MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

Similar presentations


Presentation on theme: "MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished."— Presentation transcript:

1 MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished yet. Sorry for confusing pictures) General LDC/TESLA detector assumption Moveable Shielding Questions: Hall Width Underground Hall Size Beam Position  Question: Separating Shielding Wall  Question: Shielding Block Material Garage Position  Question: Electronic Location  Question: Shaft Position Question: Orientation Surface to Underground Hall Surface Assembly

2 MEA Machine and Experiment Assembly 2 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 General 2000t parts are not easy to handle! CMS needs 1day to close one yoke ring! (Goal: ½ day) Do not forget: Escape routes Scaffolds, Lifts (scissor or cherry pickers) Cables and other supply lines (to the detector and at the walls) Supports I assumed 3m space arround the open detector!

3 MEA Machine and Experiment Assembly 3 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 LDC/TESLA detector assumptions Reasonable fast access to the inner detector Access to the vertex detector without breaking the machine vaccum Picture from “Mechanical Concept of the TESLA Detector” (LC-DET-2001-045)

4 MEA Machine and Experiment Assembly 4 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 LDC fully open (Beam Pipe Exchange)

5 MEA Machine and Experiment Assembly 5 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Q: Hall Width ? Not rectangular shape! 25m seemed to be okay!

6 MEA Machine and Experiment Assembly 6 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Detector in Beam Position Q: Shielding Wall ? Shielding Wall 3,5m separating the detector hall Gap at the top Why is it necessary? Do we have access to the hall with the beam on or not? Do we have two categories of worker: * radition worker * non radiation worker? (Only 2m for the machine, but could be changes!)

7 MEA Machine and Experiment Assembly 7 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Moveable Shielding Shielding Portals are impossible with the thicknesses (≥3m) demanded at the moment.  C-shape movable shielding (or C-I-shape) and move transverse At TESLA at thickness of the shielding of 2m was required. The gap between the detector and the fixed shielding was closed with a huge portal.

8 MEA Machine and Experiment Assembly 8 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Detector in Beam Position Q: Shielding Wall ? No Shielding Wall But 5.5m Shielding (Mistake: 3+3.5=6.5)  Shielding Material (?) Heavy Concrete (3.7t/m³) insteed of Normal (2.35t/m³) saves 20% thickness at HERA (~90º to the beam) 6.5m*0.8=5.2m (Only 2m for the machine, but could be changes!)

9 MEA Machine and Experiment Assembly 9 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Detector in Beam Position Shielding modifed (Similar picture) 4m for Machine C- and I-Shape Overlaps at the Gaps  E-Trailer smaller

10 MEA Machine and Experiment Assembly 10 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Detector in Garage Position (It was a surprise for me!) Q: E-Trailer ? It is in way! Alternativies: Split it Electronic Cavern At the yoke Q: Allowed cable length? (Detector to Electronic) Q: Necessary space for electronic? Q: Cable route for the inner detectors? (Along the support tube?)

11 MEA Machine and Experiment Assembly 11 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Detector in Garage Position Q: Shaft Position ? NO!

12 MEA Machine and Experiment Assembly 12 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Detector in Garage Position Q: Shaft Position ? Move it around!

13 MEA Machine and Experiment Assembly 13 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Detector in Garage Position Q: Shaft Position ? Best position with E-Trailer! (?)

14 MEA Machine and Experiment Assembly 14 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Detector in Garage Position Q: Shaft Position ? Nearly best position without trailer! (?)  5-10m more length

15 MEA Machine and Experiment Assembly 15 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Detector in Garage Position Q: Shaft Position ? Best shaft position without trailer! (?) Only trailer problem left Q: But how the stair case and the elevator in the shaft?  Turn rectangle and all detector rings (?) Q: Second shaft? Safety

16 MEA Machine and Experiment Assembly 16 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Surface Assembly It would be possible! (Attention: HERE Surface Hall 90º to Underground Hall) (In case of a shallow hall I would stick to the TESLA concept)

17 MEA Machine and Experiment Assembly 17 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Summary Garage Position incorporated Underground Hall size: 55m x 25m; Shaft at the endOKAY Surface Assembly CMS style OKAY GLD style (I have not fully understood)Possible Open Questions: Where Electronic and Auxiliary Caverns? (Size?) Radiation Shielding Separation Wall: No (or Yes?) Tickness? Surface Hall Orientation? ………..

18 MEA Machine and Experiment Assembly 18 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Detector in Beam Position Shielding modifed 4m for Machine Overlaps at the Gaps  E-Trailer smaller


Download ppt "MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished."

Similar presentations


Ads by Google