Application Development for Operations in the Coming Years Mike Lamont.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

AB / CO Review1 PS Complex Software for 2006 PS Complex Operation Teams & S. Pasinelli.
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
CERN Trip Report: April 4-8, 2011 LAFS Work Elliott McCrory April 20, 2011.
RAMSES PROGRAMME F. SZONCSO CERN – DGS/DI 31 st March 2014 CERN – GREECE INDUSTRY day1.
Stephane Deghaye (AB/CO) ATC/ABOC days.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
© 2001 By Default! A Free sample background from Slide 1 LEIR Application Project LEIR Applications is a separate project.
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1.
Linac2 Review  L2 operated with 99 % uptime in 2010 and 98% in the last 10 years  Systems review: all under control even for L2 till LS2 if ‘nightmare’
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
CERN Availability Working Group & Accelerator Fault Tracker Availability Working Group & Accelerator Fault Tracker - Where do we.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
IEFC Workshop 2011 Session 2: “MTE and High Intensity Operation” Short summary/Follow-up items V.Mertens / T.Zickler Presentations: M.GiovannozziMTE Roadmap.
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
LS1 – View from Applications BE-CO LS1 review – 1 December 2015 Greg Kruk on behalf of the Applications section.
Controls Issues Through the Backbone R. Steerenberg with help of many colleagues ATC – ABOC Days 23 January 2007 ATC – ABOC Days 23 January 2007.
Stephane Deghaye (AB/CO) The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
The OP Viewpoint on the Accelerator Complex Controls Renovation R. Steerenberg on behalf of the OP group Accelerator Complex Controls Renovation Workshop.
Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.
11/3/2010 CM15 Controls for LARP and LAFS - 1 Terri Lahey LARP/LAFS/CERN and SLAC.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
LEIR Ar11+ ISSUES FOUND DURING OPERATION S.PASINELLI BE-OP-AD.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
Fabio Follin Delphine Jacquet For the LHC operation team
SPS Applications Software issues - startup in 2006 and legacy problems
Accelerator Controls Renovation Project “ACCOR”
Controls & software Andy Butterworth.
J.-L. Sanchez Alvarez(PSB-EIC)
Status and Plans for InCA
Updated with comments 22 may 2017 Updated again 29 June 2017
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE-BI Software for LINAC4
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
LHC injection W. Bartmann, M.J. Barnes, C. Bracco, F. Burkart, E. Carlier, B. Goddard, V. Kain, R. Steerenberg, L. Stoel, F. Velotti, C. Wiesner, C. Xu.
Michael Benedikt AB/OP
Interlocking of CNGS (and other high intensity beams) at the SPS
Present and Future test facilities for High-intensity Targetry CERN
Presentation transcript:

Application Development for Operations in the Coming Years Mike Lamont

The development of operational application software by BE-OP does not systematically follow standard software development processes In order to ensure that operators are equipped with reliable software for the operation of LHC and its injectors, during the lifetime of the LHC, the Head of BE-OP should ensure that the processes used in BE-OP for future operational software development and for reporting problems follow the highest professional quality standards and are coherent across the four islets of the CCC. To this end, the head of BE-OP should reinforce the collaboration and the sharing of best practices in software development between BE-OP and BE-CO. Audit of the operation of LHC and its injectors 2

PS: “Pas mal” LHC: bloody impressive SPS: pretty good PSB: Needs INCAfying, but OK AD: eek! ISOLDE: heroes at work LEIR: INCA & LSA and it still works TI: excellent job in a heterogeneous world Present situation 3

LSA  Deployed in SPS, LHC, LEIR, transfer lines  Huge core – skeleton support  Many associated applications  Improvements, maintenance continually ongoing INCA  Deployed in PS, LEIR  PSB incoming  LSA inside – support critical Some excellent standard facilities in use across the complex:  eLogbook, fixed displays, SIS, YASP… Stand alone applications  Many, many (beam instrumentation, RF, working point control etc. etc.) plus legacy, orphans etc. Present situation 4

A mountain has been climbed and huge mountain of software has been developed over the last few years Excellent and good natured collaboration between OP and CO (and BI, ABT, PO, ABP, MA…) This software is valuable asset and allows proper exploitation of a very valuable resource (the accelerator complex) Important: this software needs TLC and an appropriate level of support Clearly there are issues and a continuing need for improvements Present situation 5

The functioning of the PS complex is still relying heavily on a large number of X-Motif applications, which are extremely important operational tools and need good support in case of problems. These applications will gradually be replaced, but this will take time. Progress will depend on system renovation, INCA implementation and available resources AD also uses archives, but problems with the archiving created a substantial loss of time in order to ensure that the data in the archives were correct Typical issues 6

Application development more-or-less handed over to OP  “Second job”  Fellows, Ph.D.s, external collaboration  Other groups (BI, ABP…) Note that this is not just “GUIs”  Some serious, very good stuff…  IQC, BQM, YASP, Settings Generation, BLMs, Lumi scan, Fidel Long operational years recently mean less time for development Evitable turnover of personnel Resulting in some orphans and less than ideal support of the big pile Development 7

OP resources Tight

Incoming LS1 – 2013/ Exactly what and how long – the subject of intense discussion Simon Baird

LS1 software deliverables 10 AD,LSA at least ISOLDE HIE ISOLDE High level controls LINAC4High level controls PSBINCAify booster LINAC4/PSB diagnostics PSINCA consolidation, renovation of various classes Continued LSAfication Xmotif eradication SPS & LEIRConsolidation, GUIs LHCConsolidation Re-work GUIs & improvements Cherries on cakes, fully integrated on-line model, etc… TIOperational Manpower requirements to be established

L4: standard software 11 Clear ongoing interest to leverage existing functionality G Bellodi -BE/ABP/HSL

L4: beam instrumentation 12

L4: beam instrumentation 2/2 13 G Bellodi -BE/ABP/HSL

L4: equipment control 14 G Bellodi -BE/ABP/HSL

L4: general purpose 15 All standard and existing facilities G Bellodi -BE/ABP/HSL

L4: interfaces ++/RTUs 16 G Bellodi -BE/ABP/HSL

Every new or renovated system requires writing or adapting the applications. The aim for 2013 is also to get a part of the "intelligence" that is presently in the GUI's. We also need to eradicate the X-motif applications as they have still to go through the XML RPC server slowing down the performances Some applications on the renovation list are: - LKTIM (flexible timing trees for RF) - t = f(t) (management of the timing settings (apart form RF) for all cycles - Make the proto-type extraction bump application in JAVA and extend it to include orbit length compensation by changing RF phase. - Bunch shape measurement - Tomoscope - Some sampler related application - Extra requirement that will come with LIU PS 17 Rende Steerenberg

: OP resources

When we get back from Barbados… 19 Provide non-LHC software applications [10.4 FTE] Provide LHC (LSA) software applications [3.4 FTE]

14 OP FTEs (to be confirmed)  Well-organized – serious progress possible Other groups  Specialized accelerator physics related applications External collaborations  LAFS… Fellows, VIAs, GETs, Ph.D.s Associates Resources 2013 (& part of 2014) 20 At first sight, enough manpower to mop up foreseen deliverables

Relatively healthy situation reflected in excellent performance of the complex Concerns about support levels in CO and a stretched OP group Foresee maintaining a holding pattern until the end of 2012  Maintenance and development at current levels Significant manpower to be made available in LS1  Should be sufficient to cover foreseen requirements:  LINAC4, Xmotif eradication… etc. Conclusions 21