UPDATE at SBU (Feb 24, 2009) 1 st Water Target SuperP0Dule (DaveF, Kevin, Scott) last week spent setting up hoses, pipes, water tank. Problem with unfiltered.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
Tests of the LH2 target at GSI 2 nd -4 th april 2014 T. Hennino, C. Commeaux (IPN Orsay) T. Heinz, E. Schwab (GSI) The LH2 target.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
TDR2 FM board tests D. Haas Test Setup Test Procedure Functional tests Results Test Schedule.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2004 IR-2 Installation Schedule H.J. Krebs October 22, 2003.
Cable and Service Installation David Warner Colorado State University May 11, 2009.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
TP4-ENERSOL-TD/PV double function
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
Today – Friday, March 15, 2013  Warm Up: Solving missing sides of right triangles or angles of right triangles  Review Solutions to Angles of Elevation.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
SCANNER THOUGHTS AND DESIGNS NN Group Dmitriy Beznosko| Stony Brook.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 17-Nov-2010.
April 13, 2015 What are we doing today? 10.3 – Solving Equations with Variables on Both Sides -Lecture and Vocabulary – Pg HW – Practice A - # 1.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Technical Support Activities in PH-ADO-PO
Engineer Training Ink Insertion TJ8300 / TJ8500 Ink Insertion.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
AMS-02 Magnetic Field Measurement Prof. Chin E. Lin, NCKU, TNN TIM Jan. 09, 2007.
Ships Service Air System
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
LEADERSHIP AND CAREERS Which career suits your leadership style?
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
SuperP0Dule Discussion US ND-280 Meeting August 16, 2008 D. Warner.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.
Chris Booth Sheffield 29th March 2006
Oil X Water Example of Oil/Water separation
Technical Coordination Parallel Session November 2011, FNAL
Service channels between Tracker and PP1
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Katsuro Nakamura Sep. 10, 2015 VXD meeting
Installation step 4. (3 days)
Radiation Laboratory Meeting
Installation plans from mid 2005
Question & Suggestions March 17th
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
After service guide for changing PCB
SNS PPU Cryomodule Space Frame
SC1R Cold Box PDR Assembly Sequence
Polarized 3He target installation
Presentation transcript:

UPDATE at SBU (Feb 24, 2009) 1 st Water Target SuperP0Dule (DaveF, Kevin, Scott) last week spent setting up hoses, pipes, water tank. Problem with unfiltered SBU was solved with additional filters. water filling started on Friday to ½ full, recommenced Monday, but stopped due to funny crackling sounds. DaveW recommends more bracing before continuing water level sensors will have to be removed before shipping and reinstalled in Japan (may cause some interference with cabling) needs to start cabling as soon as water test finishes 2 nd Water target SuperP0Dule 11 of 13 P0Dules now mounted, should finish by later today or tomorrow labeling can start next water fill test in Mar 9(?), waiting for parts 1 st & 2 nd ecal SuperP0Dules Dima has tested at TFB’s and started some LI tests plan to attach temp monitors (not all parts here? UW to ship this week?) utility rails need to be lowered into final position (need to have temp monitors) ears/bookends need to be attached hoses to be attached and vac. Loop test (few parts to be ordered)

UPDATE at SBU (Feb 24, 2009) continued Shipping date now finalized to April 15 (?) drop dead week, March 30 crating people move SuperP0Dules to basement on April 6 crated superP0Dule fly out of NY week of April 15 Remaining time for SBU assembly and check is **5 weeks** including this week two ECAL SuperP0Dules to be completed temp monitors, move utility rails to final position 1 st water target SuperP0Dule modify braces and finish water filling test (this week) start cabling top and sides, temp monitors TFB testing? 2 nd water target SuperP0Dule finish assembly tomorrow start labeling insert pipes and sensors (Mar 9 by UW people?) start cabling sides and top, temp monitors TFB testing?  guessimate of about 4 weeks of solid shift work needed to complete above Assuming no parts delays and no impact of new tasks on shifters Other parts; (Dave&Clark) lifting fixtures, covers, corner brace for shipping, etc.

Scott inserting pipes into Water tank Water level sensors and water pipes to Be inserted into the bags in the SP0Dule Kevin and DaveF attaching hoses to each pipe

Dave Forbush attaching sensor leads Detail of elbow connections in Water bag frames Trung, Chris, & Ian setting up braces before filling bags

Readout, being checkec before filling water bags. Scott, Dima, DaveF Kevin, and Bent. Note P0Dule on right being prepared for mounting on 2 nd water target SuperP0Dule