09/12/06