1 CERN Trip Report: April 4-8, 2011 LAFS Work Elliott McCrory April 20, 2011

2 Outline  People  Jones and Lars (BI)  Sigerud & Deghaye (CO/AP)  Hatziangeli  Lamont  And, of course, Lahey.  Projects  Existing work  Potential Future Work  Personnel LAFS 2 20 April 2010

3 USD/CHF LAFS 3 20 April 2010 100 CHF = $111.17 (!)

4 Summary of Discussions  Beam Instrumentation Folks  Rhodri Jones & Lars Jensen Satisfied with Schottky work Proposed a new Daemon/GUI project for bunch-by-bunch measurement and display –Details coming…  BE/CO/Applications Folks  Katarina and Stephane They strongly acknowledge the good work that the LAFS team has provided and can provide –RBAC –Daemon Infrastructure –Operations Applications Propose a new project to help with InCA (Injector Controls Architecture) and LSA database configurations. –Details coming… LAFS 4 20 April 2010

5 Department Heads  Eugenia (BE/CO)  Will initiate the creation of a new M.O.U. for our bosses (Paul Collier and Roger Dixon)  Mike (BE/OP)  Described the week’s work, and the status of LAFS  They said  Words of encouragement  Would like to see more contributions LAFS 5 20 April 2010

6 Status of Existing Work Supertable Wire Scanner App Schottky Suite BSRT (Synchrotron Light) App

7 Supertable  Taken over by BE/CO (Mario Pereira)  Prototype is working  http://cern.ch/test-supertable http://cern.ch/test-supertable  Not online: Need work from DM LAFS 7 20 April 2010

8 Wire Scanner  Bunch-by-bunch capabilities fully integrated  Listened to lots of criticism/suggestions for improvement. LAFS 8 20 April 2010 New

9 New Feature: Mountain Range LAFS 9 20 April 2010

10 Schottky Suite  Daemon and GUI  Only bunch-by-bunch device active!  Well, there’s the Fast BCT, too.  BSRT is almost there.  Used extensively  Favier, Pieloni, Mounet  Just implemented:  Play List  Save/Restore LAFS 10 20 April 2010

11 Schottky Emittances LAFS 11 20 April 2010

12 LAFS 12 20 April 2010

13 Slot Selection GUI LAFS 13 20 April 2010

14 Schottky Play List LAFS 14 20 April 2010

15 Schottky Save/Restore LAFS 15 20 April 2010

16 Synchrotron Light  Unclear future for LAFS  They proposed that we write a Daemon  Started in early February  Was not accepted (late February)  Talk of having a new GUI created  Not good  Terri and I are paying attention! LAFS 16 20 April 2010

17 Proposals BI: Bunch data display CO/AP: LSA Config GUIs

18 Project Proposal: BI Bunch GUI  A new BI GUI  Imagined by Rhodri, Lars and Jean-Jacques Gras  Basics:  Gather bunch-by-bunch info from all BI devices that do bunch- by-bunch Schottky (Daemon) Fast BCT BSRT (soon)  Concentrated in one place a Daemon  Republish in coherent manner  Create a GUI Configure the Daemon Allow easy access to all bunch-by-bunch data  Proposal letter (pre-requirements) coming  Audience: LAFS team, BI group, P. Collier and R. Dixon. LAFS 18 20 April 2010

19 Proposal: LSA DB Config GUIs  Katarina and Stephane  Need a simpler way to configure the LSA device database  LSA Database being pushed into injector  Have existing tools, but must be replaced  Configure front ends directly, through a non-standard interface  But easy for PS-Complex operators to use  LHC/SPS Situation?  Only Extreme experts can configure  Requires raw SQL (through Benthic) LAFS 19 20 April 2010

20 LSA DB Config GUIs, cont’d  A limited number of GUIs are required  Less than ten?  But we would develop the pattern for making more  Stephane will write a proposal letter  Target: LAFS team, E. Hatziangeli, M. Lamont, P. Collier and R. Dixon.  Proposed team:  Deghaye would be the liaison  Katarina and Mike would designate a “customer”  LAFS team will decide on a work group LAFS 20 20 April 2010

21 Proposals: Next steps?  Awaiting these documents  Jones (Bunch data concentrator and GUI)  Stephane (LSA Configuration GUIs)  Eugenia (M.O.U. proposal)  Analyze LAFS work force  Now: 1.x FTE (Jerry and me), plus Terri.  Can we increase that number? Are *YOU* interested in these new projects??? LAFS 21 20 April 2010

22 Personnel  Liaison  Terri returns to SLAC soon Officially: May 31 Would like to extend  We have requested for Suzanne to be at CERN starting in October Support from Prebys and Dixon Official approval is pending  Elliott and Jerry C.: ~full time  The End LAFS 22 20 April 2010


Download ppt "CERN Trip Report: April 4-8, 2011 LAFS Work Elliott McCrory April 20, 2011."