Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 15 Publication No. FHWA-HRT Bicycle Lanes.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Southern Corridor Study Recommendations March 16, 2011.
Newport South Beach Peninsula Refinement Plan. Newport South Beach Peninsula Located on the south side of the mouth of the Yaquina Bay and the crossing.
City of Ashland Transportation System Plan Update September 6 th, 2012.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Harrisburg Area Transportation Study Cross-river Connections Study Capital Area Cross-River Connections Study prepared for Harrisburg Area Transportation.
Contact: Beth Morris
Pedestrian and Bicycle Concerns About Highway Design and Operation Barb Mee, AICP City of Asheville Transportation Department
Florida Department of Transportation, November 2009
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
February 19, 2015 Design Guidelines to Accommodate Pedestrians and Bicyclists at Interchanges Draft ITE Recommended Practice: Meghan Mitman, AICP Senior.
Maintenance and Protection of Traffic (MPT) – HDM Ch 16.
Walking and Biking the Busiest Roads Around Atlanta: a Bike/Ped Plan that establishes non-motorized transportation among regional-scale priorities Regan.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Land Use Study for the Community of Winchester July 9, 2012.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Instructions  Check in with Andrew Bomberger at TCRPC to let him know what muni you will be visiting so he can give you any specific info for that muni.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.
County of Fairfax, Virginia Department of Transportation VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps Board Transportation.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TYLER MEYER, AICP 2015 AMPO Conference Clark County, NV October 2015.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Complete Streets Training
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Elliot Road Extension design critique and recommendations Petition to the Town of Chapel Hill Bicycle and Pedestrian Advisory Board March 25, 2014 Geoffrey.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
Complete Streets Training Module 4b – Designing for All Users.
Project Management Team Meeting #3
Col. Pike Multimodal: About the Project
District 3 Complete Streets Projects
River to Sea TPO Meeting US 92/International Speedway Boulevard
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Alex Henry FDOT District Seven Safety Office
Presentation transcript:

Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan

Corridor Study Area (Garfield St. to South Valley View Road) I-5 – East

3 Background……  Lower current volumes than anticipated;  Overall – counts are15-20% lower than 2008 counts;  Incomplete pedestrian pathways; Transit Route highest in the Rogue Valley – little or no access to transit stops, many are non-ADA compliant; 80% of sidewalks are either missing or don’t meet ADA standards.  More emphasis on Multi-modal aspects from local communities Shift in paradigm: From Auto/Truck centric to Bike/Pedestrian/Transit; Lane reconfigurations from rural 4-lane to 3-lane; Possible Bus Rapid Transit-lite route.  Financial Constraints Cost prohibitive to build to full standard (ROW and Utility Relocation)..

Lower volumes throughout…… 15,600 14,900 18,000 18,600 LEGEND 12,800 12,200 15,100 16,100 14,300 13,600 16,800 18,500 4,800 4,600 5,800 6,100 7,700 7,300 8,700 9,500 14,300 13,700 17,500 18,000 15,800 15,000 18,000 18,100 7,200 6,800 8,400 9,300 4,800 4,600 6,200 8,300 7,900 10,000 10,900 9,200 8,800 11,000 10,900 8,200 7,800 10,000 9,800 8,800 8,400 9,300 9,400 18,200 16,600 18,700 19, Volume (vehicles) 2012 Volume (vehicles) 2007 Volume (vehicles) 2004 Volume (vehicles)

Ideas and Concepts Developed from feedback at TAC and CAC meetings and requests for additional analysis from various agencies, in addition to significant feedback from the public. Concepts identified and presented: –Better access to transit facilities; –Improved lighting; –Charlotte Ann Rd to Coleman Creek Culvert – Implement a 5-lane Cross-section and Add Bike Lanes and Sidewalks; –Coleman Creek Crossing - Add Bicycle and Pedestrian Facilities; –Phoenix South End of Couplet to South City Limits - Implement a 3-lane Cross-section and Add Bike Lanes and Sidewalks; –Phoenix South City Limits to Talent – Implement a 3- lane Cross-section and Widen Shoulders; –Talent to Ashland – Implement a 3-lane Cross- section and widen shoulders; –Enhanced Bear Creek Greenway Connections and improved signage along the corridor.

6 Charlotte Ann Rd to Coleman Creek Culvert Implement a 5-lane restriped section and add Bike Lanes and Sidewalks Implement a 5-lane restriped section and add Bike Lanes and Sidewalks N 70-foot ROW in many sections; Paved width is 66 to 72 feet; 5 travel lanes ; Transit stop improvements; Volume too high for 3-lane (est. future 17,000 to 22,000 ADT); Restriping is more feasible; Minimal ROW needed for additional sidewalk improvements;

Current Conditions (Medford to Phoenix)…..

8 REAL PEOPLE/REAL IMPACTS: Bob Byram (U.S. Army, Ret.) Photo Credit(s): Gary Leaming, ODOT R3 PIO.

Charlotte Ann Road to Coleman Creek Concept(s): Option A - Lane restriping and sidewalk infill - $4.0 million; Option B - Widening to full standard - $9.7 million; Recommendation: Option A

Phoenix South End of Couplet to South City Limits: Implement a lane conversion adding Bike Lanes and Sidewalk N 75-foot ROW available; Paved width is 50 to 52 feet; 4 travel lanes; Improve existing transit stops; Modify roadway to include: –6-foot bike lanes on both sides; –12-foot travel lanes and 14- foot center lane; Add sidewalks on both sides (could include landscape buffers within ROW). 12' TravelLane 12' TravelLane 6' Bike Lane 6' Sidewalk 6' Bike Lane 6' Sidewalk 14' Center Lane 50'Paved Surface 3 LANE CROSS-SECTION 64' MinimumRight of Way Required

Phoenix South City Limits to Talent Implement a lane conversion and widen shoulders N 70-foot minimum ROW available; Paved width is 50 to 52 feet; 4 travel lanes, no shoulders No change in paved surface Convert to a 3-lane cross section: –7-foot shoulders both sides –12-foot travel lanes and 14-foot center lane Wider shoulders (7-10 feet) accommodate bicyclists or pedestrians and allow vehicles to pull off the roadway, if necessary 3-lane cross-section has lower predicted crash rate than 4-lane cross-section

Current Conditions (South of Phoenix to Talent….)

Enhanced Bear Creek Greenway Connections and Signage N

Other Improvements and considerations……. 1.Transit 1.Possible BRT/BRT Lite concepts 2.Improve efficiencies along corridor (Transit Signal Prioritization) 3.Integrate Bus-pullouts and transit stops along 3-lane segments 2.Phoenix Couplet - Downtown improvements and changes to couplet 1.Reconfigure from 2-lanes either direction to 1-lane 2.Add/improve sidewalks and bike lanes as well as connectivity 3.Improving transit stops on both sides of couplet 3.South Stage Overcrossing 1.Preliminary Analysis – lesson traffic/congestion at Fern Valley and Garfield St. 2.No additional projects needed on OR 99 if constructed. 4.City of Talent/ODOT STIP Project – Rapp to Creel Road 1.STIP - (complete street design, 3-lane configurations (sidewalks and bike lanes) from a Rural 4-lane configuration) 2.Out to bid in 2016 (currently on-hold) 5.Talent to Ashland Segment 1.Repaved in Talent Ave/Jackson County Parks intersection 3. Improved Shoulders

Questions? 15

Thank you. 16