Bringing It In House. IndianTrailsSportsComplexexpansion.

Slides:



Advertisements
Similar presentations
Url: www. shahbuilwell.com Phone: ,
Advertisements

CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Titusville to Edgewater Bike Loop PD&E Study
Capital Improvement Plan May 8 th, 2013 Presented by City Administration: Public Works Department Finance Department.
City of Palm Coast- Flagler County Transportation Impact Fees City Council-Flagler County Commission Workshop.
 Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.
Gwinnett County’s Post Development Stormwater Management Program
Infrastructure Improvements Dependable infrastructure for CSUCI campus… Dave Chakraborty Director, Planning, Design & Construction.
PUBLIC WORKS ENGINEERING DIVISION HURRICANE RESPONSE RESPONSIBILITIES.
FY2016 Proposed Budget March 17, Fiscal Year 2016 Proposed General Fund Budget $133.4 million No Tax Rate Increase Proposed Current Rate:
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Light Emitting Diode (LED) Street Lighting. Strategic Action Plan 2014 & 2015 Performance Measures: Tracking FP&L Pilot Project on Palm Coast Parkway.
Engineering and Technical Plans Description, process and standards Dh 2005.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Improving Public Works Efficiency. Evaluating what we do: Are we doing the right work?
Community Development Department PALM COAST PARK SECOND AMENDED AND RESTATED DEVELOPMENT OF REGIONAL IMPACT DEVELOPMENT ORDER Application #2167.
Palm Coast’s Municipal Fiber-Optic Network: Project Update
Session Learning Objectives Facilities and Grounds by Harry Lorick Identify the benefit of facilities and grounds to the public Analyze the requirements.
Bringing It In House. IndianTrailsSportsComplexexpansion.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Do you raileze that the mnid is an ainazmg tihng? It msut be if you are rdaieng tihs. Wlel, it’s tmie to put taht anaimzg mnid to wrok aaign. We are in.
KEEP PALM COAST March 27, 2012 City Council Workshop.
CITY COUNCIL GOALS & OBJECTIVES. TOP PRIORITY Street Valley Gutters 33 installed by Public Works 35 installed by contractor Pipe Replacement Program.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Mid-Biennial Budget Modifications Budget Modifications Mid-Biennium Review Includes Changes to 2008 Only Requirements for Changes – Significant.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
 Prepared by  Prepared for  City of Palm Coast, Florida  January 27, 2015  Drainage Study Sections 30 & 34 for Development of City Wide Stormwater.
A ‘Plug’ for Electric Vehicles! Sally Herbert Sustainable Travel Officer Newcastle City Council.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
Project History and Background. Senate Bill Directed UDOT to Implement Traffic Traffic Signal Coordination Systems Established a Traffic Signal.
Community Development Department Construction Phase.
FINAL BUDGET CITY COUNCIL PUBLIC HEARING SEPTEMBER 27, 2011.
Community Development Department Construction Phase BULLDOG DRIVE.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
Signal Optimization Study Community Development Department.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
Public Works Department Operation & Maintenance Budget FY Budget Worksession July 15, 2013.
City of Palm Coast Northeast Corridor Projects. Northeast Corridor - Project Status Palm Coast Parkway Matanzas Woods Parkway Palm Harbor Parkway Extension.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
Maintenance Agreement with Town Center At Palm Coast Community Development District City Council Workshop February 10, 2015.
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Transportation Projects City Council Workshop May 14, 2013.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Community Development Department Royal Palms Parkway City Council Workshop July 29, 2014.
DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.
 Prepared by  Prepared for  City of Palm Coast, Florida  August 30, 2011  Drainage Study Sections 31 & 35/37 for Development of City Wide Stormwater.
Community Development Department Holland Park Renovations Playground & Splash Park Design.
Interlocal Agreement with Flagler County related to Airport Development September 16, 2014 City Council Meeting.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Building for the future. superior asset quality customer- preferred retailers.
Strategic Plan for Public Works Services and Operations.
City Council March 4, Capital Improvement Plan 1/14/2014Budget staff sent CIP forms and instructions to divisions 1/28/2014Projects submitted.
CITY COUNCIL WORKSHOP – APRIL 12, Strategic Action Plan Evaluation Results.
City Council April 1, Capital Improvement Plan 1/14/2014Budget staff sent CIP forms and instructions to divisions 1/28/2014Projects submitted.
Green Roof Technology Green roof technology is a relatively new advancement that consists of an installation of a layer of vegetation placed over a waterproof.
Construction Report May 19, Projects KMS Phase IIClose out –KMS CafeteriaClose out –KMS Renovations & AdditionsClose out –Royalwood Elementary.
1 Department of Public Works 08/09 Capital Improvement Program City of Newport Beach.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
City Council March 6, Capital Outlay Priorities Infrastructure  Reconstruction of Bell St. from Concho River to Old Ballinger Hwy  Reconstruction.
CP-TXT Amendment to the Capital Improvements Element (Annual Update) September 25, 2007.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
Signal Improvement Project COMMUNITY DEVELOPMENT DEPARTMENT
Fiscal Year 2017 Final Budget Workshop
Renovation & Expansion
Construction Management & Engineering
November Bond Election
Presentation transcript:

Bringing It In House

IndianTrailsSportsComplexexpansion

Financial Factors Availability of Employees Equipment Needed Time in Schedule Expertise

Belle Terre Parkway median beautification

Gateway/Neighborhood Sign – Palm Coast Parkway East Construction cost$135,581 Consultant’s estimate for completion by outside contractor$205,715 Cost savings to the public$70,134

Cost Savings Quicker No Change Orders More Control Greater Flexibility Availability of Crews During Emergencies

4 new fields at Indian Trails Sports Complex Our cost: $342,361 Outside cost: $440,000 Swale Rehabilitation & Maintenance Our cost: $8/linear foot Outside cost: $12/linear foot

Ditch Maintenance: 1,525,640’ in vs. 664,700’ in

$2,270,000

Maintenance, Repair, Renovation Swale Rehabilitation/Maintenance Work (including design)$1,054,000 Ditch Maintenance$249,000 Equipment Installation, Maintenance-Utility Division$83,000 Communication Equipment Maintenance and Repair$14,000 Smoke Testing$13,000 Playground Renovations (Community Center, Holland Park)$10,000 Swimming Pool Maintenance$5,000 Community Garden Reconstruction$4,000

New Construction/Design *Survey Services (*NOTE: the city has always done some survey work in-house)$243,000 Paths/Trails (construction) $113,000 Section 31 Phase 1 Drainage Rehabilitation (construction)$109,000 Drainage Pipes (construction)$101,000 Stormwater (design)$76,000 Neighborhood/Gateway Signs – East Palm Coast Parkway$70,000 Minor Road Construction – ITSC Roadway Extension$47,000 Valley Gutters (design and construction)$41,000 Median Beautification Program$13,000 Old Kings Road Reuse Main installation –Town Centerto Hidden Lakes$11,000

Technical Work Strategic Action Plan$10,000 Environmental Plan Reviews$4,000 Other Citywide Traffic Counts Lighting I-95 Ramps Office Renovations – City Marketplace Phases 1 and 2

Bringing It In-House! Watch for more in 2013 Questions?