7 Jan 03 CFT+PS Weeks in Review Sequencer status –1553 communications issues may not be fully resolved –scanning still off Calibration –calibration database.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
1 Installation Review Stefan Grünendahl CTT Installation Plan Current status General plan Power supplies + permits Basic installation + checking.
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
DAQ System  We need to build a clone of the new test stand DAQ that is being put together at D0.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
AFE II Status. Analog Front-End (AFE) Board  Approximately 200 AFE boards are needed to readout CFT (&CPS/FPS) u 512 channel (2/cassette) u Analog output.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
High Sensitivity Smoke Detection
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
FPD Status and Data Quality Andrew Brandt UTA Q4 D S Q3S A1A2 P 1 UP p p Z(m) D1 Detector Bellows Roman Pot P 2 OUT Q2 P 1 DN P 2 IN D2.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
NIU Trigger Workshop CTT Commissioning Trigger Workshop October 22, 1999 WBS & Presented by Fred Borcherding for the D0 Electronics Group.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
10 Dec 02 CFT+PS Week in Review CFT_Gui broadcasts limited Calibration/DataBase issues Grounding changed on 6 AFEs Two AFEs replaced –SIFT gain variation.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Detector Decommissioning Related Activities at DØ George Ginther Fermilab and University of Rochester 23 January 2012.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
February 24, DØ’s VLPC Detectors: The Fiber Tracker and Preshowers Greg Davis University of Rochester.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
LKr status R. Fantechi.
RPC Front End Electronics
Presentation transcript:

7 Jan 03 CFT+PS Weeks in Review Sequencer status –1553 communications issues may not be fully resolved –scanning still off Calibration –calibration database complications continue –procedure updates in progress AFE related issues –continue effort to eliminate individual link problems –largest SIFT to SIFT gain variation board extracted –crate x51 VRB download challenge –isolate lower ground clips in attempt to reduce noise –timing studies –quiet time zero threshold data tick studies –discriminator threshold reduced from 1%+1pe to 1% Refrigeration issues –7A5 and DB7 heaters essentially off –east cryostat cold block temp reduced to 5.50K –west cryostat cold block temp reduced to 6.3K as test

7 Jan 03 CFT+PS Weeks in Review Trigger –slot 46 link problem due to sequencer backplane modified AFE boards installed to address problem –new CTTT firmware reports inclusive and/or terms –new transition boards installed –CTOC sender firmware updates –six of eight octants appear to be reading out properly –CTT examine CPS –Calibration studies in progress FPS –LED pulser studies of waveguide routing –map updated FPD –north sequencer power supply swap –FPD sequencer installed –VRB installed in crate x52 –an (improper flavor) AFE board installed –electronics database updates ready

7 Jan 03 Dmitri’s Info on Shutdowns 3.5 week shutdown in January Shutdown starts during owl shift Monday 13 Jan –store terminated at Jan 2003 Lab wide power outage 0700 to 0730 Monday 13 Jan Cooling water restriction Monday and Tuesday 13 and 14 Jan will limit platform operations Cryostat warmup begins 0700 Monday 13 Jan Another lab wide power outage currently scheduled for 0700 Friday 17 Jan Cryostat cold again on Saturday 25 Jan Limited access from Friday 31 Jan on... Search and secure ends shutdown on Tuesday 4 Feb Tevatron turn on Wednesday 5 Feb –first low luminosity store on Friday 7 Feb Six week shutdown tentatively scheduled for July-August 2003 –starting ~28 July –anticipate two week startup

7 Jan 03 Pre-Shutdown Studies CTT commissioning Discriminator studies Timing studies FPS map issues DB7 mystery Firmware status FPD readout commissioning Performance versus crossing number Noise Issues? Efficiency studies Tick and turn studies CPS gains FPS performance? FPS bias distribution optimize pedestal location for dynamic range? new discriminator scan procedure?

7 Jan 03 CFT+PS Three Week Shutdown Plans Warm cryostats (VLPC offline for ~2 weeks) –dilute contaminates in gas volume of cryostats –Move cassettes in cryostat? Sequencer backplane replacement? –cassette slot 46 link problems Complete personality and VSVX firmware installation Trigger firmware installation/testing as necessary Trigger hardware upgrades –Transition boards –power supply Verify trigger cabling where necessary –investigate link issues Address FPS map issues LED pulser upgrades –additional crate and pulser boards –software updates Studies –discriminators –trigger –FPS waveguide certification? FPD readout commissioning Routine and repeated platform and DAQ access

7 Jan 03 CFT+PS Infrastructure Sequencer crate 0x3 backplane replacement? Rearrange cassette assignments? –Move cassette in slot DB7? –Move cassettes in east cryostat? –Install cassettes in spare slots? Power supply issues –PS-2-B/+33V readback problem (151969) –measure backplane voltages? –calibrate Vicor voltage readouts? –separate CFT+PS from CAL BLS supply swaps –separate CFT+PS and SMT sequencer power? –remote control of AC input to AFE supplies –enhanced cooling for SMT sequencers? AFE cooling enhancements? –Double wide air dams for special locations –tighten ductwork –north side airflow booster? –cassette dummies in open slots? –Air filter retainers? Enhance protection of LVDS cable plant –LVDS strain relief?

7 Jan 03 CFT+PS Infrastructure Crate x53 VRBC replacement Enclose back of rack PC19 Smoke detectors on platform –test and optimize smoke detectors Install table between cryostat Install water barrier over cryostats Reduce light levels on the platform? –Curtains –dark air dams Identify and qualify spares –grey and fiber cables –VTM, VRB and VRBC –sequencers and sequencer controllers Replace fan filters at end of shutdown Verify AFE assignments CFT environment evaluation?

7 Jan 03 AFE Issues Sequencer firmware updates –facilitate scanning VSVX firmware updates –personalities too Address controls issues –bias readback issues –calibration of cassette temp sensors Address pedestal shifts with discriminator 1% firing Address dead channels Address hot channels Address SVX calibration issues Address data integrity issues PIC temperature calibration for remaining boards? Verify AFE map Verify that all AFEs have front air baffles installed What about low resistance AFE boards?

7 Jan 03 AFE Issues VLPC pixel breakdowns? Bias and Temperature Stability PIC temp calibration Bayonets –lubrication –red LEDs/missing LEDs AFE 1B5 module 3 temperature readback at 8.9K –26 Sept 02 (130024) even after board was replaced AFE 3A0 (480) check VSVX firmware –problems reading out VSVX in slot 5A0 AFE 6A5 module 8 slow temp control response –29 Nov 02 (154974)

7 Jan 03 FPS and LED Pulser Address FPS mapping issues Address FPS temperature control problems FPS pulser cable re-termination FPS waveguides tests LED pulser upgrades –robustness –software update –install additional crate –install additional LED boards –power supply installation upgrade –LED balancing –Decouple CFT from FPS –Communication to control station

7 Jan 03 CTT Resolve cassette slot 46 link issues Resolve CPS link issues Complete installation of new Glink transmitters Complete power supply upgrades Complete personality installation Strain relief for LVDS cabling? Verify LVDS cabling Link tests

7 Jan 03 Warm Cryostat? Install cassettes in slots 1, 3, 101 or else install baffles in those slots Cassette in slot 30 has loose retainer on upper PC mounting rail Cassette 67 (slot 11) LH mounting rail retraction failure Few individual pixels suffer from breakdowns

7 Jan 03 Other Ideas? CFT environment evaluation? –Purge gas replace transformers on SEQ for 1553? –Improve reliability of 1553 communications Unused AFE channels --smaller caps? AFE readout speed upgrade to 53 MHz? Commission spare slots? Re-route SEQ grey cables at SEQ backplane to improve access for diagnostics Re-organize VRB crates to equalize loads?