1 MICE Meeting at RAL, Oct-23, 2005
Absorber R&D Progress KEK S. Ishimoto, S. Suzuki K. Yoshimura Osaka Univ. Y. Kuno, A. Horikoshi MICE Meeting at RAL, Oct-23, 2005

2 MICE Absorber System with Cryocooler
G-H2 cylinders/H2 tank/ Metal hydride He refrigerator L-He Dewar G-H2 safety exit and reservoir tank L-N2 Dewar He, N2 gas exit/return G-He cylinders Exit to cool the transfer tube H2 leak monitor Absorber vacuum system Safety exit for H2

3 MICE Absorber Room Temp. Magnet Bore L-H2 OUT L-H2 Level Sensor
Thermometers Lake Shore CX-1050-SD L-H2 IN 2-Heaters Lake Shore HTR

4 Test Cryostat at KEK -- Original Plan
MICE Cryocooler RDK-415D MICE Test Absorber

5 Absorber Test Subjects at KEK
Test Absorber  Real Absorber #1, #2, #3 (1) Absorber leak test at 20K and 4.2K * body, pipes, In seal … (2) LH2 absorber (< 1 L) * pre-cooling process with LN2 or without LN2 * cooling speed, warm up speed * cooling power and heat leak test (3) LHe absorber * pre-cooling process with LN2 or LHe * How much additional Lhe, if it needs? (4) Instrumentation * LH2 level and temperature sensor test * control and DAQ (5) Real window test at 20 K?

6 Test Cryostat with Test Absorber

7 New Parts (1) Needs Modify > Aluminum plug at top
> KF25 & pipe on window Needs Parts on/in Absorber > Flexible pipes > LH2 level sensor > Thermometers > G10 supports

8 New Parts (2) Needs Parts around condenser > LH2 condenser body
> Flexible pipes > Thermal links > Feedthrough

9 Top Flange & Absorber Support

10 H2 Condenser Cryocooler Cryocooler Bottom Flange Indium/Grease
- Copper Flange; T=6 mm - Screws; 6-M5 on copper - Weight 2~3Kg Mechanical design Good thermal contact LH2 Supply 5 mm higher than bottom to keep LH2 level KEK LH2 target

11 KF40 + 48 pin + LH2 Level sensor
Feedthrough at 20K LH2 VAC KF pin + LH2 Level sensor

12 Test Cryostat with MICE Absorber #1,#2,#3
Vac. Pump + Gate Valve

13 Test Cryostat with MICE Absorber
Needs pipe joints

14 Absorber Test Cryostat
Cryocooler

15 Absorber Test Cryostat

16 Parts (1)

17 Absorber is now at the company to modify the top port and window.
Parts (2) Fix and Flexible Tubes Test Absorber Absorber is now at the company to modify the top port and window. G10-SUPPORT

18 Parts (3)

19 Summary Test items at KEK
(2) The Cryocooler, test absorber, T.M.P. and vacuum gauges were temporally assembled to decide pipe length. (3) The LH2 condenser and related parts were designed and ordered. (4) Flexible and fixed pipes were designed and ordered. (5) Feedthrough (48pins) were ordered. (6) We will start the parts assemble from mid-November. (7) Absorber cooling starts this year 1st test; Cryocooler + H2 condenser cooling test 2nd test; with absorber cooling test 3rd test; cooling power and heat leak test  LHe absorber test