R.Bailey, LHCCWG, January 2007 LHC Commissioning Working Group 2006 Presented to LTC in November and MAC in December Presented to LTC in November and MAC.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
LHC status and commissioning plans. LHC in 4 slides Lest we forget Progress to date Present schedules Consequent plan for 2008.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Stefano Redaelli Beam Department - Operations Group Operational Aspects of the Phase II Crab Cavity System LHC-CC09 3 rd LHC Crab Cavity Workshop European.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
RBAC Content: LHC Operational Mode Piquet Roles RBAC Strict LHC Operational mode and CMW Acknowledgements: Pierre C., Wojtek S., Stephen P., Lars J., Verena.
General Information New members in ABP (RTL): –M. Samson Restructuring should be finalized by the end of the year to be effective for beginning of the.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Running scenario 2009/10 Run through components – and then synthesis.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
LHC Commissioning Status Gianluigi Arduini CERN – AB Department For… 23/10/20081LHC Commissioning Status - G. Arduini.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Report Technical Director Storage-Ring-Installation Completed
ICE SECTION The coolest place to be! Elias Métral
LHC Commissioning with Beam
Minimum Hardware Commissioning – Disclaimer
Installation of an Instrument on a CERN machine
The HL-LHC Circuits: Global View and Open Questions
LHC schedule.
The LHC - Status Is COLD Is almost fully commissioned
Long Shutdown for the LHC: Vacuum Beam Pipes
Friday 15th June 01:11 Injection.
Consequences of warming-up a sector above 80 K
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Powering from short circuit tests up to nominal
Summary of week 7 Hardware Commissioning:
Status of the BLHC ….work in progress! Mike Lamont CERN/AB 18/01/2008
Disabling Rules.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Overall commissioning strategy for protons (estd. 2005)
LHC Beam Operations Past, Present and Future
Machine Protection System Commissioning plans
LHC installation status
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
ThomX – Commissioning Meeting – 25/01/2018
Thursday Morning/Afternoon
Hardware Commissioning
Beam commissioning plans, 2007 and 2008
Review of hardware commissioning
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

R.Bailey, LHCCWG, January 2007 LHC Commissioning Working Group 2006 Presented to LTC in November and MAC in December Presented to LTC in November and MAC in December

R.Bailey, LHCCWG, January th meeting of the LHC MAC (7-9 December 2006) Executive summary … Beam Commissioning Plans We are pleased to see the thoroughness of the work of the LHC Commissioning Working Group, LHCCWG, in laying plans for commissioning of the LHC. The general strategy for the initial 2007 run at 450 GeV is sound. The expressed goals are appropriate. The MAC urges the leadership of the laboratory to give high priority to completion of the thorough and systematic investigation of beam and system behavior before beginning the shutdown for hardware commissioning to high energy operation. This may well mean extending the run into We urge particularly that careful study of beam capture and stabilization during ramping to some modest energy above 450 GeV be carried out before the shutdown to investigate snapback effects. Initial experience with the collimator system adjustment will also be valuable. Wide experience shows that from such systematic studies many things will be learned about controlling the machine properly. Further, inadequacies and important but unanticipated malfunctions will be revealed so that they may be rectified during the shutdown. …

R.Bailey, LHCCWG, January Triplets During the pressure test of Sector 8-1 (25th November) the heat exchanger tube in the inner triplet failed at 9 bar differential pressure During the pressure test of Sector 8-1 (25th November) the heat exchanger tube in the inner triplet failed at 9 bar differential pressure A repair procedure is being validated and will have to be implemented on all 24 quadrupoles (18 are already installed) A repair procedure is being validated and will have to be implemented on all 24 quadrupoles (18 are already installed) Baseline: Replacement and installation of new HX tubes Baseline: Replacement and installation of new HX tubes Plan B: Repair of existing tubes by inserting an HDPE/inox reinforcement in tube extremities followed by a pressure test. Plan B: Repair of existing tubes by inserting an HDPE/inox reinforcement in tube extremities followed by a pressure test. Repair performed in the tunnel without displacement of any of the installed magnets or DFBX. HX removal/insertion from open interconnects Repair performed in the tunnel without displacement of any of the installed magnets or DFBX. HX removal/insertion from open interconnects Restart interconnection and installation activities this week Restart interconnection and installation activities this week Completion of repair of triplet 5L in time for pressure test and cooldown of Sector 4-5. Completion of repair of triplet 5L in time for pressure test and cooldown of Sector 4-5. Consequence Consequence Sector 8-1 will be cooled down and commissioned after 4-5 Sector 8-1 will be cooled down and commissioned after 4-5 Sector 8-1 will be commissioned only to 450GeV in 2007 Sector 8-1 will be commissioned only to 450GeV in 2007 Planning will have to change Planning will have to change 450GeV run still the target 450GeV run still the target Hardware commissioning to high energy in 2008 will take longer Hardware commissioning to high energy in 2008 will take longer

R.Bailey, LHCCWG, January QD circuit RAT ( Réunion Avancement Travaux ) point 8, January 26 th RAT ( Réunion Avancement Travaux ) point 8, January 26 th There is a short to ground localized on the quadrupole circuit Q21L8 that is going to be detected. D.Bozzini will continue the investigation this morning. The cooldown is on standby waiting until new situation. There is a short to ground localized on the quadrupole circuit Q21L8 that is going to be detected. D.Bozzini will continue the investigation this morning. The cooldown is on standby waiting until new situation. RAT ( Réunion Avancement Travaux ) point 8, January 29 th RAT ( Réunion Avancement Travaux ) point 8, January 29 th The short to ground found last week disappeared on Saturday 27th at 3:50am. Nonetheless, it was already localized on Friday 26th to be in the interconnection between C21L8 and C22L8; the resolution of such localization is not yet sufficient to tell if it is in the interconnect or in the lyra. The short to ground found last week disappeared on Saturday 27th at 3:50am. Nonetheless, it was already localized on Friday 26th to be in the interconnection between C21L8 and C22L8; the resolution of such localization is not yet sufficient to tell if it is in the interconnect or in the lyra.

R.Bailey, LHCCWG, January Committees ICC Starts Feb 2 nd Starts Feb 2 nd Every 2 weeks Every 2 weeks Lyn as Chair Lyn as Chair Roberto (DC) Roberto (DC) Roger (SS) Roger (SS)LTC Steve plans to focus LTC on LHC beam commissioning Steve plans to focus LTC on LHC beam commissioning Role of LHCCWG may need modification Role of LHCCWG may need modification "The LHC Installation and Commissioning Committee will closely monitor, at the project management level, the final stages of installation and the intimately linked hardware and beam commissioning phases of the LHC machine. Aiming at commissioning the LHC as a team, it will co-ordinate across all departments and will have members directly involved in these activities. It will meet every fortnight on Friday mornings and, as an evolution of the TCC, will also deal with the remaining issues of planning and Engineering Change Control."

R.Bailey, LHCCWG, January 2007 So what should we do in 2007? - A - - A - Continue elaboration of commissioning plan in LHCCWG Finish run through of commissioning phases Two beam operation Details of the ramp Measurements needed at top energy Collisions at top energy Documentation and procedures Based on what we heard in 2006 Verena and EICs doing this Discussion and follow up needed Other follow up Prioritise open action list Treat high priority actions Two major axes - B - Get more involved in the Accelerator Systems side Hardware commissioning Power tests of main circuits (with HCC) Individual system tests (with HCC) Things not covered by HCC Integration into operation From IST to operation Control from the CCC Operation with beam Elaborate details of ‘Q4 2007’ Hardware commissioning Machine checkout Beam

R.Bailey, LHCCWG, January 2007 Accelerator systemsResponsibleLHCCWG Technical Services TI operations P.SollanderNot needed ControlsH.SchmicklerNot needed Electrical supply F.Rod Mateos Not needed Cooling and ventilationJ.Inigo-GolfinNot needed Access & safety systemsT.PetterssonPC Hardware Commissioning CryogenicsL.SerioGA, SR, WV Main Ring Magnets PerformanceA.SiemkoWV, MG Insertion Magnets Performance R.Ostojic WV, MG PIC B.PuccioWV, JU QPS K.H.Mess WV, JU Power convertersF.BordryWV, JU Beam Commissioning VacuumN.HilleretRA, FZ, GA Magnetic ModelJ.P.KoutchoukWV, MG, SF Machine Protection SystemsR.SchmidtJU, JW Radiation ProtectionD.ForkelWirthRA, PC Radiation monitoringT.WijnandsRA, PC Beam TransferV.MertensSee details RFT.LinnecarSee details Beam InstrumentationR.JonesSee details CollimationR.AssmannRA, SR High level controlsM.LamontSee details OperationsR.BaileySee details Accelerator physicsO.BruningSee details Experimental ConditionsH.Burkhardt

R.Bailey, LHCCWG, January 2007 #DateTopics 1January 31Summary of 2006 work and outline for 2007 (Roger) Beam measurements at 450GeV  Summary of parameter tolerances (Frank)  Proposed beam measurement program in 2007 (Frank)  What to do if we cannot get in tolerance (All) 2February 14Alternative filling schemes (Werner) Implications for the injectors (Elias) Documentation and procedures – injection and first turn 3February 28Magnetic model meeting  FiDeL (Luca)  WISE (Ezio)  LSA (Marek) Behaviour of the magnets through the squeeze (Walter) Documentation and procedures March 14OP visit to LNGS 4March 28Optics measurements needed at top energy (Frank) Collisions at top energy, luminosity determination and optimisation (Helmut) Commissioning of accelerator system - BLM (Laurette) Documentation and procedures Meetings Q1 Aim for meetings every 2 weeks as before Aim for meetings every 2 weeks as before Interleaved with LTC (proposed dates may have to change slightly) Interleaved with LTC (proposed dates may have to change slightly)

R.Bailey, LHCCWG, January 2007 #DateTopics 5April 11Beam excitation meeting  Controlled transverse blow up with pink noise (WH/MM)  Using the damper (Wolfgang)  Status of the AC dipole (Javier)  Using the AC dipole (Stephane)  Using the Aperture kickers (Frank S) Commissioning of accelerator system - Vacuum (Frank) Documentation and procedures 6April 25Details of the ramp (Mike, what’s needed here?) Commissioning of accelerator system - RF (Magali) Documentation and procedures 7May 9MAD-X online model (Frank Schmidt) Commissioning of accelerator system - Magnets (Walter) Documentation and procedures 8May 23Report from MPSC subgroup (Jan) 9June 6 10June 20 Meetings Q2 To be scheduled sometime To be scheduled sometime 2 beam operation (Jan, Ralph) 2 beam operation (Jan, Ralph) Beam losses and radiation monitoring for steering the beams in collision during the engineering run at 450GeV (and at high energy?) (Thijs) Beam losses and radiation monitoring for steering the beams in collision during the engineering run at 450GeV (and at high energy?) (Thijs) Beam commissioning experience (CNGS, LSS6, LSS4/6 extraction) (Brennan) Beam commissioning experience (CNGS, LSS6, LSS4/6 extraction) (Brennan)