NPDgamma Liquid Hydrogen Target Safety Review Operating Procedures At LANL November 29-30, 2005.

Slides:



Advertisements
Similar presentations
Coach Air Conditioning
Advertisements

OPERATING EFFECTIVELY AT WESD. What is Internal Control? A process designed to provide reasonable assurance the organizations objectives are achieved.
NERT College Disaster Operations Disaster Operations - ICS Command Staff Workshop Refer to Field Operations Guide, Chapter 5.
How to Document A Business Management System
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Progress and Plan for Superconducting RF Cavity RF Group.
Working with refrigerants After studying this chapter, you will be able to Purge system with nitrogen. Pressurize system for leak detection Describe different.
NPDgamma Liquid Hydrogen Target Safety Review Project and Safety At LANL November 29-30, 2005.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Applied Science Division MICE Prototype Control System T W Bradshaw April 2004 MICE Proto Control System Organisation.ppt.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
MICE Hydrogen System MICE Collaboration Meeting, CERN, 29 March-2 April 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
XEC Hardware Status MEG Review Meeting 2010 Liquid Xenon Group.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
NPDgamma Liquid Hydrogen Target Safety Review At LANL November 29-30, 2005.
Patrick Thornton, SNS/FPE June 9, 2008
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
NPDGamma - LH2 Target - Relief/Ventline Systems Seppo Penttila NPDGamma Project Manager Predicted A  =5x10 -8 We are aiming to 10% measurement.
LHC HARDWARE COMMISSIONING SAFETY TRAINING DAY S. Claudet (AT-ACR-OP) With great help from G. Lindell (Safety commission) CRYOGENICS.
ISO OPERATIONAL CONTROL
The 2nd NPDGamma Experiment Safety Review - Liquid Hydrogen Target Seppo Penttila NPDGamma project manager June 09, 2008 SNS.
1 Liquid Hydrogen R&D test report Video Conference – 23/08/12 S Watson P Warburton M Courthold.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
HD target.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Some notes about liquid Hydrogen target 1.How it operates 2.Modification Target length, empty mode 4.Status.
Lab Team Jobs Why have specific jobs? Can one person do all the jobs well?
Reser- Voir Turbo Pump 1 Five- Fold Turbo Pump 2 Scroll Pump1 Scroll Pump2 Tgt. Cham- ber N2N2 H2H2 P2 P1 P3 P4 P5 P6 Panel Tgt. Cell V2V1 V3 V0 E0 E1.
MICE hydrogen review Approval process. Process Working group Document pack PPD Director & ISIS Director Prerequisite testing Completed action list Approval.
Exhaust to atmosphere G1 V1 V2 V3 LN2 Storage Vessel 150 l Dewar Cryostat Exhaust to atmosphere Nitrogen or helium gas bottle LN2 Circuit for MIT Test,
Mechanical Integrity Equipment Deficiencies. Lesson Objectives  Describe Actions When Equipment Deficiencies Found in Operating Equipment  Describe.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
NPDgamma Liquid Hydrogen Target Safety Review Warning Alarms and Interlocks At LANL November 29-30, 2005.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
The LH2 target has to be in the para-hydrogen state. At room temperature H2 is 75% ortho and 25% para. To catalyze the conversion between ortho and para.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
SOME CEDAR NEWS Lau Gatignon / EN-MEF TD meeting 12/07/2011  Summary of HAZOP and Zoning meeting  Forthcoming CEDAR related work at CERN.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
1 Liquid Hydrogen R&D test report CM34 – 17/10/12 S Watson P Warburton M Courthold.
WEEK 6 Introduction to Project Management. Agenda Phase 4: Controlling.
Planning for Sustainability 1 Susan Ramsey Pearls of Wisdom Consulting Lia Katz ASTHO (202)
Ruben Carcagno, Sandor Feher, George Velev (team leader) MQXFS1 status meeting Summary of the MQXFS1 Investigation.
ESS Vacuum Standardization
CSNS cryogenic system Institute of High Energy Physics Guoping Wang June 21, 2016.
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
Section 2: Safety, Tools and Equipment, and Shop Practices
1.3-GHz Cavity Vacuum Furnace at IB4
Accelerator Operations Department Readiness (Part 2)
MICE Meeting at RAL, Oct-23, 2005
Project Manager’s Report + DC/MoM Report
Update on HW commissioning
Action People Time [h] Shutting down the SR 2 1
Overarching Commissioning Plan
Operator Training Requirements
Instructions: Adding refrigerant fluid to system
DRAFT ISO 10007:2017 Revision Overview Quality management – Guidelines for configuration management ISO/TC176 TG 01.
NPDgamma Liquid Hydrogen Target Safety Review
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

NPDgamma Liquid Hydrogen Target Safety Review Operating Procedures At LANL November 29-30, 2005

DRAFT Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Version 0.03 November 26, 2005

A. Evacuation and flushing of the target and lines with hydrogen B. Filling and Cooling the Target with Hydrogen C. Warming up the Hydrogen Filled Target to Room Temperature D.Purging Hydrogen out from the Target Vessel and Filling the Lines with Helium E. Change of Empty Hydrogen Gas Cylinder Procedures for shed operation:

DRAFT Auxiliary Operating Procedures for the NPDGamma Liquid Hydrogen Target System in TA-53, Building MPF- 35 Version 0.01 November 26, 2005

- Target cool down without hydrogen - Leak checking and purging - Operation of the RGA - To put ortho-para converter catalyst Fe(OH) 3 into the chambers and activation - Test and calibration of hydrogen monitor - Interlock conditions - Charging CVI refrigerator with helium - Charging CRYOMECH refrigerator with helium - Target Procedures Liquid nitrogen trap bake out Global Purge of GHS with Helium Target helium leak check Target Pump down Continuous target monitoring and leak checking Steady state target filling States when target gets filled - Operating Target Subsystems Leak checking and purging Instrumentation & Control

Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35: Update/Revision Procedure The NPDGamma Liquid Hydrogen Target Team Leader has a lead responsibility for initiating and coordinating reviews and updates to these operating procedures. 1.Minor administrative, organizational, and grammatical changes and error corrections etc. identified through a use of the procedures will be incorporated into the Procedures by the Team Leader. A summary of changes and revisions will be documented in the Change Log of this document. 2.Baseline changes or other major changes. If a baseline given in this document of the Procedures has been changed then the new procedure has to be approved as described in JHA ID 3501 “Testing of the NPDGamma Liquid hydrogen Target”. RevisionDateDescription of ChangePages changed Signature /26-05Baselinen/aSePe

1. Introduction …….. The highest level of the LH 2 Target safety is defined by the Integrated Work Document JHA ID 3501 “Testing of the NPDGamma Liquid Hydrogen Target”. ….. The procedures of this document must be followed and the defined tasks can be performed only by authorized target operators. The authorization is given by the responsible line manager as discussed in JHA ID 3501 “Testing of the NPDGamma Liquid Hydrogen Target”. …….