DOE Rev of Run IIb Sep 24-26, 2002 1 Detector Production WBS 1.1.4 James Fast Fermilab.

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
ATLAS Module building at Glasgow
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
L1 Support Structure Holding Fixture J. Fast 4/30/03 Revised 8/27/03.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
US Stave Core Production D. Lynn (BNL), LBNL Mechanical Meeting, Sep
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Module Flex status. 4 types: M4, M2, M1plane, M1mountain. constraint: components and bonding on the same side → folded wing geometry of the flex module.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
Thomas Jefferson National Accelerator Facility Page 1 SVT – Review January Sensors for the Silicon Vertex Tracker Amrit Yegneswaran.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
DOE Rev of Run IIb Sep 24-26, Run IIb Silicon Mechanical Design  Run IIa and IIb geometries  Sensor dimensions, numbers, and drawings  Hybrids,
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Dec
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
A suggestion for the naming of parts in Silicon Run IIb L. Bagby, E. Chabalina, A. Nomerotski, E. von Toerne + others February 2003.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Berkeley status Aug 10th, 2012.
Jim Fast Pacific Northwest National Laboratory
ATLAS pixel module assembly flow
QXF Coil Fabrication & Tooling Reaction / Impregnation
Ladder Assembly All tools and jigs produced Glue dispensing works
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
Equipment for Assembly – UK Experiences
FNAL Production Experience
Module/Ladder Assembly
Sidet Facilities A snap shot of space and equipment at Sidet and their current use Projected future uses and upgrades Hogan Nguyen, Fermilab May 22nd 2007.
Presentation transcript:

DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab

DOE Rev of Run IIb Sep 24-26, Detector Production Tasks  Tasks involved u Fabrication of mechanical and electrical preproduction modules and staves s Mechanical module prototypes by 11/12/02 s Mechanical stave prototypes 12/16/02 s Electrical L1 module prototypes by 1/27/03 s Electrical L2-5 module prototypes 2/18/03-4/15/03 s Electrical stave prototypes 7/17/03 u Fabrication of production modules for all layers u Assembly of L2-5 modules into staves u All testing required for Quality Assurance s Cecilia Gerber is managing electrical testing

DOE Rev of Run IIb Sep 24-26, L0 Modules  Total of 144 modules to be installed  Production rate of 2/day u Throughput of 1.6 good modules per day required u No CMM required for module assembly u Three sets of tooling will be fabricated  Production start driven by hybrids u Flex and sensors available 2 months earlier  Production duration 18+6 weeks, 3/22/04-9/7/04 u ~3-5 week lag for first modules to get through assembly, testing and QA u ~6 week lag for final modules (repairs)

DOE Rev of Run IIb Sep 24-26, L1 Modules  Total of 72 modules to be installed  Production rate of 2/day u Throughput of 1.5 good modules per day required u Use Zeiss 500 in Lab C, Lab D CMMs are backup u Two fixtures; extra parts to allow higher rate  Production start driven by hybrids u Sensors available 20 weeks earlier  Production duration 10+6 weeks, 1/29/04-5/20/04 u ~3-5 week lag for first modules to get through assembly, testing and QA u ~6 week lag for final modules (repairs)

DOE Rev of Run IIb Sep 24-26, L2-L5 Modules  Total of 672 modules to be installed, 800 built  Production rate of 8/day u Throughput of 5.2 good modules per day required u Use 5 Zeiss CMMs in Lab D, Total of 8 fixtures u Tooling designed to allow for higher capacity per CMM in case of machine down time  Production start driven by hybrids  Production duration 12+6 weeks, u South Modules 3/16/04-7/23/04 u North Modules 6/15/04-10/27/04 u ~3-5 week lag for 1st modules to get through assembly, testing and QA u ~6 week lag for final modules (repairs)

DOE Rev of Run IIb Sep 24-26, L1-L5 Module Tooling  6 flavors of fixture u L1 (160mm finished module length) u 20cm gang, 10-10A, 10-10S (200mm modules) u 20-20A, 20-20S (400mm modules)  Alignment and Gluing  Precision alignment of sensor to sensor <5   Alignment of hybrid to sensors to ~50   Module flipping u Backside HV connection from hybrid u Kapton HV insulation to isolate sensor from structure u Ground contact from hybrid for support structure  Wirebonding u Axial and stereo can be bonded on same fixtures (4 types)  Reasonably flat (~50  ) vacuum chucks up to 400mm long

DOE Rev of Run IIb Sep 24-26, L1 Module Fixture

DOE Rev of Run IIb Sep 24-26, L1 Flipping Fixture

DOE Rev of Run IIb Sep 24-26, L1 Wirebonding Fixture

DOE Rev of Run IIb Sep 24-26, Axial Module Fixture

DOE Rev of Run IIb Sep 24-26, Module Production Flow I

DOE Rev of Run IIb Sep 24-26, Module Production Flow II

DOE Rev of Run IIb Sep 24-26, CMM Usage for Production

DOE Rev of Run IIb Sep 24-26, L2-5 Stave Assembly I  Duration of 19.4 weeks, including electrical testing u South: 7/23/04-12/4/04 u North: 10/27/04-3/25/05  Day 1 u Vacuum fixture, 600mm long, holds core flat u Two vacuum chucks hold axial modules flat and locate them to reference pins of stave core  Day 2 u CMM inspection of axial module locations u Stave core with axial modules is flipped u Two vacuum chucks hold stereo modules flat and locate them to reference pins of core s The same pins used for CMM reference to reduce alignment error between axial and stereo sides

DOE Rev of Run IIb Sep 24-26, L2-5 Stave Assembly II  Day 3 u CMM inspection of stereo module locations u Electrical testing of modules u Installation of C-channels (mechanical stiffeners for stave)  Day 4 u Final electrical testing u Final mechanical inspection u Certification for installation  Small subset may be submitted to additional mechanical testing, e.g. deflection tests

DOE Rev of Run IIb Sep 24-26, L2-L5 Stave Assembly Fixture

DOE Rev of Run IIb Sep 24-26, L0-L1 Production Schedule  L0 and L1 Module Assembly Run in Parallel u L0 Module Assembly 3/22/03-9/7/04 u L1 Module Assembly 1/29/04-5/20/04  Mounting of Module on Supports u L0 and L1 go in parallel s L0 South 5/7/04-7/19/04 s L1 South 4/19/04-6/28/04 u North follows South L0-L1 Mating s L0 North 8/24/04-11/2/04 s L1 North 8/24/04-11/2/04  L0-L1 Mating and Testing u South 8/17/04-9/7/04 u North 12/3/04-12/23/04

DOE Rev of Run IIb Sep 24-26, L2-L5 Production Schedule I  Ganging of sensors into 20cm readout segments precedes arrival of hybrids (complete 1/30/04)  Parallel processing of modules for each stave set u South Modules (3/16/04-7/23/04) u North Modules (6/15/04-10/27/04)  All South Stave modules completed before start of stave assembly u Human resource limitations drive this sequence s Electrical testing personnel: L2 hybrids, North modules, L0 north modules, L0 and L1 South module mounting concurrent s High level mechanical: Startup of L0 and L1 South module mounting concurrent

DOE Rev of Run IIb Sep 24-26, L2-L5 Production Schedule II  Sequential assembly of staves u 6 weeks “overlap” is testing&repair of all staves u South Staves (7/23/04-12/4/04) u North Staves (10/27/04-3/25/05)  All Staves completed prior to start of installation in cylinders u Driven by available CMM resources s B&S and Zeiss 850 completing North staves s LK completing L0-L1 subassemblies

DOE Rev of Run IIb Sep 24-26, Summary  Module and Stave production schedules, including CMM usage, and interface between mechanical and electrical tasks, are well understood.  The tooling design for modules is flexible so that we can easily increase production rate.  Initial fixture designs are complete for L1-5 modules and nearly complete for staves.  Initial module fixtures have been ordered.  Initial stave fixtures to be ordered this month.  On track for mechanical modules by 11/12 and mechanical staves by 12/16.