©Railinc 2010 All Rights Reserved Car Accounting Self Service Project Mark Aldenderfer, Business Analyst II 1.

Slides:



Advertisements
Similar presentations
Recruitment Booster.
Advertisements

Practice Insight Instructional Webinar Series Eligibility Manager
Presenter: Lisa Butts Watco Companies Modified from ASLRRA Car Hire Training Class A special thanks to Lance (my youngest son) for helping me with the.
1 © 2013 Railinc Corp. All rights reserved. R ECLAIMS Presented By: Chauncey Fallen Manager-Transportation Services GATX Corporation- Rail.
©Railinc 2010 All Rights Reserved Weston Parkway, Suite 200, Cary, NC – Industry Initiatives: What is Railinc.
ACACSO Meeting Las Vegas – May 10, 2013 Scott Churchill CSX Transportation ACACSO Meeting Las Vegas – May 10, 2013 Scott Churchill CSX Transportation.
Copyright © 2011 Railinc Corp. All Rights Reserved Industry Projects and the RPSWC Process 1.
TOL’s All You Need to Know ACACSO, Austin TX Nov 10 – 12, 2014
Car Hire Rule 5 and Car Hire Rule 15 Transfer of Liability © 2007 Railinc. All rights reserved.
Car Hire Claims Workshop 101 November 13, AGENDA 8:30 to 8:45 Introductions & Attendance 8:45 to 9:00 AAR Certification on Car Hire Claims Discussion.
Union Pacific Railroad Future Car Accounting Process Linda Newell - Gen Dir ECommerce, Mike Carmichael - Sr Mgr Car Acctg, Lori Wies - Mgr Car Acctg May.
RAILINC I ACACSO
RAILINC I ACACSO
May EAC meeting Schedule 2011 The dates of the meetings changed so that EAC meetings will occur approximately two weeks before the Business Services.
Railinc Vision of the Future of Car Hire Mark Aldenderfer, Business Analyst ACACSO November 12, 2010.
Dale Cassels – Manager Car Accounting CSX Transportation.
©Railinc 2008 All Rights Reserved 1 Railinc Corporation – 7001 Weston Parkway, Suite 200, Cary, NC – Update on Umler/EMIS.
RAILINC I ACACSO
1 Railroad Clearing House for Car Hire ACACSO May 7, 2008 Chicago, Illinois Anthony Glover.
Damaged and Defective Car Tracking ACACSO May 12, 2010 © 2010 Railinc. All rights reserved.
EAC Update ACACSO November, EAC meeting schedule for 2011 The dates of the meetings changed so that EAC meetings will occur approximately two weeks.
November  Cary, NC Oct. 4, 2011  Next meeting is in January via Conference Call.
Umler Project Status for ACACSO May 14, 2009 Full speed ahead towards the July 25 th implementation Full speed ahead towards the July 25 th implementation.
EAC Update for ACACSO November 2012 George A. Jones – Dir. Car Accounting and Disbursements CSX Transportation.
RAILINC I ACACSO
Copyright © 2011 Railinc Corp. All Rights Reserved. Car Hire Data Exchange (CHDX) Project Update (as of 10/31/2011) Alex Pritchett – Business Analyst.
UMLER ISSUES THAT AFFECT CAR HIRE ACACSO Meeting November, 2014 Patty Livingston Manager Fleet Administration Genesee & Wyoming Railroad Services.
CCCApply - CCCApply is the statewide online application center for California Community Colleges, streamlining the application process for students and.
PearsonAccess April 14, PearsonAccess – Agenda Order Tracking Additional Orders Student Data Upload (SDU) files New Student Wizard Online Testing.
EAC Update for ACACSO May 2012 George A. Jones – Dir. Car Accounting CSX.
RAILINC I ACACSO
RAILINC I ACACSO
RULE 4 UPDATE ACACSO Meeting Atlanta – November 14, 2013 Scott Churchill.
©Railinc 2010 All Rights Reserved Weston Parkway, Suite 200, Cary, NC – Damaged and Defective Car Tracking.
©Railinc 2010 All Rights Reserved Car Hire and DDCT Mark Aldenderfer, Business Analyst 1.
©Railinc 2010 All Rights Reserved Car Accounting Self Service (CASS) ACACSO New Orleans May 9-12, 2012 Mark Aldenderfer Railinc Business Analyst II 1.
RAILINC I ACACSO
RAILINC I ACACSO
Barbara Ward November 13, 2008 ACACSO Orlando, Florida Improving the LCS Process LCS UPDATE.
UMLER ACACSO Meeting May 10 th, 2012 Patty Oakley Manager Fleet Administration Genesee & Wyoming Inc.
RAILINC I ACACSO
LCS Report Card Mike Partica May 2008 Chicago, Il.
RAILINC I ACACSO
© 2010 Railinc. All rights reserved. Industry Projects & Vision May 9, 2012 New Orleans, LA Jim Pinson Railinc.
TRAIN II Event Reporting Association of Car Accounting & Car Service Officers May 11 – 13, 2011 Burlington, VT.
RAILINC I ACACSO
Texas Assessment Management System STAAR Alternate Manage Teacher Assignments.
Defect Damaged Car Tracking System Robert Sanford Manager Car Accounting Norfolk Southern.
1 © 2013 Railinc Corp. All rights reserved. R ECAP OF THE C AR H IRE R ULES ACACSO Workshop/Breakout Session Albuquerque, NM November 11 & 12, 2015.
PearsonAccess EOC Training
Training Documentation – Replacing GSPR with RFQ 2.0
Car Hire TOL’s ACACSO, Coeur d’Alene, ID May 11 – 13, 2013
Car accounting self service Overview
Centralized Car Hire Foundation User Support Project
Liability Continuity System (LCS) Update
Division of Air AirCom DARM’s New Compliance and Enforcement Database and Field Inspection Tool.
Cyber Recruiter: Sneak Peak
Car Hire Data Exchange (CHDX) Edits Project Update
Joe McClure Senior Manager Car Accounting
Suppressed Interchanges & Haulage
What Happens to Private Railcars – Follow-Up to Savannah
Antwan Dozier ACACSO May , 2018
ACACSO May 10, 2018 Kellie Bates Norfolk Southern
Serving Area Process ACACSO Conference May 10, 2018
Liability Continuity System (LCS)
Car Hire Rate Negotiation Self-Service 2016 Release Highlights
Damage Defective Car Tracking (DDCT) System
Car Hire Rule 4 Jim Pinson ACACSO May 7, 2014.
Equipment Quality Reporting System
TRAIN II Jim Pinson ACACSO May 9, 2014.
Presentation transcript:

©Railinc 2010 All Rights Reserved Car Accounting Self Service Project Mark Aldenderfer, Business Analyst II 1

©Railinc 2010 All Rights Reserved What We Will Cover Today Project Background Event Query for CASS Liability Acceptance Message(LAM) for CASS Project Update 2

©Railinc 2010 All Rights Reserved Project Background Many LCS related customer questions require significant research and time to answer –The CASS system will help in returning events associated with a LCS decision –More on Event Query later Railroads want a easy way to submit LAMs –The CASS system will allow a Railroad to easily submit a LAM through a web based system. –More on LAM creation later 3

©Railinc 2010 All Rights Reserved Goals and Objectives Give visibility into confusing car hire decisions created by LCS logic Reduce expenses in terms of time and effort researching LCS car hire decisions Reduce expense required to create and send Liability Acceptance Messages 4

©Railinc 2010 All Rights Reserved Event Query Theme The system will allow for the search of equipment movement events by –Searching for a single equipment –Searching using a date range up to 90 days The CASS system will have access to at least a years worth of events 5

©Railinc 2010 All Rights Reserved Home Page 6

©Railinc 2010 All Rights Reserved Event Results Page 7

©Railinc 2010 All Rights Reserved Event Detail Screen 8

©Railinc 2010 All Rights Reserved LAM Theme This special message type is used to accept car hire liability Can be sent as a TRAIN10, but is most commonly known as a TRAIN31 type 5 message Can be time consuming to create and send Not every Railroad has the ability to send 9

©Railinc 2010 All Rights Reserved LAM Theme Cont. TRAINII manual explanation for LAM –If event reporting has caused car hire responsibility to be assigned to a carrier other than the carrier to whom it belongs, a TRAIN10 or TRAIN31 message with an Action Code of 5 can be used to correct the assignment of car hire responsibility. This Car Hire Liability Acceptance report will result in an LCS gap record from the current responsible road to the road submitting the acceptance interchange event. 10

©Railinc 2010 All Rights Reserved LAM Theme Cont. CASS system will validate LAMs using todays logic –The system will check in insure that no LCS evaluated event has been posted after the time of the Type 5. –If LAM is accepted the system will look to determine when liability can be changed o If before the 6 th of the current month liability can be placed back to the beginning of previous month o If after the 6 th of the current month liability can be placed back to the beginning of current month 11

©Railinc 2010 All Rights Reserved Project Status Update The project is currently on schedule –The system will allow for searching new events up to events 90 days old –The system will allow for searching of old events past 90 days old by the end of iteration 2 Iteration two will be completed this week and iteration three will begin Monday of next week Work on the project is scheduled for completion on –October 25,

©Railinc 2010 All Rights Reserved CHDX Platform Upgrade 13

©Railinc 2010 All Rights Reserved CHDX Platform Upgrade Migration from Mainframe onto Mid-Range Platform Reduction of Support Costs Minimization of Manual Intervention Improved Processing Time Future Enhancements to the System are made Possible –Improved Data Quality –Risk Reduction 14

©Railinc 2010 All Rights Reserved Current Progress Preliminary Validations of Inbound File Format –Ensures that uploaded content is readable by the CHDX system Upload of a File via Web UI –Will Replace MyRailPartner Parsing of the EDI414 File –Needed for conversion into 1400 flat file 15

©Railinc 2010 All Rights Reserved Project Status Environment Set-up has been Completed (IT0) –The Proof of Theory of the Common DX has already been validated during the SSDX Project Iteration 1 began on April 26 th Project Completion Date: December 7 th First Month Utilized in Production: February

©Railinc 2010 All Rights Reserved 17 Questions? 7001 Weston Parkway, Suite 200, Cary, NC –

©Railinc 2010 All Rights Reserved 18 Contact us: RAILINC 7001 Weston Parkway, Suite 200, Cary, NC –