Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.

Slides:



Advertisements
Similar presentations
Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
MICE Beam Loss vs Particle Rate Adam Dobbs, ISIS Meeting, 18 th December 2009.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Particle Rate and ISIS Beam Loss Adam Dobbs, Target – ISIS Meeting, 17 th September 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
MICE Commissioning Issues Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO Meeting—RAL.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
MOM Report. Shield Wall – Gone Before During After 2.
Luminosity Monitors MICE Video Conference 7 May 2009 Paul Soler.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
CMPB Alain Blondel 14 April STATUS OF MICE.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
MICE Beamline Commissioning Linda R. Coney NFMCC Meeting 16 January 2010.
MICE Operations Manager Report Linda Coney University of California, Riverside UKNF Meeting June 8, 2010.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
MOM Report Victoria Blackmore VC /06/11 1/7.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
MICE Run Plan Sept/Oct 2009 m. apollonio – IC MACHINE PHYSICS USERs RUN NO SHIFT A B C D E.
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Early Results from Beam Line Studies Jean-Sebastien Graulich, Geneva
MICE Beamline Status m. apollonio 17 December 2009 MICE VC
MICE Operations Scenario Run 1
Luminosity Monitor Status
MOM Report + RUN PLAN m. apollonio – Imperial College
Presentation transcript:

Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009

Linda R. Coney – 24 Sept 2009 Outline  Last VideoConference  Target  Taking Data  Operations  Continued Run Plan  Progress Made

Linda R. Coney – 24 Sept 2009 At Last VC  End of August Shutdown  MICE getting ready to take data for first time in 9 months  New target reassembled, tested and in ISIS  Beamline tested  Getting detectors ready  MICE Rehearsal…  Since then:  1 week of Machine Physics  10 days of User Run  MICE again running a target in the ISIS beam  TAKING DATA!

Linda R. Coney – 24 Sept 2009 Data Taking Program  Machine Physics: u Run experiment while testing target  Pion beam at 333 MeV/c  Proton beam at 333 MeV/c  Muon beam at 252 MeV/c with Decay Solenoid and w/o  ISIS activation study  Beam Loss vs Particle Rate Study  Use GVA1, TOF0, TOF1, FNAL BPMs, CKOVs, and now KL  USER RUN: u Working on DAQ issues s Running at higher particle rate – DS operational, high loss levels in ISIS s Necessitates changes in DAQ to accommodate high particle rate u Pion beam at 330 MeV/c – Decay Solenoid beam dynamics study s Nominal setting at 550 A (3.1 T) s 9 settings higher and lower in steps of 0.15 T s Only required ~60 target pulses/point to get sufficient counts in TOF0

Linda R. Coney – 24 Sept 2009 Target Operations & Data Taking  Pulsed 50,000 in test stand in R78  Installed in ISIS u Run for 12,000 pulses..inspected – PASSED u Run for 10,000 pulses..inspected – PASSED u Run for 20,000 pulses..inspected – PASSED  Target is working beautifully – NO problems  Target Operation: u Machine Physics – 5 days of MICE running u User Run – 3 days  Target operation Studies u Search for ideal timing wrt ISIS cycle u Search for ideal depth into beam u Found edge of beam at injection for purposes of understanding what we need to avoid on the outswing of our target u Took data with modified voltages on capacitor bank u Studies with ISIS running at 50 Hz (Normal User Run conditions)

Linda R. Coney – 24 Sept 2009 MICE IN ISIS  Without and with MICE Target at 2V

Linda R. Coney – 24 Sept 2009 Target Operations  Target I stability from 5 Sept 2009  All plots to follow show characteristic two peaks (exact capture position). The two peaks are always the same distance apart mm - corresponding to the resolution on the optical readout of 0.15 mm. The widths of the peaks has not changed since the start of running in ISIS on 5/9/09

Linda R. Coney – 24 Sept 2009 Target Operations II  Target I stability from 16 Sept 2009  deltaD for 5 th =.13 and for 16 th =.12  Running at same depth – consistent behavior

Linda R. Coney – 24 Sept 2009 Target Operations III  Beam Center Distance over Evening shift Wednesday  Shows the time series for the last run, patchy because we were stopping and starting the target a lot.  The important thing is the BCD consistency.

Linda R. Coney – 24 Sept 2009 Target Operations IV  Beamloss (in Sector 7) for the entire Activation Study run (13 hr)  Note that there do seem to be two distinct peaks although Paul has only fitted a single gaussian.

Linda R. Coney – 24 Sept 2009 Target  Target Group at MICE

Linda R. Coney – 24 Sept 2009 MICE Timing  New tool to understand MICE timing wrt ISIS

Linda R. Coney – 24 Sept 2009 Taking Data  MICE at work

Linda R. Coney – 24 Sept 2009 Sept 6 Data  Run 945 Sept pion beam 333 MeV/c with 400mV losses  protons

Linda R. Coney – 24 Sept 2009 Sept 6 Data  Run950_Sept062009_protonBeam333MeVc_D2nominal

Linda R. Coney – 24 Sept 2009 Sept 12 Data Preliminary: Beam Loss vs Particle Rate Study  first draft,  means of distributions judged by eye, no error calcs, etc  full analysis is to follow  rates of beam loss seem very high because not yet been calibrated to nominals u last time the reduction factor was about 0.4, PH thinks more this time.  unsure at present as to what units have for the GVA1 (why are no units for them, again to be sorted out for full analysis)

Linda R. Coney – 24 Sept 2009 Beam Loss vs Particle Rate  Not the full story  Problems with GVA1 trigger  Problems with GVA1 detector at very high rates  Need to rerun study – plan to use TOF0 as counter

Linda R. Coney – 24 Sept 2009 Beam Stop Open!  Remote operation of Beam Stop

Linda R. Coney – 24 Sept 2009 Sept 10 Data  Run 972 Sept pion beam 333 MeV/c with 500mV losses  protons

Linda R. Coney – 24 Sept 2009 Sept 10 Data  Run977_Sept102009_piBeam333MeVc_400pulses

Linda R. Coney – 24 Sept 2009 Sept 12 Data  Run1006_Sept122009_pimuBeam MeV/c 120 pulses

Linda R. Coney – 24 Sept 2009 Recent Data  Beginning to calibrate TOFs  Last year’s data……………..This year…  Making progress..need more data..

Linda R. Coney – 24 Sept 2009 Operations I  Updated documentation - DONE  Some trips of beamline magnets u usually trip on power supply water flow  DAQ – See talk by Vassil u having some trouble with new fADCs u Possible timing issue with TDC and fACD signals u Possible fix this week  “invalid” alarms problem – FIXED!

Linda R. Coney – 24 Sept 2009 Operations II  Electrical u Sent list of typical magnet current combinations to Daresbury u Calculations being done to determine if running near limits of distribution box on wall  Shifters u New list of instructions for novice shifters – Paul Harrison will upload to MICE shifter schedule website u New shifter folder with operating instructions and safety class requirements u Shifters need to be prepared before arriving in MICE LCR for shift! s Big responsibility, full time attention required, mistakes could be critical  eLOG u Still hanging and making operations difficult u Need it to work smoothly u Moving to heplnw17 this week – mirror on MICE website from IIT  Slow ramp on beamline magnets u In progress

Linda R. Coney – 24 Sept 2009 Next  Run Plan for this week: u Commission Decay Solenoid – DONE s Pion optics - Scan through decay solenoid current settings s Compare beam profile in detectors to simulation u Commission FNAL BeamProfileDetectors - DONE u Commission DAQ s Adjust to higher particle rate s Change TOF0 trigger to AND of two planes instead of OR s Set up TOF1 trigger – necessary due to increased particle rate s Figure out why TDC and fADC information for particles not saved appropriately s Commission TOF1 and KL DAQ s Check with Analysis code u Calibrate TOF system s 330 MeV/c pion beam, 150 MeV/c e+ beam, 100 MeV/c e+ beam u Optimize Upstream Beamline s Marco and Chris Rogers s Optimize Q1-Q3 s Move quads to maximize rates in detectors

Linda R. Coney – 24 Sept 2009 Conclusions  Within the last month:  We are running again  New target  Higher loss limits  Decay Solenoid Operational! Routinely used.  Detectors working  DAQ work ongoing u NOTE: Last year < 50 particles/spill, Now: over 200 u This is why we need to spend time working on the DAQ  Good NEWS – u Learning a LOT u We have seen MUONS!