To do for the next K0 beam time Department of Physics, Tohoku University H. Kanda.

Slides:



Advertisements
Similar presentations
Refrigeration Systems
Advertisements

Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Thermoforming Process
The MICE Target Lara Howlett University of Sheffield.
Interim Design Amy Eckerle Andrew Whittington Philip Witherspoon Team 16.
Absorber R&D and Test Results CM16 at RAL, Oct 8-11, 2006 Shoji Suzuki & Shigeru Ishimoto KEK.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
XEC Hardware Status MEG Review Meeting 2010 Liquid Xenon Group.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
Solar Cell conductive grid and back contact
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
NuMI NBI2006 September 6, 2006 NuMI Target Experience Jim Hylen / FNAL Page 1 Experience with the NuMI Target Max. Proton/spill Max. Beam Power Integrated.
Motivation Polarized 3 He gas target Solenoid design and test 3 He feasibility test Summary and outlook Johannes Gutenberg-Universit ä t Mainz Institut.
HD target.
20to2T5m100cm Images Van Graves February 13, 2014.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Position of the target cell A strange peak in the distribution of e + e - vertices and thoughtless alignment of the target 22 Aug H. Kanda.
LIEBE project: WP3 – Construction and tests Project coordination meeting – 30/01/ /01/2015 LIEBE project meeting1 M. Delonca on behalf of the WP3.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Target 18 Jun H. Kanda. To do list Aluminum cell (Type 2 and 3) –Mirapro: Invoices delivered, invoice for the shorter cell was requested PET pipe.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Separate production cell. Geometry and dimensions If the filling time is much shorter then the accumulation time then maximum of UCN density in the measurement.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Neutron detection in LHe ( HMI run 2004) R.Golub, E. Korobkina, J. Zou M. Hayden, G. Archibold J. Boissevain, W.S.Wilburn C. Gould.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 CDMS Status, Upgrades and Plans Summary of running at Soudan Cryogenic and.
Reporter: Hsieh, Tsung-Lin. Question A wire with weights attached to each end is placed across a block of ice. The wire may pass through the ice without.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Total photoabsorption on quasi free nucleons at 600 – 1500 MeV N.Rudnev, A.Ignatov, A.Lapik, A.Mushkarenkov, V.Nedorezov, A.Turinge for the GRAAL collaboratiion.
COMPASS polarized target for Drell-Yan Michael Pesek Charles University in Prague On behalf of COMPASS PT group PSPT, Charlottesville, Virginia
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
Study of T 1 relaxation time A proposal to test T 1 using a dilution fridge and SQUID NMA at Royal Hollow University,London.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
Installation of the T600 at Fermilab CSN2, September 22,
Simultaneous photo-production measurement of the  and  mesons on the nucleons at the range 680 – 1500 MeV N.Rudnev, V.Nedorezov, A.Turinge for the GRAAL.
A N DY Status Commissioning with colliding beams L.C.Bland, for AnDY 27 March 2012 Time Meeting, BNL.
Radioactivity Elements that emit particles and energy from their nucleus are radioactive. Some large atoms are unstable and cannot keep their nucleus together.
NATIONAL INSTITUTE OF NUCLEAR PHYSICS Legnaro National Laboratories Numerical simulation strategy for the SPES FEBIAD ion source INFN – CISAS collaboration.
Hall A Collaboration Meeting Slide 0 Measurements of Target Single-Spin Asymmetries in QE 3 He ↑ (e, e’) Update of QE A y (E05-015) experiment.
Shielding the turbomolecular pump and the vacuum gauge 11 June 2013 Kiril Marinov ASTeC, MaRS, DL 1.
SPS High Energy LSS5 Thermal contact & cooling aspects
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Initial Tests of the JLab Frozen Spin Target Chris Keith Target Group Jefferson Lab September 13, 2007 Brookhaven National Lab.
Installation of the T600 at Fermilab
IBD Detection Efficiencies and Uncertainties
Francois and Lau EATM 17 July 2012
MICE Meeting at RAL, Oct-23, 2005
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
RTML Vacuum System RDR Summary FermiLab October 24, 2007
Low Energy Target Irradiation at LERF
Thermoforming Process
Target and Horn status report
CRYOGENICS OPERATIONS 2008 Organized by CERN
Radioactivity Henri Becquerel discovered X-rays in As a result of his experiments, he also discovered other forms of rays that could be emitted.
Radiation Penetrating Power
Proposal for an Experiment: Photoproduction of Neutral Kaons on Deuterium Spokespersons: D. M. Manley (Kent State University) W. J. Briscoe (The George.
ACCSYS Collaboration Board Triestre, 3rd october 2017
Presentation transcript:

To do for the next K0 beam time Department of Physics, Tohoku University H. Kanda

18 Aug. 2006LNS Nuclear Physics Working Group2 “Next” what? The next beam times in September The next beam times in September Preparation status of the LD2 target and a vacuum gamma beam duct Preparation status of the LD2 target and a vacuum gamma beam duct The coming beam time already proposed and approved The coming beam time already proposed and approved Neutron detector for NKS2 Neutron detector for NKS2 Beam profile monitor Beam profile monitor The experimental plan to be proposed in the near future The experimental plan to be proposed in the near future Investigation of “ quasi-freedom ” of deuteron target Investigation of “ quasi-freedom ” of deuteron target

18 Aug. 2006LNS Nuclear Physics Working Group3 Preparation of the LD2 target We have modified our LD2 target We have modified our LD2 target elongation of the insertion part to fit the dimension of the 680 magnet elongation of the insertion part to fit the dimension of the 680 magnet new TMP port for speeding up the vacuum pumping new TMP port for speeding up the vacuum pumping Direct attachment of the TMP greatly worked to shorten the pumping period Old cryostat: Roughly 1 night to pump down to 1x10 -5 mbar for starting the refrigerator New cryostat: Only 1 hour to pump! Direct attachment of the TMP greatly worked to shorten the pumping period Old cryostat: Roughly 1 night to pump down to 1x10 -5 mbar for starting the refrigerator New cryostat: Only 1 hour to pump!

18 Aug. 2006LNS Nuclear Physics Working Group4 Preparation of the LD2 target Elongation should have changed the thermal condition inside the cryostat which will force modification of the liquefaction and vapor-suppressing method. Elongation should have changed the thermal condition inside the cryostat which will force modification of the liquefaction and vapor-suppressing method. Vapor-suppression is essential to reduce the ambiguity of the target density. However, vapor suppressed state is identified only by a phase diagram. Vapor-suppression is essential to reduce the ambiguity of the target density. However, vapor suppressed state is identified only by a phase diagram. We have to re-build the vapor-suppression method for the new cryostat and see the liquid without any vapor bubbles by our eyes. And the test of the long term (~ one week) stability is prefered. We have to re-build the vapor-suppression method for the new cryostat and see the liquid without any vapor bubbles by our eyes. And the test of the long term (~ one week) stability is prefered. These test should be finished until mid- September for the installation and the stable operation in the next next beam time. These test should be finished until mid- September for the installation and the stable operation in the next next beam time. Time course of the temperatures and phase diagram measured by the old cryostat. Operation point

18 Aug. 2006LNS Nuclear Physics Working Group5 What’s the trouble? The liquid deuterium is consisted of ICF34 flange, an aluminum shell (EB-welded), the polyimide film (adhered on the aluminum shell), and a flange for the liquid temperature monitor (sealed by an indium wire). The liquid deuterium is consisted of ICF34 flange, an aluminum shell (EB-welded), the polyimide film (adhered on the aluminum shell), and a flange for the liquid temperature monitor (sealed by an indium wire). Gas leak happened when the cell is refrigerated down to 150 ~ 200 K. Gas leak happened when the cell is refrigerated down to 150 ~ 200 K. REFINED: adhering method of polyimide film, tightening of ICF flange, tightening of indium seal REFINED: adhering method of polyimide film, tightening of ICF flange, tightening of indium seal LEAK TESTED (in LN2): an ICF flange, film surfaces, and adhered surfaces LEAK TESTED (in LN2): an ICF flange, film surfaces, and adhered surfaces TESTED but NOT ISOLATED: indium seal and flange for the thermometer (thermometer is adhered through the hole of the flange) TESTED but NOT ISOLATED: indium seal and flange for the thermometer (thermometer is adhered through the hole of the flange) The flange for the thermometer is now the most suspicious for the source of the leakage. The isolation of the seal and the flange itself is quit difficult... Blank flange is needed to be relieved that the seal is good. The flange for the thermometer is now the most suspicious for the source of the leakage. The isolation of the seal and the flange itself is quit difficult... Blank flange is needed to be relieved that the seal is good.

18 Aug. 2006LNS Nuclear Physics Working Group6 Preparation of the vacuum gamma beam duct Gamma beam travels through the air as long as 3.2 m (1.1x10 -2 X 0 ) after the collimator to the target. Gamma beam travels through the air as long as 3.2 m (1.1x10 -2 X 0 ) after the collimator to the target. A vacuum duct of 2 m long (4.4x10 -3 X 0 including film-windows: 50  m, and the remaining air) reduced the trigger rate by 30 % with  Tag=2MHz and 2mm thick acrylic target. A vacuum duct of 2 m long (4.4x10 -3 X 0 including film-windows: 50  m, and the remaining air) reduced the trigger rate by 30 % with  Tag=2MHz and 2mm thick acrylic target. A vacuum duct of 3 m long (9.9x10 -4 X 0 ) is now planned to replace the old one. Thinner film (25  m) will be used. The new one is estimated to reduce the trigger rate by 45 %. A vacuum duct of 3 m long (9.9x10 -4 X 0 ) is now planned to replace the old one. Thinner film (25  m) will be used. The new one is estimated to reduce the trigger rate by 45 %. Plan view of the pair magnet, the 680 magnet, and some elements for gamma beam line. gamma beam Pair magnet pump ~3.0m Pirani gauge

18 Aug. 2006LNS Nuclear Physics Working Group7 Neutron detector Multi-pion photoproduction experiment: LNS Exp#2551 was approved last year to run with the K0 photoproduction experiment: #2552. In the proposal, I commented to place the neutron detector at the forward of the NKS2.... No preparation is carried out so far. Multi-pion photoproduction experiment: LNS Exp#2551 was approved last year to run with the K0 photoproduction experiment: #2552. In the proposal, I commented to place the neutron detector at the forward of the NKS2.... No preparation is carried out so far. However, the neighbor of the NKS2 is too crowded now to place the large object as the neutron detector (a passage will be lost). However, the neighbor of the NKS2 is too crowded now to place the large object as the neutron detector (a passage will be lost).

18 Aug. 2006LNS Nuclear Physics Working Group8 Beam profile monitor The only solution to make room for the neutron detector is to remove the HSBPM by Ishikawa-san and Koutaku-san, which played the important role in the beam tuning period. The only solution to make room for the neutron detector is to remove the HSBPM by Ishikawa-san and Koutaku-san, which played the important role in the beam tuning period. X-ray imaging camera “ Remote RadEye ” might be one of the good replacements of the HSBPM and Polaroid films. Thanks to its small size, it will be easy to place it on the Lead glass counter. X-ray imaging camera “ Remote RadEye ” might be one of the good replacements of the HSBPM and Polaroid films. Thanks to its small size, it will be easy to place it on the Lead glass counter.

18 Aug. 2006LNS Nuclear Physics Working Group9 Investigation of “quasi-freedom” of the deuteron target In our result of pion photoproduction on proton and deuteron, interesting phenomena could be seen. In our result of pion photoproduction on proton and deuteron, interesting phenomena could be seen. The double pion photoproduction cross sections on free proton are consistent with the results from other experiments. The double pion photoproduction cross sections on free proton are consistent with the results from other experiments. The cross sections on quasi-free proton, namely proton in deuteron, are smaller than the results from other experiments. They resemble to the double pion photoproduction cross sections on quasi-free neutron. The cross sections on quasi-free proton, namely proton in deuteron, are smaller than the results from other experiments. They resemble to the double pion photoproduction cross sections on quasi-free neutron. The single pion photoproduction cross sections are in good agreement with the other results. The single pion photoproduction cross sections are in good agreement with the other results. Can deuteron be considered as the quasi-free target of nucleon? Which is the most likely view, in these words as quasi-, semi-, pseudo-, non-, and anti-? Can deuteron be considered as the quasi-free target of nucleon? Which is the most likely view, in these words as quasi-, semi-, pseudo-, non-, and anti-? Detailed analysis for final states will reveal more precise view of the “ quasi-freedom ” of the deuteron. (needs hermetic detector system and more statistics) Detailed analysis for final states will reveal more precise view of the “ quasi-freedom ” of the deuteron. (needs hermetic detector system and more statistics)

18 Aug. 2006LNS Nuclear Physics Working Group10 Cross sections for  p -> p  +  - and gp ->  ++  -

18 Aug. 2006LNS Nuclear Physics Working Group11 Cross sections for g”p” -> p  +  - compared with other results for “p” target and “n” target

18 Aug. 2006LNS Nuclear Physics Working Group12 Cross sections for  d -> pp  -

18 Aug. 2006LNS Nuclear Physics Working Group13 Summary I ’ m sorry for the delay of the preparation of the liquid deuterium target. I ’ m sorry for the delay of the preparation of the liquid deuterium target. I ’ m sorry for the delay of the preparation of a neutron detector. I ’ m sorry for the delay of the preparation of a neutron detector. Pion photoproduction experiment showed an interesting results. Detailed investigation will provide us of more interesting results. Pion photoproduction experiment showed an interesting results. Detailed investigation will provide us of more interesting results.