Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Annual Review Meeting - Introduction.

Slides:



Advertisements
Similar presentations
GMD German National Research Center for Information Technology Darmstadt University of Technology Perspectives and Priorities for Digital Libraries Research.
Advertisements

Alvis status report: Index DataMike Taylor Alvis status report: Index Data Check out the exciting things to come! 1. Technical contribution.
UCSC History. UCSC: A brief history 60s University Placement Committee A lot of field trips/interaction with employers.
Information Society Technologies Third Call for Proposals Norbert Brinkhoff-Button DG Information Society European Commission Key action III: Multmedia.
PROCESS FRAMEWORK Lecture - 3. Topics covered PROCESS FRAMEWORK PROCESS MODELS DIFFERENCE.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Probabilistic Adaptive Real-Time Learning And Natural Conversational Engine Seventh Framework Programme FP7-ICT
DR MACIEJ JUNKIERT PRACOWNIA BADAŃ NAD TRADYCJĄ EUROPEJSKĄ Guide for Applicants.
State Planning Organization Internship Programme in UVER State Planning Organization DG Regional Development and Structural Adjustment Department of Monitoring.
Spring Depository Library Council March 31, 2008 U.S. Government Printing Office FDsys Update.
Presentation Outline  Project Aims  Introduction of Digital Video Library  Introduction of Our Work  Considerations and Approach  Design and Implementation.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP3 – Retrieval systems.
Knowledge Science & Engineering Institute, Beijing Normal University, Analyzing Transcripts of Online Asynchronous.
Role of Management and Technical Coordination
Intégration Sémantique de l'Information par des Communautés d'Intelligence en Ligne ISICIL.
Roles and Responsibilities
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP8. Dissemination & Exploitation Josh Reiss, Project Coordinator Betty.
1 Framework Programme 7 Guide for Applicants
London February, 28 European Commission Information Society and Media Annual Meeting Annual Meeting GaLA Game and Learning Alliance The European Network.
Geoff Payne ARROW Project Manager 1 April Genesis Monash University information management perspective Desire to integrate initiatives such as electronic.
The Preparatory Phase Proposal a first draft to be discussed.
European Network of Excellence in AI Planning PLANET II -- An Overview -- Susanne Biundo University of Ulm, Germany.
Break Dengue in a Nutshell. WHAT WE WILL DO? Joint all forces against Dengue Leverage the power of social movements Be a pilot for other NTD fighting.
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
Multi-agent Research Tool (MART) A proposal for MSE project Madhukar Kumar.
Software System Engineering: A tutorial
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP8. Dissemination & Exploitation.
WP7 - Architecture and implementation plan Objectives o Integrating the legal, governance and financial plans with technological implementation through.
Transregional Workshop – Sofia, October 30, 2008 R4R Tools and Methodologies.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Summary A recent study found that almost 65% of all commercial ships have multinational crews. Over 10% of the fleet has crews with members from five.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
18 Month Review Meeting Project # Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management Josh Reiss,
CPLA Video Case Studies Making Media Nursing. Making Media - Background First year, semester long 20 credit core module Involved 200 students with 4 staff.
1 st -4 th December st BioXHIT Annual Meeting WorkPackage 5.2: Implementation of Data management and Project Tracking in Structure Solution Peter.
Dunstaffnage Marine Laboratory Oban, Argyll, Scotland PA37 1QA ECASA Kick-off Oban 8-9, December 2004.
Europe’s network of excellence for public libraries, museums and archives at local level Rob Davies, MDR Partners, Project Manager
WP4 – Sound Object Identification WP5 – Enriched Access Tools.
CLARIN work packages. Conference Place yyyy-mm-dd
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP2 – Media Semantics and Ontologies.
Case study of a successful proposal Rob Davies. Parts of a proposal Part A - Proposal Administrative Overview - forms Part B- Description of objectives.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
Project overview objectives, work plan, milestones and deliverables Mark Stevenson, University of Sheffield Kate Fernie, MDR Partners PATHS Final Project.
EASAIER Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Ying Ding.
End-to-End Efficiency (E 3 ) Integrating Project of the EC 7 th Framework Programme General View of the E3 Prototyping Environment for Cognitive and Self-x.
Geneva, November 2013 Speaker: Peter Keinz
NCSR “Demokritos” Institute of Informatics & Telecommunications CROSSMARC CROSS-lingual Multi Agent Retail Comparison Costas Spyropoulos & Vangelis Karkaletsis.
A Resource Discovery Service for the Library of Texas Requirements, Architecture, and Interoperability Testing William E. Moen, Ph.D. Principal Investigator.
Soon Joo Hyun Database Systems Research and Development Lab. US-KOREA Joint Workshop on Digital Library t Introduction ICU Information and Communication.
© Services GmbH Project work plan 2/20/ St. Petersburg, May 18, 2011 Dr. Andrey Girenko
Fabio Nascimbeni ESPAQ Monitoring, Evaluation and Quality Assurance ESPAQ Project Meeting 21 October 2015.
BHL-Europe Biodiversity Heritage Library for Europe – ECP-2008-DILI – Kick-off meeting – Berlin – May 2009www.biodiversitylibrary.org Biodiversity.
MICHAEL Culture Association WP4 Integration of existing data structure into Europeana ATHENA, WP4 Working group technical meeting Konstanz, 7th of May.
E-ARK Co-ordinators Report Current status and way forward #earkproject Janet Delve / Kuldar Aas / Clive.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Avena genetic resources for quality in human consumption (AVEQ) Startup Meeting, Clermont Ferrand 2007 Federal Centre of Breeding Research on Cultivated.
WP5: Semantic Multimedia
Roles and Responsibilities
Strengthening of Internationalisation in B&H Higher Education
UNISEC Universal Influenza Vaccines Secured
University Career Services Committee
INTAROS WP5 Data integration and management
SEEDS Kick-off meeting May 6, Lausanne Bojana Tasic Renate Kunz
ESSnet on SDMX phase II Laura Vignola
Civil Protection Financial Instrument – Prevention Projects
BioMedBridges – Work Packages 2 & 12
CORA ESSNet COmmon Reference Architecture starting ...
Technical and Advisory Meeting
Presentation transcript:

Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Annual Review Meeting - Introduction

12 Month Review Meeting Project # Objectives and Assessment I ObjectiveDescription Relevant Deliverables Separation & Representation of Sound Objects 1. Demonstration of working prototypes. D2.1, D4.1-D Publication of technical papers which are peer reviewed. 3. Measurement of accuracy in international evaluation conferences. 4. Evaluations against ground-truth databases. 5. Direct comparison with baseline algorithms. 6. User evaluation studies. Content Processing for Interactive Tools 1. Demonstration of prototype content processing algorithms. D Publication of technical papers. 3. Verification of user requirements as defined in established user needs studies. 4. User evaluation studies. 5. Expert Advisory Board Evaluation. 6. Direct comparison with baseline algorithms. Online Retrieval Systems 1. Publication of new retrieval technologies. D , D Demonstration of prototype Retrieval Systems. 3. Test bed user group deployment. 4. Music retrieval system assessment by MIREX 5. Speech retrieval system assessed using internal archives & the On-Line Speech Corpora.

12 Month Review Meeting Project # Objectives and Assessment II ObjectiveDescription Relevant Deliverables Organizational Tools for Tailored Collections 1. Creation and dissemination of visualisation and navigation systems. D2.1,D Merging of archives from members of the Expert User Advisory Board. 3. Ontologies and description schemes assessed by demonstrating the usefulness of proposed structures as well as user group evaluation. 4. Publication of technical papers which are peer reviewed. Measure Effectiveness and Impact 1. Formal evaluations & deployment to external sound archives. D , D , D Feedback from the Expert User Advisory Board. 3. Collaborations established and reported (co-authored publications), joint conferences or workshops, visits and exchanges. 4. Inclusion of major archival institutions on the Expert Advisory Board. 5. Development of Business Plan. Overall Project Assessment 1. Successful management and project administration. D , D Detailed and timely reporting to the Commission. 3. Deliverables and Milestones achieved as stated. 4. Quality assurance maintained and risks avoided.

12 Month Review Meeting Project # System

12 Month Review Meeting Project # Architecture

12 Month Review Meeting Project # Meeting Structure  Each presentation discusses  Introduction to Work Package  Deliverables and Milestones  Progress  Contributions and Connections with Other Workpackages  Upcoming Work Plan (Months 12-24)  All technical work packages have demonstrations

12 Month Review Meeting Project # Schedule TimeParticipantWP leadDemonstrations 9:00-9:15Introduction & Presentation of Project Participants 9:15-9:45RSAMD WP7 Evaluation & Benchmarking Video Highlights of interviews with expert users 9:45-10:30LFUI/DERI WP2 Media Semantics and Ontologies Ontology engineering & ontology-based searching 10:30-11:15ALLWP3 Retrieval Systems Speech segmentation user interface, vocal queries & music retrieval system 11:15-11:30Coffee Break 11:30-12:15NICE WP4 Sound Object Representation Speaker recognition application: Build voice print from wav file, recognize speaker and playback 12:15-1:00DITWP5 Enriched Access Tools Real-time sound source separation, pitch scale modification with synchronized video, restoration EQ module 1:00-2:00Lunch 2:00-2:45SILOGICWP6 Intelligent InterfacesEASAIER front end 2:45-3:30QMUL WP8 Dissemination & Exploitation Report on dissemination activities 3:30-3:45Coffee Break 3:45-4:15QMULWP1 Project Managementreport on deliverables D1.1 and D1.2 4:15-4:45Financial and Management Issues 4:45-5:15Reviewers Meeting (closed) 5:15-5:45Feedback and final discussion