Former DuPont Barksdale Works Project Update December 14, 2006 Great Lakes Visitors Center DuPont CRG.

Slides:



Advertisements
Similar presentations
Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Advertisements

Chequamegon National Forest Clover and Cabin Lake Sites – Site Investigation Update and Path Forward.
Proposed Land Use & Development Regulations Public Hearing Month Day, 2012.
Update on the Remedial Action at the Wood Hollow Training Area MRS November 6, 2014 Jeff Fitzmayer Parsons.
Case Study of Subsurface Vapor Intrusion at a Dry Cleaner Site Amy Goldberg Day AEHS Annual East Coast Conference on Soils, Sediments.
U.S. Environmental Protection Agency Technical Assistance Services for Communities 2012 Review of Preliminary Phase II Groundwater Report J. Stuart Wiswall,
U.S. Environmental Protection Agency Technical Assistance Services for Communities 2012 Review of Preliminary Phase II Groundwater Report J. Stuart Wiswall,
Click to continue…. Railroad Track wetland Image Date: December 2003.
BoRit Superfund Site Timeline
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
Further Site Investigation Sutton Walls Former Landfill
SWMU 48, 62 and AOC G/SWMU 49 Update Joint Base Charleston Weapons Partnering Meeting December 4, 2013.
River Corridor Closure Project Safety People Results U.S. Department of Energy Richland Operations Office 100 Area and 300 Area Component of RCBRA Steve.
Federal Mogul Department for Environmental Protection Kentucky Division of Waste Management February 10, 2015 Presented by Chris Jung To Protect and Enhance.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
H23A14 Briton Ferry Gas Works Land Contamination Antreas Christodoulides Georgios Efstathiou Antreas Christodoulides Georgios Efstathiou.
Environmentally Impaired Property Transaction Analysis Combining Decision Trees and Monte Carlo Simulation Timothy Havranek and Poh Boon Ung October 2007.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Airport Road Waste Disposal Area April 28, 2005 The University of North Carolina at Chapel Hill.
DuPont Barksdale and Chequamegon Projects Update December 12, 2007 DuPont CRG Great Lakes Visitors Center.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
EnviroSense, Inc. An Overview of Environmental Factors in Developing Brownfields Sites in Massachusetts Presented By: Eric S. Wood, P.Hg., PG, LSP President.
Former DuPont Barksdale Works Project Update June 07, 2006 Great Lakes Visitors Center DuPont CRG.
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
Former DuPont Barksdale Works Project Update August 3, 2005 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Former DuPont Barksdale Works Project Update December 14, 2005 Great Lakes Visitors Center DuPont CRG.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
COMMITMENT & INTEGRITY DRIVE RESULTS Risk Based Corrective Action Using site-specific risk assessment to achieve Regulatory Closure.
DuPont Barksdale and Chequamegon Projects Update July 22, 2008 DuPont CRG.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site August 20, 2013.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Fairbanks Areawide Industrial Reclamation Project ADEC AREAWIDE MANAGEMENT GOALS Janice Wiegers ADEC.
Agency for Toxic Substances and Disease Registry Division of Health Assessment and Consultation Meeting Agenda Monday, September 27, :30 pmMeet and.
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Waste Management Strategy Outline - Geography - Future Needs – 5 and 25-Year Time Frames - Capacity - Near-Term Needs - Long Term Needs.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
The Superfund ERA Process. What is Superfund? Superfund was created on December 11, 1980 when Congress enacted the Comprehensive Environmental Response,
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
North West Study Area Staff Recommendation Tuesday, September 22, 2009.
Congratulations! It’s a Burn Dump. What Do You Do Now? LEA/CIWMB PARTNERSHIP CONFERENCE Anaheim, California May , 2005 California Environmental.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
By Mitch Cooper & Haley Herbert January 1987 Vertac site manufactured herbicides 1978 National Dioxin Survey 1983 Site placed on the National.
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
Groundwater Protection Project Greg Robison Project Manager Ed Sullivan Consulting Engineer June 23, 2008.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Tulsa Fuel & Manufacturing Superfund Site Remedial Design and Cleanup Plans September 2014.
Results of 2001 Barksdale Site Investigation April 2, 2002 Presented by: DuPont Corporate Remediation Group.
1. 2 Presentation Highlights BGOU overview Scope of the Remedial Investigation Investigation results Schedule 2.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
Marshall Landfill Site.  Patrick Cabbage, Hydrogeologist/Site Manager  Bill Fees, Engineer  Carol Bergin, Public Involvement Coordinator.
Prepared by: Alex Fisch Planning Services Division.
Vision for Menomonee River Valley Economically, with strong companies and jobs near workers’ homes; Geographically, with renewed ties to the surrounding.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Is The Marcellus Fairway Also A Pathway To Brownfield Redevelopment? Hull & Associates, Inc. National Brownfields Conference Philadelphia, Pennsylvania.
1 Historic DoD Ocean Disposal Operations, Requirements, and Research Hawaii Robotics Initiative for Underwater Military Munitions Oahu, Hawaii October.
Omaha Riverfront Redevelopment Project Brownfields 2004 C. Dale Jacobson, P.E., DEE.
Proposed Plan for No Further Action
Anniston PCB Site Review of Risk Assessments for OU-1/OU-2
Chemical Metals Industries, Inc. (CMI)
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
Presentation of 2002 Barksdale Investigations and Path Forward
Chemical Metals Industries, Inc. (CMI)
Olusola Ayilara, P.E., P.G. PST-DCRP Section, Remediation Division
Presentation transcript:

Former DuPont Barksdale Works Project Update December 14, 2006 Great Lakes Visitors Center DuPont CRG

December 14, 2006Former DuPont Barksdale Works2 DuPont Company Representatives n Brad Nave – Project Director, DuPont Corporate Remediation Group n Jon Hammerberg – Senior Project Engineer, URS Corporation

December 14, 2006Former DuPont Barksdale Works3 Purpose of Meeting n Provide an update on site priorities and public commitments n Provide an update on work completed in 2006 and preliminary results n Discuss next steps

Barksdale Project Priorities and Commitments Review Brad Nave

December 14, 2006Former DuPont Barksdale Works5 Project Priorities Four Project Priorities: 1. Continue to provide drinking water that meets appropriate Wisconsin regulatory standards for all site-related compounds to residents with impacted wells 2. Develop plan for long-term drinking water supply and implement as appropriate 3. Evaluate for potential off-site surface water issues and take appropriate action 4. Identify priority source areas and take appropriate action

December 14, 2006Former DuPont Barksdale Works6 Project Priorities Other Commitments: – Continue to work with WDNR in the investigation/cleanup of site impacts – Continue to be available and communicate with neighbors – Fulfill commitments on Home Value Protection Plan

December 14, 2006Former DuPont Barksdale Works7 Alternative Water Supply n Alternative Water Supply – To date, DuPont has been billed $115.6M and paid over $114.3M in related water supply costs to Washburn n Managing invoices, supply, and maintenance with Washburn

December 14, 2006Former DuPont Barksdale Works8 Home Value Protection Plan Home Value Protection Program has expired. – DuPont fulfilled all commitments and obligations n Last property (vacant lot) sold on June 23, 2006

2006 Site Investigation Jon Hammerberg

December 14, 2006Former DuPont Barksdale Works Site Investigations n Purpose of investigations: – Evaluate suitability of selected site areas for recreational use – Continue characterizing former production areas – Prioritize areas for future activities

December 14, 2006Former DuPont Barksdale Works Site Investigations n 800 samples from 4 geographic focus areas – Northern Production Area: (274 acres) site of former manufacturing and support operations – Northern Grid Area: (305 acres) lightly or undeveloped grounds inside the plant fence – Southern Area: (443 acres) product storage and undeveloped grounds inside the plant fence – Off Site Areas: (117 acres) residential and undeveloped grounds outside the plant fence

December 14, 2006Former DuPont Barksdale Works Site Investigation Map

December 14, 2006Former DuPont Barksdale Works13 Northern Area Investigation n Continued site characterization via – Trenching in former production areas – Discrete soil sampling at biased locations – Grid sampling generally in undeveloped areas – Geophysical survey of waste sites – Clearing (4.3 miles of new roads, 17 miles cleared) – Installation of 6 wells and interior groundwater sampling – Surface water and sediment sampling n Recovered and disposed TNT during investigation – ~2,000 pounds of TNT recovered to date – ~500 pounds recovered in 2006 n Evaluated perchlorate distribution in groundwater and soils

December 14, 2006Former DuPont Barksdale Works14 n Insert. Northern Area Investigation Maps

December 14, 2006Former DuPont Barksdale Works15 Southern Area Investigation n Continued site characterization – Supplemental sampling in areas where elevated concentrations of inorganic constituents were detected in 2005 n Discrete soil sampling at biased locations n Grid sampling

December 14, 2006Former DuPont Barksdale Works16 n Insert. Southern Area Investigation Map

December 14, 2006Former DuPont Barksdale Works Investigations Findings n Findings in undeveloped areas: – Large portions of the northern and southern undeveloped areas are acceptable for current recreational use n Approximately 438 of the 443 acres in the southern area are below site-specific recreational screening levels n Grid locations that exceed site-specific screening levels are principally confined to roadways and railroad beds n Arsenic responsible for most of the risk in the south n Area-wide cumulative risks within frequently used southern transportation corridors are in acceptable range for current use n Explosive compounds do not significantly contribute to overall risk in the southern area n Approximately 300 of the 305 acres within the northern gridded area appear to be acceptable for the current recreational use based on preliminary data evaluation

December 14, 2006Former DuPont Barksdale Works18 n Insert map 2006 S Risk & Corridor

December 14, 2006Former DuPont Barksdale Works19 n Insert maps/pictures of issues/findings. Draft Northern Area Undeveloped Area Investigation Results 1.Does not include biased samples 2.Results compared to site-specific recreational RCLS

December 14, 2006Former DuPont Barksdale Works Investigations Findings n Findings in production or waste areas – 18 of 21 areas on site have been investigated; the 3 yet to be evaluated potentially contain nitroglycerin and require different sampling procedures. – Products visible at the surface in 2/3rds of the areas evaluated and in the subsurface (> 2ft bgs) in half of the areas evaluated – Products are generally encountered along former process buildings and ditches; some located beneath building slabs – Product found in five buried waste and debris deposits (0.5 to four acres in size) located across the site – Potential asbestos containing material visible in 5 of the 18 areas evaluated

December 14, 2006Former DuPont Barksdale Works21 Perchlorate n Concentrations in groundwater onsite range between non-detect (at 0.01) to 1,200 parts per billion n The majority of the boundary groundwater results were less than 1 ppb – Three exceptions are observed downgradient of former burning ground south of Barksdale Village and north of Boyd’s Creek. East of HWY 13 perchlorate was detected at 250 ppb in groundwater n Perchlorate was not detected in the two potable wells sampled on-site n Concentrations in soil (ranged from non-detect to 2.2 mg/Kg) are below the residential screening value (55 mg/Kg)

December 14, 2006Former DuPont Barksdale Works22 n Insert maps/pictures of issues/findings.

Path Forward Brad Nave

December 14, 2006Former DuPont Barksdale Works24 Near Term Path Forward n Complete Current Conditions Report n Continue investigation – Production areas n Follow-up in previously investigated areas n Characterization of areas previously not investigated – Three dynamite/ nitroglycerine areas n Continue to understand NX distribution and contribution to risk – Northern Undeveloped Areas n Continued investigation and risk screening as determined by output of 2006 data evaluation n Meet commitments regarding municipal water supply n Research at GA Tech and on-site n Share results with WDNR and community members

Chequamegon-Nicolet National Forest Update Brad Nave

December 14, 2006Former DuPont Barksdale Works Chequamegon National Forest Work n National Forest Service contacted DuPont in April 2006 regarding two reported former detonation cladding sites n DuPont and the Forest Service developed a framework for future actions and the technical approach for a geophysical investigation at both sites n Field work begun in October to delineate the extent of metallic debris at the Clover and Cabin Lake sites n Delineation of debris completed at the Cabin Lake site n Debris delineation partially complete at the Clover site, work will resume in 2007 when weather allows

December 14, 2006Former DuPont Barksdale Works27

December 14, 2006Former DuPont Barksdale Works Cabin Lake Work n Insert map CABIN LAKE

December 14, 2006Former DuPont Barksdale Works Clover Results n Insert map OPERATORS STATION North Pad South Pad

December 14, 2006Former DuPont Barksdale Works Chequamegon National Forest Work n Continue delineating metal at the Clover site n Report 2006 findings for both sites n Work with the Forest Service to develop and execute a soil sampling program at both sites

December 14, 2006Former DuPont Barksdale Works31 Questions or comments?